Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
DB15/T 3413-2024 |
Code for construction of power supply and distribution facilities in residential communities and commercial buildings |
|
via email in business day |
valid,,2024-5-15 |
|
DB31/T 668.15-2015 |
Energy savings M&V and calculation method for energy conservation technicalretrowit and EPC project-Part 15:Transport &distribution electric cable |
$165.00 |
via email in 1~3 business day |
valid,,2016-1-1 |
|
DB32/T 4878-2024 |
Standard for construction of power supply and distribution facilities in residential districts |
|
via email in business day |
to be valid,,2025-5-1 |
|
DL/T 1010.1-2006 |
High-voltage static VAR compensator Part 1:System design |
$360.00 |
via email in 1~3 business day |
to be superseded,2025-6-25,2007-3-1 |
|
DL/T 1010.2-2006 |
High-voltage static VAR compensator Part 2:Testing of thyristor valves |
$390.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.3-2006 |
High-voltage static VAR compensator Part 3:Control system |
$300.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.4-2006 |
High-voltage static VAR compensator Part 4:Field tests |
$240.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.5-2006 |
High-voltage static VAR compensator Part 5:Closed-loop water cooling system |
$240.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1057-2007 |
Specification of arc suppressing coil apparatus with automatic follow compensation |
$390.00 |
via email in 1~3 business day |
superseded,2023-11-26,2007-12-1 |
|
DL/T 1057-2023 |
Requirements for are suppression reactor complete apparatus with automatic follow compensation |
$405.00 |
via email in 1~5 business day |
valid,,2023-11-26 |
|
DL/T 1080.1-2008 |
Application integration at electric utilities-System interfaces for distribution management-Part1:Interface architecture and general requirements |
$690.00 |
via email in 1~3 business day |
abolished2016-06-01,2016-6-1,2008-11-1 |
|
DL/T 1222-2013 |
Calibration Specification of Impulse Voltage Dividers |
$240.00 |
via email in 1~3 business day |
valid,,2013-8-1 |
|
DL/T 1228-2023 |
Code of operation for power quality monitoring device |
$120.00 |
via email in 1~3 business day |
valid,,2024-4-11 |
|
DL/T 1242-2022 |
Technical guide for live working on UHV DC transmission line |
$195.00 |
via email in 1~3 business day |
valid,,2022-11-13 |
|
DL/T 1274-2013 |
Technical Specification of Series Capacitor Installation for 1000kV System |
$480.00 |
via email in 1~3 business day |
valid,,2014-4-1 |
|
DL/T 1674-2016 |
Technical guide for lightning protection of 35kV and below power distribution network |
$1104.00 |
via email in 1~5 business day |
valid,,2017-5-1 |
|
DL/T 1793-2017 |
Technical guide of supervision for manufacturing equipment of voltage source converter based HVDC transmission |
$651.00 |
via email in 1~8 business day |
valid,,2018-6-1 |
|
DL/T 2119-2020 |
General technical specification for multi rotor UAV flight control system ofoverhead power lines |
|
via email in business day |
valid,,2021-2-1 |
|
DL/T 2144.3-2022 |
The testing specifications for automation system and equipment in substation Part 3: Measurement and control device |
$750.00 |
via email in 1~8 business day |
valid,,2023-5-4 |
|
DL/T 2237-2021 |
Drawing technical guide of wind region distribution map for power grid |
$255.00 |
via email in 1~3 business day |
valid,,2021-7-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10]
Next
End
|