2025-12-22 216.73.216.41
Code of China Chinese Classification Professional Classification ICS Classification Latest Value-added Services

Code of China
Chinese National Standard List: Electric power system equipment installation testing

T/ZTSEE 0040-2025 Technical specification for automatic collaboration debugging of information in dispatching automation system 
  Issued on: 2025-03-25   Translation Price(USD):
T/SHEPEA 004-2024 Supervision specification for installation of 110kV indoor GIS 
  Issued on: 2024-05-01   Translation Price(USD): 420.0
T/SHEPEA 005-2024 Supervision specification for installation of 110kV indoor oil-immersed transformers 
  Issued on: 2024-05-01   Translation Price(USD): 495.0
T/ZJSEE 0021.4-2023 Flexible low-frequency alternating current power transmission - Part 4: Hand-over test code of high-voltage electric equipment 
  Issued on: 2023-11-28   Translation Price(USD): 570.0
DL/T 5864-2023 Code for field acceptance test of converter valves of VSC-HVDC 
  Issued on: 2023-10-11   Translation Price(USD): 225.0
GB/T 8564-2023 Technical specification for installation of hydraulic turbine-generator unit 
  Issued on: 2023-11-27   Translation Price(USD): 1635.0
DL/T 654-2022 Technical guidelines for the life assessment of units in fossil-fuel power plant  
  Issued on: 2022-11-04   Translation Price(USD): 675.0
GB/T 26863-2022 Terminology of monitoring and control system of thermal power station 
  Issued on: 2022-12-30   Translation Price(USD): 2160.0
DL/T 2376-2021 Specification for continuous emissions monitoring of CO2 in the flue gas emitted from thermal power plants 
  Issued on: 2021-12-22   Translation Price(USD): 1100.0
DL/T 2391-2021 Test code for residual current operated protective device 
  Issued on: 2021-12-22   Translation Price(USD): 1300.0
DL/T 2234-2021 Rules for reliability test of cost-control circuit breaker 
  Issued on: 2021-01-07   Translation Price(USD): 400.0
DL/T 2180-2020 General specification for electrical energy measurement device of distribution network transmission loss over the same period 
  Issued on: 2020-10-23   Translation Price(USD): 480.0
DL/T 468-1992 Guide on Type Selection and Application for Power Boiler Fans 
  Issued on:   Translation Price(USD): 315.0
DL/T 5191-2004 Code of construction acceptance on wind power plant project 
  Issued on: 2004-3-9   Translation Price(USD): 840.0
DL/T 469-1992 Fans Performance Testing in Situ for Power Boiler 
  Issued on:   Translation Price(USD): 345.0
DL/T 818-2002 Technical guide for carbide phase analysis of low alloy heat resistant steels 
  Issued on: 2002-4-27   Translation Price(USD): 300.0
NY/T 1137-2006 Erection regulations for small wind turbine generator off-grid system 
  Issued on: 2006-7-10   Translation Price(USD): 160.0
DL/T 467-2004 Performance test for pulverizers and pulverizing systems of power station 
  Issued on: 2004-3-9   Translation Price(USD): 840.0
DL/T 822-2002 Code for Test and Acceptance of Computer Monitoring and Control Sy 
  Issued on: 2002-09-16   Translation Price(USD): 250.0
DL/T 812-2002 Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method 
  Issued on: 2002-4-27   Translation Price(USD): 180.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 Email: coc@codeofchina.com | Send me a messageQQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040