2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/MH 5006-2002
MH 5006-2002   technical specifications for construction of cement concrete pavement for airfield area of civil airports (English Version)
Standard No.: MH 5006-2002 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 23000 words Translation Price(USD):690.0 remind me the price change

Email:

Implemented on:2003-3-1 Delivery: via email in 1 business day

→ → →

,2015-12-1,2003-3-1,14113739160910613BF52F12736C5
Standard No.: MH 5006-2002
English Name: technical specifications for construction of cement concrete pavement for airfield area of civil airports
Chinese Name: 民用机场飞行区水泥混凝土道面面层施工技术规范
Professional Classification: MH    Professional Standard - Civil Aviation
Source Content Issued by: CAAC
Issued on: 2002-12-25
Implemented on: 2003-3-1
Status: superseded
Superseded by:MH 5006-2015 Specifications for construction of aerodrome cement concrete pavement
Superseded on:2015-12-1
Target Language: English
File Format: PDF
Word Count: 23000 words
Translation Price(USD): 690.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 The Specifications are prepared with a view to adapting to the demand of civil airport construction, improving the construction technique level of cement concrete pavement in airfield area of civil airport and ensuring the engineering quality. 1.0.2 The Specifications are applicable to the construction of cement concrete pavement in airfield area of newly-built and rebuilt (extended) civil airports (including the civil parts of civil and military airports) in China. As for general aviation airport, the construction of cement concrete pavement may be implemented by reference to the Specifications. Construction of cement concrete pavement foundation is not covered in the Specifications. 1.0.3 For construction of cement concrete pavement, corresponding technical measures shall be taken according to the design document, construction conditions, hydrological geology, engineering geology and meteorological conditions, so as to ensure engineering quality. 1.0.4 The construction of cement concrete pavement shall not only meet the requirements of the Specifications, but also meet those specified in current relevant mandatory standards and specifications. 1.0.5 The construction organization shall set a laboratory on construction site to inspect the construction quality of materials and cement concrete. 2 Terms 2.0.1 Cement concrete pavement The pavement composed of cement concrete surface course, base course and bed course (sometimes unavailable). 2.0.2 Plain cement concrete pavement surface course The cement concrete pavement surface course not reinforced except in the pavement surface course joint and local areas. 2.0.3 Reinforced cement concrete pavement surface course The cement concrete pavement surface course reinforced in the whole cement concrete slab in order to prevent potential crack and gap expansion. 2.0.4 Cement concrete pavement overlays The cement concrete surface course overlaid on original cement concrete pavement so as to enhance its load-bearing capacity or improve the pavement surface property. 3 Construction Preparation 3.1 General Requirements 3.1.1 Prior to the construction of cement concrete pavement surface course, the construction organization shall prepare detailed construction organization design according to design document and construction conditions. The construction organization shall be familiar with construction drawings, information and relevant documents, and learn about the construction site and its ambient conditions. The development organization shall organize the design, supervision and construction organizations to carry out design technique disclosure. The construction organization shall get done with construction technique disclosure with construction personnel concerned. 3.1.2 Water and electricity supply, traffic road, concrete mixing plant, material storage yard, warehouse and etc. shall be properly settled prior to construction. 3.1.3 Test for the material and mix ratio of cement concrete shall be carried out before other preparation so as to determine the specification and quantity of materials accordingly. 3.1.4 Sufficient materials shall be prepared prior to construction. Upon approaching of such materials as cement, sand, stone, additives and steel bars to on site, their variety, quality, specification and quantity shall be respectively inspected.
1 General Provisions 2 Terms 3 Construction Preparation 3.1 General Requirements 3.2 Construction Measurement 4 Materials and Mix Ratio 4.1 Cement 4.2 Fly Ash 4.3 Fine Aggregates 4.4 Coarse Aggregates 4.5 Water 4.6 Additives 4.7 Steel Bars 4.8 Mix Ratio of Cement Concrete 5 Fabrication and Installation of Template 6 Paving of Test Section 7 Mixing and Transportation of Concrete Mixture 8 Paving of Concrete Mixture 9 Template Removal 10 Curing 11 Construction of Cement Concrete Pavement Overlays 12 Joint Construction of Cement Concrete Pavement Surface Course 12.1 Joint Type and Joint-cutting 12.2 Classification and Technical Indexes of Joint Material 12.3 Construction Process of Joint Material 12.4 Standard for Construction Quality Inspection of Joint Material 13 Cement Concrete Pavement Surface Course Construction under Low Temperature 14 Cement Concrete Pavement Surface Course Construction under High Temperature 15 Construction in Windy and Rainy Day 16 Reinforced Concrete Slab and Steel Bar Reinforcement 17 Quality Control Standard for Cement Concrete Pavement Construction 18 Cement Concrete Pavement Surface Course Protection 19 Trench on Cement Concrete Pavement Surface Appendix A Test for Breaking Strength and Split Tensile Strength of Concrete Appendix B Determination for Concrete Pavement Surface Average Texture Depth Attached Table C Testing Method for Joint Filler Explanation of Wording in the Specifications
Code of China
Standard
MH 5006-2002  technical specifications for construction of cement concrete pavement for airfield area of civil airports (English Version)
Standard No.MH 5006-2002
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count23000 words
Price(USD)690.0
Implemented on2003-3-1
Deliveryvia email in 1 business day
Detail of MH 5006-2002
Standard No.
MH 5006-2002
English Name
technical specifications for construction of cement concrete pavement for airfield area of civil airports
Chinese Name
民用机场飞行区水泥混凝土道面面层施工技术规范
Chinese Classification
Professional Classification
MH
ICS Classification
Issued by
CAAC
Issued on
2002-12-25
Implemented on
2003-3-1
Status
superseded
Superseded by
MH 5006-2015 Specifications for construction of aerodrome cement concrete pavement
Superseded on
2015-12-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
23000 words
Price(USD)
690.0
Keywords
MH 5006-2002, MH/T 5006-2002, MHT 5006-2002, MH5006-2002, MH 5006, MH5006, MH/T5006-2002, MH/T 5006, MH/T5006, MHT5006-2002, MHT 5006, MHT5006
Introduction of MH 5006-2002
1 General Provisions 1.0.1 The Specifications are prepared with a view to adapting to the demand of civil airport construction, improving the construction technique level of cement concrete pavement in airfield area of civil airport and ensuring the engineering quality. 1.0.2 The Specifications are applicable to the construction of cement concrete pavement in airfield area of newly-built and rebuilt (extended) civil airports (including the civil parts of civil and military airports) in China. As for general aviation airport, the construction of cement concrete pavement may be implemented by reference to the Specifications. Construction of cement concrete pavement foundation is not covered in the Specifications. 1.0.3 For construction of cement concrete pavement, corresponding technical measures shall be taken according to the design document, construction conditions, hydrological geology, engineering geology and meteorological conditions, so as to ensure engineering quality. 1.0.4 The construction of cement concrete pavement shall not only meet the requirements of the Specifications, but also meet those specified in current relevant mandatory standards and specifications. 1.0.5 The construction organization shall set a laboratory on construction site to inspect the construction quality of materials and cement concrete. 2 Terms 2.0.1 Cement concrete pavement The pavement composed of cement concrete surface course, base course and bed course (sometimes unavailable). 2.0.2 Plain cement concrete pavement surface course The cement concrete pavement surface course not reinforced except in the pavement surface course joint and local areas. 2.0.3 Reinforced cement concrete pavement surface course The cement concrete pavement surface course reinforced in the whole cement concrete slab in order to prevent potential crack and gap expansion. 2.0.4 Cement concrete pavement overlays The cement concrete surface course overlaid on original cement concrete pavement so as to enhance its load-bearing capacity or improve the pavement surface property. 3 Construction Preparation 3.1 General Requirements 3.1.1 Prior to the construction of cement concrete pavement surface course, the construction organization shall prepare detailed construction organization design according to design document and construction conditions. The construction organization shall be familiar with construction drawings, information and relevant documents, and learn about the construction site and its ambient conditions. The development organization shall organize the design, supervision and construction organizations to carry out design technique disclosure. The construction organization shall get done with construction technique disclosure with construction personnel concerned. 3.1.2 Water and electricity supply, traffic road, concrete mixing plant, material storage yard, warehouse and etc. shall be properly settled prior to construction. 3.1.3 Test for the material and mix ratio of cement concrete shall be carried out before other preparation so as to determine the specification and quantity of materials accordingly. 3.1.4 Sufficient materials shall be prepared prior to construction. Upon approaching of such materials as cement, sand, stone, additives and steel bars to on site, their variety, quality, specification and quantity shall be respectively inspected.
Contents of MH 5006-2002
1 General Provisions 2 Terms 3 Construction Preparation 3.1 General Requirements 3.2 Construction Measurement 4 Materials and Mix Ratio 4.1 Cement 4.2 Fly Ash 4.3 Fine Aggregates 4.4 Coarse Aggregates 4.5 Water 4.6 Additives 4.7 Steel Bars 4.8 Mix Ratio of Cement Concrete 5 Fabrication and Installation of Template 6 Paving of Test Section 7 Mixing and Transportation of Concrete Mixture 8 Paving of Concrete Mixture 9 Template Removal 10 Curing 11 Construction of Cement Concrete Pavement Overlays 12 Joint Construction of Cement Concrete Pavement Surface Course 12.1 Joint Type and Joint-cutting 12.2 Classification and Technical Indexes of Joint Material 12.3 Construction Process of Joint Material 12.4 Standard for Construction Quality Inspection of Joint Material 13 Cement Concrete Pavement Surface Course Construction under Low Temperature 14 Cement Concrete Pavement Surface Course Construction under High Temperature 15 Construction in Windy and Rainy Day 16 Reinforced Concrete Slab and Steel Bar Reinforcement 17 Quality Control Standard for Cement Concrete Pavement Construction 18 Cement Concrete Pavement Surface Course Protection 19 Trench on Cement Concrete Pavement Surface Appendix A Test for Breaking Strength and Split Tensile Strength of Concrete Appendix B Determination for Concrete Pavement Surface Average Texture Depth Attached Table C Testing Method for Joint Filler Explanation of Wording in the Specifications
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
MH 5006-2002, MH/T 5006-2002, MHT 5006-2002, MH5006-2002, MH 5006, MH5006, MH/T5006-2002, MH/T 5006, MH/T5006, MHT5006-2002, MHT 5006, MHT5006