![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
YBJ 236-1991 Key test point for pile foudation
Issued on: Price(USD): 120.0 |
|
YBJ 233-1991 Technical specification for steel pipe pile construction
Issued on: Price(USD): 330.0 |
|
YBJ 235-1991 Technical specification for pile construction of prestressed reinforced concrete pipe
Issued on: Price(USD): 250.0 |
|
YBJ 25-1992 Technical specification for dynamic compaction foundation
Issued on: Price(USD): 270.0 |
|
YBJ 46-1993 Specifications for Rock Test
Issued on: Price(USD): |
|
YBJ 43-1992 Technical Specification for Jet Grouting
Issued on: Price(USD): |
|
YBJ 44-1992 Specification for Grouting
Issued on: Price(USD): |
|
YBJ 230-1991
Issued on: Price(USD): 270.0 |
|
YBJ 225-1991 Technical specification for deep stirring of soft soil foundation
Issued on: 1991-4-25 Price(USD): 390.0 |
|
GBJ 145-1990 Classification of soil
Issued on: 1990-12-30 Price(USD): 280.0 |
|
JGJ 69-1990 Specification for side-pressure test of type TY predrill
Issued on: 1990-5-15 Price(USD): 400.0 |
|
YSJ 401-1989 Construction operation specification for earthworks and explosion engineering
Issued on: 1989-1-1 Price(USD): 300.0 |
|
YSJ 402-1989 Construction operation specification for ground and foundation engineering
Issued on: 1989-1-1 Price(USD): 690.0 |
|
YB/T 9252-1994
Issued on: Price(USD): |
|
T/DGGC 010-2024
Issued on: Price(USD): |
|
T/CI 193-2023 Technical guidelines for testing and observation of frozen ground soil engineering
Issued on: 2023-11-23 Price(USD): |
|
T/CI 202-2023 Technical specification for interface and integration of TBM tunnel engineering smart construction site system
Issued on: 2023-11-30 Price(USD): |
|
T/CSPSTC 98-2022 Construction guidelines for non-blasting excavation of rock chambers in urban deep underground space
Issued on: Price(USD): 495.0 |
|
T/CSPSTC 89-2022 Technical code of practice for structural health monitoring of underground transport hub during operation period
Issued on: 2022-06-09 Price(USD): 225.0 |
|
T/CSRME 028-2022 Guidelines for geotechnical engineering design of underground water-sealed storage caverns
Issued on: 2022-12-18 Price(USD): 810.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||