![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
DL/T 684-2025 Guide of calculating settings of relay protection for large generator and transformer
Issued on: 2025-09-28 Price(USD): |
|
GB/T 45905.1-2025 Electricity spot market operation - Part 1: Terminology
Issued on: 2025-8-1 Price(USD): 255.0 |
|
GB/T 45905.8-2025 Electricity spot market operation - Part 8: Calculation method of multi-period power and energy balance
Issued on: 2025-8-1 Price(USD): 150.0 |
|
GB/T 45906.2-2025 Substation secondary system - Part 2: Data and model
Issued on: 2025-8-1 Price(USD): 645.0 |
|
GB/T 45906.3-2025 Substation secondary system - Part 3: Communication message specification
Issued on: 2025-8-1 Price(USD): 1050.0 |
|
GB/T 45906.1-2025 Substation secondary system - Part 1: General requirement
Issued on: 2025-8-1 Price(USD): 180.0 |
|
GB/T 45905.10-2025 Electricity spot market operation - Part 10: The evaluation of operation
Issued on: 2025-8-1 Price(USD): 270.0 |
|
GB/T 45906.8-2025 Substation secondary system - Part 8: Preventing electric mal-operation
Issued on: 2025-8-1 Price(USD): 210.0 |
|
GB/T 45906.9-2025 Substation secondary system - Part 9: Construction specifications
Issued on: 2025-8-1 Price(USD): 210.0 |
|
GB/T 45906.10-2025 Substation secondary system - Part 10: Test and detection
Issued on: 2025-8-1 Price(USD): 315.0 |
|
GB/T 45906.6-2025 Substation secondary system - Part 6: Substation monitoring and control system
Issued on: 2025-8-1 Price(USD): 255.0 |
|
NB/T 11794-2025 Guide for item segregation of system design expense for high-voltage direct current (HVDC) transmission project
Issued on: 2025-06-30 Price(USD): 330.0 |
|
GB/Z 44789-2024 Requirements for microgrid dynamic control
Issued on: 2024-10-26 Price(USD): 210.0 |
|
T/CASME 2036-2025 Application specification for artificial intelligence-assisted decision-making system of smart grid dispatching control
Issued on: 2025-07-25 Price(USD): |
|
GB/T 45568-2025 Information specification for relay protection
Issued on: 2025-04-25 Price(USD): 270.0 |
|
GB/T 45527-2025 Technical specification at the project level for assessment of greenhouse gas emission reductions—Power energy substitution projects
Issued on: 2025-04-25 Price(USD): 315.0 |
|
GB/T 45223-2025 Technical specification for communication architecture and interface of low voltage auxiliary power systems for electric power stations and substations
Issued on: 2025-01-24 Price(USD): 645.0 |
|
T/ZSDX 002-2025 Technical Specification for Cabin of High Voltage/Low Voltage Prefabricated Substation
Issued on: 2025-07-22 Price(USD): |
|
T/CEC 5110-2025 Standardized report form of commissioning test for protection and automatic equipment
Issued on: 2025-03-04 Price(USD): |
|
T/CEC 5111-2025 Modeling specifications for the three-dimensional design of distribution network project
Issued on: 2025-03-04 Price(USD): |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||