Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
HG/T 20637.8-1998 |
Numbering of auxiliary equipment,cables and tubes |
$294.00 |
immediately |
abolished2018-04-01,2018-4-1,1999-1-1 |
|
HG/T 20638-1998 |
Specification for details of engineering design of instrumentation |
$440.00 |
immediately |
superseded,2018-1-1,1999-1-1 |
|
HG/T 20639.1-1998 |
Typical sheets for engineering design of instrumentation |
$940.00 |
immediately |
superseded,2018-4-1,1999-1-1 |
|
HG/T 20639.2-1998 |
Typical design information sheets for engineering design of instrumentation |
$170.00 |
immediately |
superseded,2018-4-1,1999-1-1 |
|
HG/T 20639.3-1998 |
Code and standards list for engineering design of instrumentation |
$579.00 |
immediately |
abolished2018-04-01 ,2018-4-1,1999-1-1 |
|
HG/T 20646.3-1999 |
Design Standard Piping Material for Chemical Plant |
$310.00 |
via email in 1~5 business day |
valid,,2001-8-1 |
|
HG/T 20679-2014 |
Design Code for External Corrosion Protection of Chemical Equipment and Piping |
$620.00 |
immediately |
valid,,2014-11-1 |
|
HG/T 21540-1992 |
Universal Drawing of Reinforced Concrete Pipe Rack with Longitudinal Beam |
$2790.00 |
via email in 1~3 business day |
valid,,1992-1-1 |
|
HG/T 21552-1993 |
Universal Drawing of Truss Type Reinforced Concrete Pipeline Rack |
$3900.00 |
via email in 1~3 business day |
valid,,1992-1-1 |
|
HGJ 230-1989 |
Technical specification for construction of cracking funace in ethylene unit |
$750.00 |
via email in 1~5 business day |
valid,,1989-8-1 |
|
JG/T 202-2007 |
Thermal insulation supports and hangers of polyurethane/vermiculite material for engineering pipe |
$180.00 |
via email in 1~3 business day |
valid,,2007-12-1 |
|
Q/CNPC 59-2001 |
|
$1365.00 |
via email in 1~10 business day |
valid,,2001-2-2 |
|
Q/CNPC 93-2003 |
|
$540.00 |
via email in 1~5 business day |
valid,,2003-7-1 |
|
SH 3514-2001 |
Standard for quality inspection and assessment of petrochemical equipment erection engineerings |
$2895.00 |
via email in 1~3 business day |
abolished2010-01-20 ,,2002-5-1 |
|
SH/T 3506-2007 |
Specification for construction and acceptance for installation work of tubular fired heater |
$520.00 |
via email in 1~5 business day |
abolished2021-01-01,2021-1-1,2007-7-1 |
|
SH/T 3511-2000 |
Technical code for construction of cracking heater of ethylene plant |
$1934.00 |
via email in 1~10 business day |
abolished2007-07-01 ,2007-7-1,2000-10-1 |
|
SH/T 3511-2007 |
Technical code for construction of cracking heater of ethylene plant |
$600.00 |
via email in 1~3 business day |
abolished2021-01-01,2021-1-1,2007-7-1 |
|
SHJ 511-1989 |
Technical specification for construction of cracking furnaces in ethene plants |
$1864.00 |
via email in 1~5 business day |
superseded,2000-10-1,1992-5-20 |
|
SJ/T 31447-1994 |
Requirements of Readiness and Methods of Inspection and Assessment for Acetylene Gas Pipelines |
$184.00 |
via email in 1~3 business day |
abolished2016-06-01,2016-6-1,1994-6-1 |
|
SJ/T 31449-1994 |
Requirements of Readiness and Methods of Inspection and Assessment for Oil Supply Pipelines |
$184.00 |
via email in 1~3 business day |
abolished2016-06-01,2016-6-1,1994-6-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5]
Next
End
|