1 General Provisions
1.0.1 This standard is formulated with a view to implementing highway engineering construction supervision system and making standardization of supervision works.
1.0.2 This standard is applicable to the construction supervision for the highway engineering projects in which engineering supervision system is implemented, and it may apply to maintenance engineering supervision by reference.
1.0.3 Supervision mechanism shall be carry out the works in accordance with the requirements of the following laws, regulations and documents:
1. National and local laws and regulations.
2. National, professional, and local standard, specifications and codes relevant.
3. Supervision contract.
4. Construction contract.
5. The relevant documents at the pre-engineering stage.
6. Engineering design documents and drawings.
7. The relevant letters in the implementation process of the engineering.
1.0.4 A engineering project supervision contract must highlight the responsibilities and authorities of both parties.
1.0.5 The supervision organization shall, based on the requirements of Article 1.0.3 herein, implement supervisory management on engineering quality, safety, environmental protection, expenses and progress in accordance with the responsibilities and authorities agreed in the supervision contract.
1.0.6 The development organization must enforce strictly the national laws and regulations on project construction quality control, safe production, environment protection, etc., and provide legal, standard and ordered supervision working environment.
1.0.7 The supervision for highway engineering construction shall, besides meeting the requirements stipulated in this standard, meet the requirements specified in the relevant current national and professional standards and codes.
Contents
1 General Provisions
2 Terms
3 General Requirements
4 Supervision at Construction Preparation Stage
4.1 Preparation works
4.2 Content of supervision works
5 Supervision on Construction Stage
5.1 Quality supervision
5.2 Supervision on construction safety
5.3 Supervision on construction environment protection
5.4 Supervision on expenses
5.5 Supervision on construction progress
5.6 Management of other contract issues
6 Supervision on Hand-Over Acceptance and Defects Responsibility Period
7 Site Meeting
7.1 Form and Record of Site Meeting
7.2 The First Site Meeting
7.3 Site Regular Meeting
7.4 Special Topic Site Meeting
8 Document and Data Management
8.1 Supervision Document and Data Management
8.2 Supervision Document and Data Content
8.3 Supervision Document and Data Filing
9 Road Electromechanical Engineering Supervision
9.1 Pre-construction Stage Supervision
9.2 Construction Stage Supervision
9.3 Pre-operation Stage Supervision
9.4 Supervision Within the Defects Responsibility Period
Annex A Site Supervision Procedure / Position Sheet
A.1 Road engineering site supervision procedure / position data sheet
A.2 Electromechanical engineering site supervision procedure / position data sheet
Annex B Supervision Record
B.1 Inspection Tour Record
B.2 Site Supervision Record
B.3 Supervision diary
Annex C Supervision Command Sheet
Annex D Intermediate Hand-Over Certificate
Standard
JTG G10-2006 Supervision Specification for Construction of Highway Engineering (English Version)
Standard No.
JTG G10-2006
Status
superseded
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Implemented on
2007-1-1
Delivery
via email in 1 business day
Detail of JTG G10-2006
Standard No.
JTG G10-2006
English Name
Supervision Specification for Construction of Highway Engineering
1 General Provisions
1.0.1 This standard is formulated with a view to implementing highway engineering construction supervision system and making standardization of supervision works.
1.0.2 This standard is applicable to the construction supervision for the highway engineering projects in which engineering supervision system is implemented, and it may apply to maintenance engineering supervision by reference.
1.0.3 Supervision mechanism shall be carry out the works in accordance with the requirements of the following laws, regulations and documents:
1. National and local laws and regulations.
2. National, professional, and local standard, specifications and codes relevant.
3. Supervision contract.
4. Construction contract.
5. The relevant documents at the pre-engineering stage.
6. Engineering design documents and drawings.
7. The relevant letters in the implementation process of the engineering.
1.0.4 A engineering project supervision contract must highlight the responsibilities and authorities of both parties.
1.0.5 The supervision organization shall, based on the requirements of Article 1.0.3 herein, implement supervisory management on engineering quality, safety, environmental protection, expenses and progress in accordance with the responsibilities and authorities agreed in the supervision contract.
1.0.6 The development organization must enforce strictly the national laws and regulations on project construction quality control, safe production, environment protection, etc., and provide legal, standard and ordered supervision working environment.
1.0.7 The supervision for highway engineering construction shall, besides meeting the requirements stipulated in this standard, meet the requirements specified in the relevant current national and professional standards and codes.
Contents of JTG G10-2006
Contents
1 General Provisions
2 Terms
3 General Requirements
4 Supervision at Construction Preparation Stage
4.1 Preparation works
4.2 Content of supervision works
5 Supervision on Construction Stage
5.1 Quality supervision
5.2 Supervision on construction safety
5.3 Supervision on construction environment protection
5.4 Supervision on expenses
5.5 Supervision on construction progress
5.6 Management of other contract issues
6 Supervision on Hand-Over Acceptance and Defects Responsibility Period
7 Site Meeting
7.1 Form and Record of Site Meeting
7.2 The First Site Meeting
7.3 Site Regular Meeting
7.4 Special Topic Site Meeting
8 Document and Data Management
8.1 Supervision Document and Data Management
8.2 Supervision Document and Data Content
8.3 Supervision Document and Data Filing
9 Road Electromechanical Engineering Supervision
9.1 Pre-construction Stage Supervision
9.2 Construction Stage Supervision
9.3 Pre-operation Stage Supervision
9.4 Supervision Within the Defects Responsibility Period
Annex A Site Supervision Procedure / Position Sheet
A.1 Road engineering site supervision procedure / position data sheet
A.2 Electromechanical engineering site supervision procedure / position data sheet
Annex B Supervision Record
B.1 Inspection Tour Record
B.2 Site Supervision Record
B.3 Supervision diary
Annex C Supervision Command Sheet
Annex D Intermediate Hand-Over Certificate