2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50540-2009
GB 50540-2009   Code for construction of pipe process in oil and gas transmission pipeline station (English Version)
Standard No.: GB 50540-2009 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 19000 words Translation Price(USD):470.0 remind me the price change

Email:

Implemented on:2010-6-1 Delivery: via email in 1 business day

→ → →

,,2010-6-1,14113818188365D9533C046E77D38
Standard No.: GB 50540-2009
English Name: Code for construction of pipe process in oil and gas transmission pipeline station
Chinese Name: 石油天然气站内工艺管道工程施工规范
Professional Classification: GB    National Standard
Source Content Issued by: MOC
Issued on: 2009-11-30
Implemented on: 2010-6-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 19000 words
Translation Price(USD): 470.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to ensuring the construction quality of oil and gas station processing pipeline project and achieving safety, environmental protection and application. 1.0.2 This standard is applicable to the construction of station process pipeline engineering related to newly-built or rebuilt ( extended) crude oil, natural gas, coal gas and refined oil. 1.0.3 This code is not applicable to the construction of pipeline in the petroleum refining chemical plant and natural gas conditioning plant, the affiliated to the principal equipment parts such as the pump, heating furnace, flowmeter and skid-mounted equipment 1.0.4 This code specifies the basic technical requirements of pipeline engineering construction in the oil and gas station. Where the code disagrees with requirements of national laws and administrative regulations, the requirements of the national laws and administrative regulations shall apply. 10.5 Except that the requirements of code shall be met in the construction of oil and gas station process pipeline project, the requirements of relevant current national standards shall be complied with.
1 General Principles 2 Terms 3 Preparation Of Construction 4 Inspection And Storage On Materials, Pipe Fittings And Skid-Mounted Equipment 4.1 General Requirements 4.2 Inspection on Material, Pipe Fittings And Skid-Mounted Equipment 4.3 Storage of Materials, Pipe Fittings And Skid-Mounted Equipment 5 Cutting and Processing 5.1 Steel Pipe Cutting 5.2 Processing on Pipe fitting 5.3 Prefabrication of Pipeline Unit 6 Installation of Pipelines 6.1 General Requirement 6.2 Installation of Pipes 6.3 Installation of Valves 6.4 Fabrication And Installation of Pipe Fittings 7 Welding 7.1 General Requirements 7.2 Welding Material 7.3 Welding 7.4 Inspection and Acceptance of Weld Joint 8 Ditching, Lowering-in and Backfilling 8.1 Ditching 8.2 Lowering-in 8.3 Ditch Backfilling 9 Blowing and Pressure Test 9.1 General Requirements 9.2 Blowing and Washing 9.3 Test on Strength and Tightness 9.4 Drying 10 Corrosion Resistance and Thermal Insulation 10.1 General Requirement 10.2 Corrosion Resistance 10.3 Thermal Insulation 11 Health, Safety and Environment 12 Delivery of the project Appendix A Groove Type of Butt-joint Between Pipes Explanation of Wording in this Code
GB 50540-2009 is referred in:
* SY/T 0460-2010 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
* SY 4118-2010 Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
* SY 4118-2010 Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
* SY/T 0460-2010 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
* GB 50251-2015 Design code for gas transmission pipeline engineering
Code of China
Standard
GB 50540-2009  Code for construction of pipe process in oil and gas transmission pipeline station (English Version)
Standard No.GB 50540-2009
Statusvalid
LanguageEnglish
File FormatPDF
Word Count19000 words
Price(USD)470.0
Implemented on2010-6-1
Deliveryvia email in 1 business day
Detail of GB 50540-2009
Standard No.
GB 50540-2009
English Name
Code for construction of pipe process in oil and gas transmission pipeline station
Chinese Name
石油天然气站内工艺管道工程施工规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOC
Issued on
2009-11-30
Implemented on
2010-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
19000 words
Price(USD)
470.0
Keywords
GB 50540-2009, GB/T 50540-2009, GBT 50540-2009, GB50540-2009, GB 50540, GB50540, GB/T50540-2009, GB/T 50540, GB/T50540, GBT50540-2009, GBT 50540, GBT50540
Introduction of GB 50540-2009
1.0.1 This code is formulated with a view to ensuring the construction quality of oil and gas station processing pipeline project and achieving safety, environmental protection and application. 1.0.2 This standard is applicable to the construction of station process pipeline engineering related to newly-built or rebuilt ( extended) crude oil, natural gas, coal gas and refined oil. 1.0.3 This code is not applicable to the construction of pipeline in the petroleum refining chemical plant and natural gas conditioning plant, the affiliated to the principal equipment parts such as the pump, heating furnace, flowmeter and skid-mounted equipment 1.0.4 This code specifies the basic technical requirements of pipeline engineering construction in the oil and gas station. Where the code disagrees with requirements of national laws and administrative regulations, the requirements of the national laws and administrative regulations shall apply. 10.5 Except that the requirements of code shall be met in the construction of oil and gas station process pipeline project, the requirements of relevant current national standards shall be complied with.
Contents of GB 50540-2009
1 General Principles 2 Terms 3 Preparation Of Construction 4 Inspection And Storage On Materials, Pipe Fittings And Skid-Mounted Equipment 4.1 General Requirements 4.2 Inspection on Material, Pipe Fittings And Skid-Mounted Equipment 4.3 Storage of Materials, Pipe Fittings And Skid-Mounted Equipment 5 Cutting and Processing 5.1 Steel Pipe Cutting 5.2 Processing on Pipe fitting 5.3 Prefabrication of Pipeline Unit 6 Installation of Pipelines 6.1 General Requirement 6.2 Installation of Pipes 6.3 Installation of Valves 6.4 Fabrication And Installation of Pipe Fittings 7 Welding 7.1 General Requirements 7.2 Welding Material 7.3 Welding 7.4 Inspection and Acceptance of Weld Joint 8 Ditching, Lowering-in and Backfilling 8.1 Ditching 8.2 Lowering-in 8.3 Ditch Backfilling 9 Blowing and Pressure Test 9.1 General Requirements 9.2 Blowing and Washing 9.3 Test on Strength and Tightness 9.4 Drying 10 Corrosion Resistance and Thermal Insulation 10.1 General Requirement 10.2 Corrosion Resistance 10.3 Thermal Insulation 11 Health, Safety and Environment 12 Delivery of the project Appendix A Groove Type of Butt-joint Between Pipes Explanation of Wording in this Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50540-2009, GB/T 50540-2009, GBT 50540-2009, GB50540-2009, GB 50540, GB50540, GB/T50540-2009, GB/T 50540, GB/T50540, GBT50540-2009, GBT 50540, GBT50540