Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
Search |
GB/T 15761-1995 Design and construction rules for nuclear island systems of 2×600MW PWR nuclear power plants
Issued on: 1995-1-2 Price(USD): 1230.0 |
GB/T 28536-2012 Guidelines for formulating the ageing management programme of mechanical equipment in nuclear power plants
Issued on: 2012-06-29 Price(USD): 128.0 |
GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
Issued on: 2022-7-11 Price(USD): 165.0 |
GB/T 41584-2022 Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
Issued on: 2022-07-11 Price(USD): 165.0 |
GB/T 41585-2022 Specification of draw-up commissioning program for pressurized water reactor nuclear power plants
Issued on: 2022-07-11 Price(USD): 375.0 |
GB/T 41587-2022 Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants
Issued on: 2022-07-11 Price(USD): 165.0 |
GB/T 41591-2022 Initial criticality tests for pressurized water reactor of nuclear power plants
Issued on: 2022-07-11 Price(USD): 165.0 |
GB/T 43797-2024 General requirements of operating licenses extension assessment for nuclear power plants
Issued on: 2024-3-15 Price(USD): 165.0 |
GB/T 44080-2024 Management specification of reliability, availability, maintainability and safety (RAMS) for nuclear power plants
Issued on: 2024-05-28 Price(USD): 750.0 |
NB/T 20113-2012 Technical Regulation for Construction of HVAC Installation in PWR Nuclear Power Plant
Issued on: 2012-1-6 Price(USD): 330.0 |
NB/T 20115-2012 Technical Regulation for Construction and Acceptance of Reactor Pressure Vessel Head Installation in PWR Nuclear Power Plants
Issued on: 2012-1-6 Price(USD): 180.0 |
NB/T 20123-2012 Standard for Division of Sub-section and Sub-project in Construction of Nuclear Power Plant
Issued on: 2012-1-6 Price(USD): 390.0 |
NB/T 20129-2023 General technical regulation for installation,test and acceptance of emergency diesel generator of nuclear island in pressurized water reactor nuclear power plants
Issued on: 2023-10-11 Price(USD): |
NB/T 20173-2023 Technical regulations for construction and test of polar crane at PWR reactor building
Issued on: 2023-12-28 Price(USD): |
NB/T 20216-2013 Code for Pipeline Installation of Nuclear Auxiliary System of PWR Nuclear Power Plants
Issued on: 2013-6-8 Price(USD): 1070.0 |
NB/T 20238-2013 Code of Radiation Monitoring System Installation in Nuclear Power Plants
Issued on: 2013-6-8 Price(USD): 184.0 |
NB/T 20238-2023 Nuclear power plant radiation monitoring system installation technical regulation
Issued on: 2023-12-28 Price(USD): |
NB/T 20261-2014 Design criteria for emergency core cooling system of pressurized water reactor nuclear power plants
Issued on: 2014-06-29 Price(USD): 244.0 |
NB/T 20663-2023 Technical Specification for Installation of Ventilation System of PWR Nuclear Power Plant Nuclear Island
Issued on: 2023-5-26 Price(USD): |
NB/T 42008-2013 Reciprocating Internal Combustion Gas Generating Set - Nomenclature and Code of Designations
Issued on: 2013-11-28 Price(USD): 180.0 |
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
Copyright: TransForyou Co., Ltd. 2008-2040 | ||