Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
DL/T 1115-2019 |
Guide for chemistry check-up of unit maintenance in fossil fuel power plant |
$543.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL/T 1116-2009 |
Standard test method for efficacy of microbicides used in cooling water system |
$160.00 |
via email in 1~3 business day |
abolished2022-06-22,2022-6-22,2009-12-1 |
|
DL/T 1116-2021 |
Standard test method for efficacy of microbicides used in cooling water system |
$135.00 |
via email in 1~3 business day |
valid,,2022-6-22 |
|
DL/T 1117-2009 |
The specification of welding procedure qualification for Conventional Island of nuclear power station |
$600.00 |
via email in 1~3 business day |
superseded,2019-4-1,2009-12-1 |
|
DL/T 1118-2009 |
The code of welding for conventional island of nuclear power plant |
$390.00 |
via email in 1~3 business day |
superseded,2019-4-1,2009-12-1 |
|
DL/T 1119-2010 |
General technical conditions of measuring instruments for power frequency parameters of transmission lines |
$120.00 |
via email in 1~3 business day |
abolished2025-06-25,2025-6-25,2011-5-1 |
|
DL/T 1119-2024 |
General technical specifications for power frequency parameter tester of transmission line |
|
|
valid,,2025-6-25 |
|
DL/T 1120-2009 |
Specification of autotest and real-time simulation to for hydraulic turbine governor |
$300.00 |
via email in 1~3 business day |
superseded,2018-10-1,2009-12-1 |
|
DL/T 1120-2018 |
Specification of test and real-time simulation device for hydraulic turbine governing system |
$305.00 |
via email in 1~5 business day |
valid,,2018-10-1 |
|
DL/T 1121-2009 |
The engineering criteria of bag filter system for coal-fired power plants |
$210.00 |
via email in 1~3 business day |
superseded,2021-2-1,2009-12-1 |
|
DL/T 1121-2020 |
Technical specifications of bag filter system for coal-fired power plants |
$390.00 |
via email in 1~5 business day |
valid,,2021-2-1 |
|
DL/T 1122-2009 |
Technical guide of insulation coordination selection for overhead transmission line |
$210.00 |
via email in 1~3 business day |
valid,,2009-12-1 |
|
DL/T 1123-2009 |
Configuration for work safety device of fossil fuel power enterprise |
$1110.00 |
via email in 1~3 business day |
valid,,2009-12-1 |
|
DL/T 1124-2009 |
Digital power - line carrier terminals |
$310.00 |
via email in 1~3 business day |
valid,,2009-12-1 |
|
DL/T 1125-2009 |
Insulating clothes for live working on 10KV lines |
$180.00 |
via email in 1~3 business day |
valid,,2009-12-1 |
|
DL/T 1125.1-2009 |
Power station boiler set box small caliber take over the seat of fillet weld non-destructive testing techniques Guide - Part 1: General requirements |
|
via email in 1~3 business day |
,, |
|
DL/T 1126-2009 |
Technical guide for live working on overhead transmission line with multiple circuits on one tower |
$150.00 |
via email in 1~3 business day |
superseded,2018-3-1,2009-12-1 |
|
DL/T 1126-2017 |
Technical guide for live working on overhead transmission line with multiple circuits on one tower |
$190.00 |
via email in 1~3 business day |
valid,,2018-3-1 |
|
DL/T 1127-2010 |
Guide for design and operation of plasma ignition system |
$300.00 |
via email in 1~3 business day |
superseded,2024-4-11,2010-10-1 |
|
DL/T 1127-2023 |
Guide for design and operation of plasma ignition system |
$375.00 |
immediately |
valid,,2024-4-11 |
|
|