2025-12-17 216.73.216.99
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTG G10-2006
JTG G10-2006   Supervision Specification for Construction of Highway Engineering (English Version)
Standard No.: JTG G10-2006 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2007-1-1 Delivery: via email in 1 business day

→ → →

,2016-10-1,2007-1-1,14113749892756BDB1CE62B5803C6
Standard No.: JTG G10-2006
English Name: Supervision Specification for Construction of Highway Engineering
Chinese Name: 公路工程施工监理规范
Chinese Classification: P66%P00    
Professional Classification: JT    Professional Standard - Transport
ICS Classification: 93.08 93.08    Road engineering 93.08
Source Content Issued by: MOT
Issued on: 11-Nov-06
Implemented on: 2007-1-1
Status: superseded
Superseded by:JTG G10-2016 Supervision Specifications for Construction of Highway Engineering
Superseded on:2016-10-1
Superseding:JTJ 077-1995 Supervision Specification for Construction of Highway Engineering
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This standard is formulated with a view to implementing highway engineering construction supervision system and making standardization of supervision works. 1.0.2 This standard is applicable to the construction supervision for the highway engineering projects in which engineering supervision system is implemented, and it may apply to maintenance engineering supervision by reference. 1.0.3 Supervision mechanism shall be carry out the works in accordance with the requirements of the following laws, regulations and documents: 1. National and local laws and regulations. 2. National, professional, and local standard, specifications and codes relevant. 3. Supervision contract. 4. Construction contract. 5. The relevant documents at the pre-engineering stage. 6. Engineering design documents and drawings. 7. The relevant letters in the implementation process of the engineering. 1.0.4 A engineering project supervision contract must highlight the responsibilities and authorities of both parties. 1.0.5 The supervision organization shall, based on the requirements of Article 1.0.3 herein, implement supervisory management on engineering quality, safety, environmental protection, expenses and progress in accordance with the responsibilities and authorities agreed in the supervision contract. 1.0.6 The development organization must enforce strictly the national laws and regulations on project construction quality control, safe production, environment protection, etc., and provide legal, standard and ordered supervision working environment. 1.0.7 The supervision for highway engineering construction shall, besides meeting the requirements stipulated in this standard, meet the requirements specified in the relevant current national and professional standards and codes.
Contents 1 General Provisions 2 Terms 3 General Requirements 4 Supervision at Construction Preparation Stage 4.1 Preparation works 4.2 Content of supervision works 5 Supervision on Construction Stage 5.1 Quality supervision 5.2 Supervision on construction safety 5.3 Supervision on construction environment protection 5.4 Supervision on expenses 5.5 Supervision on construction progress 5.6 Management of other contract issues 6 Supervision on Hand-Over Acceptance and Defects Responsibility Period 7 Site Meeting 7.1 Form and Record of Site Meeting 7.2 The First Site Meeting 7.3 Site Regular Meeting 7.4 Special Topic Site Meeting 8 Document and Data Management 8.1 Supervision Document and Data Management 8.2 Supervision Document and Data Content 8.3 Supervision Document and Data Filing 9 Road Electromechanical Engineering Supervision 9.1 Pre-construction Stage Supervision 9.2 Construction Stage Supervision 9.3 Pre-operation Stage Supervision 9.4 Supervision Within the Defects Responsibility Period Annex A Site Supervision Procedure / Position Sheet A.1 Road engineering site supervision procedure / position data sheet A.2 Electromechanical engineering site supervision procedure / position data sheet Annex B Supervision Record B.1 Inspection Tour Record B.2 Site Supervision Record B.3 Supervision diary Annex C Supervision Command Sheet Annex D Intermediate Hand-Over Certificate
Code of China
Standard
JTG G10-2006  Supervision Specification for Construction of Highway Engineering (English Version)
Standard No.JTG G10-2006
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on2007-1-1
Deliveryvia email in 1 business day
Detail of JTG G10-2006
Standard No.
JTG G10-2006
English Name
Supervision Specification for Construction of Highway Engineering
Chinese Name
公路工程施工监理规范
Chinese Classification
P66%P00
Professional Classification
JT
ICS Classification
Issued by
MOT
Issued on
11-Nov-06
Implemented on
2007-1-1
Status
superseded
Superseded by
JTG G10-2016 Supervision Specifications for Construction of Highway Engineering
Superseded on
2016-10-1
Abolished on
Superseding
JTJ 077-1995 Supervision Specification for Construction of Highway Engineering
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
JTG G10-2006, JTG/T G10-2006, JTGT G10-2006, JTGG10-2006, JTG G10, JTGG10, JTG/TG10-2006, JTG/T G10, JTG/TG10, JTGTG10-2006, JTGT G10, JTGTG10
Introduction of JTG G10-2006
1 General Provisions 1.0.1 This standard is formulated with a view to implementing highway engineering construction supervision system and making standardization of supervision works. 1.0.2 This standard is applicable to the construction supervision for the highway engineering projects in which engineering supervision system is implemented, and it may apply to maintenance engineering supervision by reference. 1.0.3 Supervision mechanism shall be carry out the works in accordance with the requirements of the following laws, regulations and documents: 1. National and local laws and regulations. 2. National, professional, and local standard, specifications and codes relevant. 3. Supervision contract. 4. Construction contract. 5. The relevant documents at the pre-engineering stage. 6. Engineering design documents and drawings. 7. The relevant letters in the implementation process of the engineering. 1.0.4 A engineering project supervision contract must highlight the responsibilities and authorities of both parties. 1.0.5 The supervision organization shall, based on the requirements of Article 1.0.3 herein, implement supervisory management on engineering quality, safety, environmental protection, expenses and progress in accordance with the responsibilities and authorities agreed in the supervision contract. 1.0.6 The development organization must enforce strictly the national laws and regulations on project construction quality control, safe production, environment protection, etc., and provide legal, standard and ordered supervision working environment. 1.0.7 The supervision for highway engineering construction shall, besides meeting the requirements stipulated in this standard, meet the requirements specified in the relevant current national and professional standards and codes.
Contents of JTG G10-2006
Contents 1 General Provisions 2 Terms 3 General Requirements 4 Supervision at Construction Preparation Stage 4.1 Preparation works 4.2 Content of supervision works 5 Supervision on Construction Stage 5.1 Quality supervision 5.2 Supervision on construction safety 5.3 Supervision on construction environment protection 5.4 Supervision on expenses 5.5 Supervision on construction progress 5.6 Management of other contract issues 6 Supervision on Hand-Over Acceptance and Defects Responsibility Period 7 Site Meeting 7.1 Form and Record of Site Meeting 7.2 The First Site Meeting 7.3 Site Regular Meeting 7.4 Special Topic Site Meeting 8 Document and Data Management 8.1 Supervision Document and Data Management 8.2 Supervision Document and Data Content 8.3 Supervision Document and Data Filing 9 Road Electromechanical Engineering Supervision 9.1 Pre-construction Stage Supervision 9.2 Construction Stage Supervision 9.3 Pre-operation Stage Supervision 9.4 Supervision Within the Defects Responsibility Period Annex A Site Supervision Procedure / Position Sheet A.1 Road engineering site supervision procedure / position data sheet A.2 Electromechanical engineering site supervision procedure / position data sheet Annex B Supervision Record B.1 Inspection Tour Record B.2 Site Supervision Record B.3 Supervision diary Annex C Supervision Command Sheet Annex D Intermediate Hand-Over Certificate
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTG G10-2006, JTG/T G10-2006, JTGT G10-2006, JTGG10-2006, JTG G10, JTGG10, JTG/TG10-2006, JTG/T G10, JTG/TG10, JTGTG10-2006, JTGT G10, JTGTG10