Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
LoginRegister
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
DL/T 875-2004 Basic requirements for design and test of construction machines and tools of overhead transmission line 300.0 via email in 1~3 business day superseded
DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering 100.0 via email in 1 business day valid
DL/T 829-2002 Technical reqirements for stoking single phase alternating current induction watt-hour meter 300.0 via email in 1~3 business day valid
DL/T 824-2002 Performance acceptance guide of steam turbine electro-hydraulic control system 240.0 via email in 1~3 business day valid
DL/T 851-2004 Acceptance tests for combined-cycle power plants 330.0 via email in 1~3 business day valid
DL/T 818-2002 Technical guide for carbide phase analysis of low alloy heat resistant steels 300.0 via email in 1~3 business day valid
DL/T 367-2010 Specification of instrumentation and control for large scale fan in fossil fuel power plant 120.0 via email in 1~3 business day valid
DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction 480.0 via email in 1~3 business day valid
DL/T 467-2004 Performance test for pulverizers and pulverizing systems of power station 840.0 via email in 1~3 business day valid
DL/T 5399-2007 Design guide for vertical shiplift in hydropower and water resources projects 300.0 via email in 1~3 business day valid
NY/T 1137-2006 Erection regulations for small wind turbine generator off-grid system 90.0 via email in 1~3 business day valid
DL/T 5018-2004 Specification for Manufacture Erection and Acceptance of Steel Ga 400.0 via email in 1 business day superseded
DL/T 812-2002 Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method 180.0 via email in 1~3 business day valid
DL/T 654-2009 The technical guide for the life assessment of units in fossil-fuel power plant 660.0 via email in 1~3 business day valid
DL/T 5017-2007 Specification for Manufacture Installation and Acceptance of Steel Penstocks in Hydroelectric and Hydraulic Engineering 480.0 via email in 1 business day valid
DL/T 782-2001 Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above 330.0 via email in 1~5 business day valid
DL/T 5358-2006 Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering 555.0 via email in 1~5 business day valid
DL/T 822-2002 Code for Test and Acceptance of Computer Monitoring and Control Sy 200.0 via email in 1 business day superseded
DL/T 468-2004 Guide on type selection and application for power boiler fans 810.0 via email in 1~3 business day valid
GB/T 8564-2003 Specification for Installation of Hydraulic Turbine Generator Uni 260.0 via email in 1 business day valid
About Us | Contact Us | Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | Send me a messageQQ: 672269886
Copyright: Codeofchina Inc 2008-2020