2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 50510-2009
GB/T 50510-2009   Technical code for renewal and renovation of pumping station (English Version)
Standard No.: GB/T 50510-2009 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 9000 words Translation Price(USD):220.0 remind me the price change

Email:

Implemented on:2010-2-1 Delivery: via email in 1 business day

→ → →

,2022-12-1,2010-2-1,14113818188363928312CF2AEAD2F
Standard No.: GB/T 50510-2009
English Name: Technical code for renewal and renovation of pumping station
Chinese Name: 泵站更新改造技术规范
Professional Classification: GB    National Standard
Source Content Issued by: MOC
Issued on: 2009-7-8
Implemented on: 2010-2-1
Status: superseded
Superseded by:GB 50265-2022 Standard for pumping station design
Superseded on:2022-12-1
Target Language: English
File Format: PDF
Word Count: 9000 words
Translation Price(USD): 220.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated to standardize the renewal and renovation works of pumping station, integrate technical requirements for renewal and renovation and ensure the renewal and renovation pumping station operates in a safe, high-efficient and economical manner to maximize the benefit. 1.0.2 This code is applicable to the renewal and renovation of large and medium-sized pumping stations in water resource project. 1.0.3 The pumping stations evaluated into Stage 3 and Stage 4 in the comprehensive safety shall be subjected to the renewal and renovation. 1.0.4 The renewal and renovation of the pumping station shall include the following main items: 1 The electromechanical equipment and metallic structure, including main water pump, main motor and transmission device, auxiliary equipment and facilities, electrical equipment, metallic structure, automatic control and monitoring; 2 Building, including pump house, inlet and outlet structures, junction matching building; 3 Management facilities, including works observation, traffic, communication and production support facility. 1.0.5 The renewal and renovation of pumping station shall comply with the following principles: 1 Ensure safe and reliable operation, maximize the benefit and enhance unit efficiency; 2 Assort with the national economy and social development planning and overall water resources planning at the beneficial area and determine scale, plan and technical and economic indexes of the renewal and renovation in a scientific and reasonable manner; 3 Make the best of former facilities and equipment when the property and safety of the pumping station are not affected; 4 Adopt actively the tested and appraised new technology, new materials, new process and new equipment; 5 Adopt the computer control technology, realize pumping station integrated automation and actively push the informatization according to the scale, position and action of pumping station and its actual operation demands; 6 Correctly handle relation between renewal and renovation of the technology and between reconstruction after backout and eliminating of potential danger and reinforcement. 1.0.6 The pumping station shall be subjected to the renewal and renovation while the management system shall be reformed and the good operation mechanism shall be established. 1.0.7 The renewal and renovation of pumping station shall not only comply with this code but also those in the current relevant ones of the nation. 2 Terms 2.0.1 Renewal and renovation The technical activities carried out for the pumping station, including renewal or technical renovation for the electromechanical equipment due to the change of the basic situations for the former design of the pumping station and the ageing or damage of the engineering facilities and eliminating potential danger of the buildings and reinforcement, engineering matching and reconstruction after backout. 2.0.2 Renewal of equipment Adoption of the new electromechanical equipment due to the ageing, damage, dysfunction, failure to restoration. 2.0.3 Technical renovation The comprehensive renovation activities carried out for the pumping station by the technical means to meet the technical renewal requirements of the facilities and equipment. 2.0.4 Eliminating potential danger and reinforcement Activities to eliminate unsafe factors like ageing and damage of the structures of pumping station. 2.0.5 Engineering matching or equipment matching Perfection of engineering facilities or equipment on the basis of engineering available and according to the established design scheme and target. 2.0.6 Reconstruction after backout The reconstruction of buildings at the pumping station after backout due to the dysfuncation and failure to be restored.
Contents 1 General Provisions 2 Terms 3 Basic Requirement 3.1 General Requirement 3.2 Main Parameters and Indexes 4 Planning and Checking 4.1 Fundamental State Survey 4.2 Design Standards and Design Capacity Checking 4.3 Characteristic Water Level and Characteristic Head Checking 5 Electromechanical Equipment and Metallic Structure 5.1 General Requirement 5.2 Main Pump 5.3 Main Motor and Transmission Device 5.4 Auxiliary Equipment and Facilities 5.5 Metallic Structure 5.6 Electric Equipment 5.7 Automatic Controlling and Monitoring 6 Structures of Pumping Station 6.1 Pump House 6.2 Inlet Structure 6.3 Outlet Structure 6.4 Other Facilities 7 Management Facilities 7.1 General Requirement 7.2 Project Observing Facilities 7.3 Traffic Facilities 7.4 Communication Facilities 7.5 Production Assurance Facilities 7.6 Environment and Greening 8 Installation and Acceptance of Construction 8.1 Project Construction 8.2 Equipment Installation 8.3 Project Acceptance Explanation of Wording in This Code List of Quoted Standards
Code of China
Standard
GB/T 50510-2009  Technical code for renewal and renovation of pumping station (English Version)
Standard No.GB/T 50510-2009
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count9000 words
Price(USD)220.0
Implemented on2010-2-1
Deliveryvia email in 1 business day
Detail of GB/T 50510-2009
Standard No.
GB/T 50510-2009
English Name
Technical code for renewal and renovation of pumping station
Chinese Name
泵站更新改造技术规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOC
Issued on
2009-7-8
Implemented on
2010-2-1
Status
superseded
Superseded by
GB 50265-2022 Standard for pumping station design
Superseded on
2022-12-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
9000 words
Price(USD)
220.0
Keywords
GB/T 50510-2009, GB 50510-2009, GBT 50510-2009, GB/T50510-2009, GB/T 50510, GB/T50510, GB50510-2009, GB 50510, GB50510, GBT50510-2009, GBT 50510, GBT50510
Introduction of GB/T 50510-2009
1 General Provisions 1.0.1 This code is formulated to standardize the renewal and renovation works of pumping station, integrate technical requirements for renewal and renovation and ensure the renewal and renovation pumping station operates in a safe, high-efficient and economical manner to maximize the benefit. 1.0.2 This code is applicable to the renewal and renovation of large and medium-sized pumping stations in water resource project. 1.0.3 The pumping stations evaluated into Stage 3 and Stage 4 in the comprehensive safety shall be subjected to the renewal and renovation. 1.0.4 The renewal and renovation of the pumping station shall include the following main items: 1 The electromechanical equipment and metallic structure, including main water pump, main motor and transmission device, auxiliary equipment and facilities, electrical equipment, metallic structure, automatic control and monitoring; 2 Building, including pump house, inlet and outlet structures, junction matching building; 3 Management facilities, including works observation, traffic, communication and production support facility. 1.0.5 The renewal and renovation of pumping station shall comply with the following principles: 1 Ensure safe and reliable operation, maximize the benefit and enhance unit efficiency; 2 Assort with the national economy and social development planning and overall water resources planning at the beneficial area and determine scale, plan and technical and economic indexes of the renewal and renovation in a scientific and reasonable manner; 3 Make the best of former facilities and equipment when the property and safety of the pumping station are not affected; 4 Adopt actively the tested and appraised new technology, new materials, new process and new equipment; 5 Adopt the computer control technology, realize pumping station integrated automation and actively push the informatization according to the scale, position and action of pumping station and its actual operation demands; 6 Correctly handle relation between renewal and renovation of the technology and between reconstruction after backout and eliminating of potential danger and reinforcement. 1.0.6 The pumping station shall be subjected to the renewal and renovation while the management system shall be reformed and the good operation mechanism shall be established. 1.0.7 The renewal and renovation of pumping station shall not only comply with this code but also those in the current relevant ones of the nation. 2 Terms 2.0.1 Renewal and renovation The technical activities carried out for the pumping station, including renewal or technical renovation for the electromechanical equipment due to the change of the basic situations for the former design of the pumping station and the ageing or damage of the engineering facilities and eliminating potential danger of the buildings and reinforcement, engineering matching and reconstruction after backout. 2.0.2 Renewal of equipment Adoption of the new electromechanical equipment due to the ageing, damage, dysfunction, failure to restoration. 2.0.3 Technical renovation The comprehensive renovation activities carried out for the pumping station by the technical means to meet the technical renewal requirements of the facilities and equipment. 2.0.4 Eliminating potential danger and reinforcement Activities to eliminate unsafe factors like ageing and damage of the structures of pumping station. 2.0.5 Engineering matching or equipment matching Perfection of engineering facilities or equipment on the basis of engineering available and according to the established design scheme and target. 2.0.6 Reconstruction after backout The reconstruction of buildings at the pumping station after backout due to the dysfuncation and failure to be restored.
Contents of GB/T 50510-2009
Contents 1 General Provisions 2 Terms 3 Basic Requirement 3.1 General Requirement 3.2 Main Parameters and Indexes 4 Planning and Checking 4.1 Fundamental State Survey 4.2 Design Standards and Design Capacity Checking 4.3 Characteristic Water Level and Characteristic Head Checking 5 Electromechanical Equipment and Metallic Structure 5.1 General Requirement 5.2 Main Pump 5.3 Main Motor and Transmission Device 5.4 Auxiliary Equipment and Facilities 5.5 Metallic Structure 5.6 Electric Equipment 5.7 Automatic Controlling and Monitoring 6 Structures of Pumping Station 6.1 Pump House 6.2 Inlet Structure 6.3 Outlet Structure 6.4 Other Facilities 7 Management Facilities 7.1 General Requirement 7.2 Project Observing Facilities 7.3 Traffic Facilities 7.4 Communication Facilities 7.5 Production Assurance Facilities 7.6 Environment and Greening 8 Installation and Acceptance of Construction 8.1 Project Construction 8.2 Equipment Installation 8.3 Project Acceptance Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 50510-2009, GB 50510-2009, GBT 50510-2009, GB/T50510-2009, GB/T 50510, GB/T50510, GB50510-2009, GB 50510, GB50510, GBT50510-2009, GBT 50510, GBT50510