2025-12-21 216.73.216.41
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
GB/T 33007-2016 Industrial communication networks-Network and system security-Establishing an industrial automation and control system security program 1870.0 via email in 1~5 business day valid,,2017-5-1
GB/T 18268.26-2010 Electrical equipment for measurement,control and laboratory use—EMC requirements—Part 26:Particular requirements—In vitro diagnostic (IVD) medical equipment 120.0 via email in 1~3 business day valid,,2011-5-1
GB/T 20540.2-2006 Digital data communication for measurement and control - Fieldbus for use in industrial systemsType 3: PROFIBUS specification - Part 2: Physical layer specification and service definition 1350.0 via email in 1~3 business day valid,,2007-5-1
GB 30439.7-2014 Safety requirements for industrial automation products - Part 7:Safety requirements for loop regulator 660.0 via email in 1~5 business day valid,,2015-2-1
GB/T 33904-2017 Service protocol for instrument of industrial internet of things 220.0 via email in 1~3 business day valid,,2018-2-1
GB/T 18268.22-2010 Electrical equipment for measurement,control and laboratory use—EMC requirements—Part 22:Particular requirements—Test configurations,operational conditions and performance criteria 140.0 via email in 1~3 business day to be superseded,2027-8-1,2011-5-1
GB/T 33863.1-2017 OPC unified architecture―Part 1:Overview and concepts 310.0 via email in 1~5 business day valid,,2018-2-1
GB/T 26336-2010 Industrial communication networks—Installation of communication networks in industrial premises 1650.0 via email in 1~3 business day valid,,2011-6-1
GB/T 29618.315-2013 Field device tool(FDT) interface specification—Part 315:Communication profile integration—MODBUS 720.0 via email in 1~3 business day valid,,2013-12-15
GB/T 3369.2-2008 Analogue signals for process control systems - Part 2: Direct voltage signals 70.0 via email in 1~3 business day valid,,2009-1-1
JB/T 9233.6-1999 General methods of testing the performance of industrial process measurement and control instruments Ambient temperature effect 60.0 via email in 1~3 business day valid,,2000-1-1
GB/T 21099.1-2007 Function blocks for process control—Part 1:Overview of system aspects 1330.0 via email in 1~5 business day valid,,2007-12-1
JB/T 9233.20-1999 General methods of testing the performance of industrial process measurement and control instruments Input wire effect 60.0 via email in 1~3 business day valid,,2000-1-1
GB/T 33863.3-2017 OPC unified architecture. Part 3: Address space model 1510.0 via email in 1~5 business day valid,,2018-2-1
JB/T 6239.4-2007 General methods for testing the performance of industrial process measurement and control instruments-Part 4:Short-term voltage supply interruptions immunity test 224.0 via email in 1~3 business day abolished2017-05-12 ,,2008-3-1
GB/T 21099.2-2015 Function blocks(FB) for process control—Part 2: Specification of FB concept 750.0 via email in 1~3 business day superseded,2025-6-1,2016-7-1
GB/T 30976.1-2014 Industrial control system security―Part 1:Assessment specification 550.0 via email in 1~5 business day valid,,2015-2-1
JB/T 6239.4-1992 General test methods for industrial automation instruments - Impacts of short-term power interruption 184.0 via email in 1~3 business day superseded,2008-3-1,1993-4-1
GB/T 19769.4-2015 Function block—Part 4: Rules for compliance profiles 160.0 via email in 1~3 business day superseded,2022-11-1,2016-7-1
JB/T 9233.17-1999 General methods of testing the performance of industrial process measurement and control instruments Air consumption 60.0 via email in 1~3 business day abolished2017-05-12 ,,2000-1-1
Previous Page     Next Page



Code of China
Search

GB/T 33007-2016 Industrial communication networks-Network and system security-Establishing an industrial automation and control system security program 
  Issued on: 2016-10-13   Price(USD): 1870.0
GB/T 18268.26-2010 Electrical equipment for measurement,control and laboratory use—EMC requirements—Part 26:Particular requirements—In vitro diagnostic (IVD) medical equipment 
  Issued on: 2011-1-14   Price(USD): 120.0
GB/T 20540.2-2006 Digital data communication for measurement and control - Fieldbus for use in industrial systemsType 3: PROFIBUS specification - Part 2: Physical layer specification and service definition 
  Issued on: 2006-10-16   Price(USD): 1350.0
GB 30439.7-2014 Safety requirements for industrial automation products - Part 7:Safety requirements for loop regulator 
  Issued on: 2014-07-24   Price(USD): 660.0
GB/T 33904-2017 Service protocol for instrument of industrial internet of things 
  Issued on: 2017-07-12   Price(USD): 220.0
GB/T 18268.22-2010 Electrical equipment for measurement,control and laboratory use—EMC requirements—Part 22:Particular requirements—Test configurations,operational conditions and performance criteria 
  Issued on: 2011-1-14   Price(USD): 140.0
GB/T 33863.1-2017 OPC unified architecture―Part 1:Overview and concepts 
  Issued on: 2017-07-12   Price(USD): 310.0
GB/T 26336-2010 Industrial communication networks—Installation of communication networks in industrial premises 
  Issued on: 2011-1-14   Price(USD): 1650.0
GB/T 29618.315-2013 Field device tool(FDT) interface specification—Part 315:Communication profile integration—MODBUS 
  Issued on: 2013-7-19   Price(USD): 720.0
GB/T 3369.2-2008 Analogue signals for process control systems - Part 2: Direct voltage signals 
  Issued on: 2008-6-30   Price(USD): 70.0
JB/T 9233.6-1999 General methods of testing the performance of industrial process measurement and control instruments Ambient temperature effect 
  Issued on: 1999-8-6   Price(USD): 60.0
GB/T 21099.1-2007 Function blocks for process control—Part 1:Overview of system aspects 
  Issued on: 2007-10-11   Price(USD): 1330.0
JB/T 9233.20-1999 General methods of testing the performance of industrial process measurement and control instruments Input wire effect 
  Issued on: 1999-8-6   Price(USD): 60.0
GB/T 33863.3-2017 OPC unified architecture. Part 3: Address space model 
  Issued on: 2017-07-12   Price(USD): 1510.0
JB/T 6239.4-2007 General methods for testing the performance of industrial process measurement and control instruments-Part 4:Short-term voltage supply interruptions immunity test 
  Issued on: 2007-10-8   Price(USD): 224.0
GB/T 21099.2-2015 Function blocks(FB) for process control—Part 2: Specification of FB concept 
  Issued on: 2015-12-10   Price(USD): 750.0
GB/T 30976.1-2014 Industrial control system security―Part 1:Assessment specification 
  Issued on: 2014-07-24   Price(USD): 550.0
JB/T 6239.4-1992 General test methods for industrial automation instruments - Impacts of short-term power interruption 
  Issued on: 1992-05-27   Price(USD): 184.0
GB/T 19769.4-2015 Function block—Part 4: Rules for compliance profiles 
  Issued on: 2015-12-10   Price(USD): 160.0
JB/T 9233.17-1999 General methods of testing the performance of industrial process measurement and control instruments Air consumption 
  Issued on: 1999-8-6   Price(USD): 60.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040