Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
SD 240-1987 |
Criteria of Unified Numbering for Power SystemEquipment |
150.0 |
via email in 1~3 business day |
superseded,2017-5-1,1987-11-24 |
|
DL/T 5444-2010 |
Regulation of content and profundity for power system design |
240.0 |
via email in 1~3 business day |
valid,,2010-12-15 |
|
DG/T J08-2024-2007 |
Code of High Voltage Electrical Installations |
340.0 |
via email in 1 business day |
valid,,2007-9-1 |
|
SDJ 065-1982 |
Working Regulation for Safety of Electrie Power Construction (Overhead Transmission Line Section) |
435.0 |
via email in 1~5 business day |
valid,,1989-3-17 |
|
DL/T 5461.14-2013 |
Regulations for Content and Depth of Detailed Design Documents of Fossil-fired Power Plant - Part 14: Hydraulic Structure |
720.0 |
via email in 1~3 business day |
valid,,2014-4-1 |
|
DL/T 5439-2009 |
Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the system |
300.0 |
via email in 1~3 business day |
valid,,2009-12-1 |
|
GB/T 50980-2014 |
Design Code of Power Dispatching and Communication Center Project |
630.0 |
via email in 1~8 business day |
valid,,2014-12-1 |
|
HJ 2039-2014 |
Technical specifications for dedusting engineering of thermal power plants |
1084.0 |
via email in business day |
valid,,2014-9-1 |
|
DB33/T 2004-2016 |
Assessment guideline of existing building rooftop for distributed photovoltaic power generation |
|
via email in business day |
valid,,2016-6-12 |
|
DL/T 5156.4-2002 |
Electric power engineering surveying drawings Part 4:Hydrogeology |
630.0 |
via email in 1~8 business day |
superseded,2015-9-1,2002-9-1 |
|
DB37/T 3202-2018 |
Implementation guide of safety production risk grading control system for enterprises in power generation industry |
|
via email in business day |
valid,,2018-6-17 |
|
NY/T 1704-2009 |
Biogas power generation technology criterion |
220.0 |
via email in 1~3 business day |
valid,,2009-5-1 |
|
DL/T 5142-2012 |
Code for designing ash handling system of power plant |
420.0 |
via email in 1 business day |
valid,,2012-12-1 |
|
SDJ 059-1979 |
Code of Election and Acceptance for Power Plant Construction (Socket and Spigot Type Prestressed Concrete Pressure Pipeline Section) |
|
via email in business day |
valid,,1989-3-17 |
|
DL/T 5156.1-2002 |
Electric power engineering surveying drawings |
660.0 |
via email in 1~8 business day |
superseded,2015-9-1,2002-9-1 |
|
DL 5011-1992 |
The code of erection and acceptance of electric power construction section of steam turbine set |
4500.0 |
via email in 1~10 business day |
abolished2012-03-01,2012-3-1,1992-1-1 |
|
DL/T 5156.5-2002 |
Electric power engineering surveying drawings Part 5:Geophysical prospecting |
880.0 |
via email in 1~8 business day |
superseded,2015-9-1,2002-9-1 |
|
SDJ 063-1982 |
Working Regulation for Safety of Electrie Power Construction (Electricity and Thermal Control Section) |
450.0 |
via email in 1~5 business day |
valid,,1989-3-17 |
|
DJ 57-1979 |
The code of election and acceptance for power plant construction-welding section |
450.0 |
via email in 1~5 business day |
valid,,2003-7-1 |
|
SD 115-1986 |
Specifications for Operation Management of Power System |
150.0 |
via email in 1~3 business day |
valid,,2000-12-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
Next
End
|