Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
DB37/T 3568.6-2019 |
Standard for Green Lighting LED Light Part 6:LED Lighting for Plant Growth |
|
via email in business day |
valid,, |
|
DB37/T 3569-2019 |
Minimum allowable values of energy efficiency and energy efficiency grades of LED lamps for green lighting |
|
via email in business day |
valid,,2019-6-29 |
|
DB37/T 4062-2020 |
Specification of assessment for green factory in storage battery industry |
|
via email in business day |
valid,,2020-8-16 |
|
DB37/T 4443-2021 |
Maintenance requirements for contact rail system of urban rail transit |
$255.00 |
via email in 1~3 business day |
valid,,2021-12-17 |
|
DB37/T 730-2007 |
Techinical conditions of solar luminaire |
$180.00 |
via email in 1~3 business day |
valid,,2007-12-1 |
|
DB43/T 672-2014 |
LED lamp for road lighting |
|
via email in business day |
abolished2024-07-31 ,,2014-12-1 |
|
DB43/T 918-2014 |
Nickel-metal hydride barreries used for energy storage |
|
via email in business day |
valid,,2014-9-19 |
|
DB43/T 919-2014 |
Reliability test methods for electric vehicles power battery system |
|
via email in business day |
valid,,2014-9-19 |
|
DB43/T 920-2014 |
Preparation method of sample for determination of mercury,cadmium,lead in secondary battery |
|
via email in business day |
valid,,2014-9-19 |
|
DB45/T 864-2012 |
Technical guide for interconnecting microgrids with distribution systems with voltages nomore than 10kV |
$270.00 |
via email in 1~3 business day |
valid,,2012-12-30 |
|
DB51/T 3099-2023 |
|
|
via email in business day |
valid,,2023-10-1 |
|
DB51/T 3149-2023 |
|
|
via email in business day |
valid,,2024-1-29 |
|
DB52/T 1115-2016 |
General performance requirements of the LED current light bulb |
|
via email in business day |
valid,,2016-10-1 |
|
DB52/T 1117-2016 |
240V Power Frequency Direct Current Power Supple System |
|
via email in business day |
valid,,2016-10-1 |
|
DL 5449-2012 |
Technical code for the design of 20kV electrical installation |
$810.00 |
via email in 1~3 business day |
abolished2025-03-24,2025-3-24,2012-3-1 |
|
DL/T 1000.1-2006 |
Application guide of insulators for overhead lines with a nominal voltage above 1000V part 1:The ceramic or glass insulators for a.c. systems |
$240.00 |
via email in 1~3 business day |
superseded,2019-5-1,2006-10-1 |
|
DL/T 1000.2-2006 |
Application guide of insulators for overhead lines with a nominal voltage above 1000V part 2:The ceramic or glass insulators for d.c. systems |
$240.00 |
via email in 1~3 business day |
abolished2015-12-1,2015-12-1,2006-10-1 |
|
DL/T 1001-2006 |
Technical specification of composite insulating high voltage outdoor-indoor bushing |
$180.00 |
via email in 1~3 business day |
to be superseded,2025-6-25,2006-10-1 |
|
DL/T 1003-2006 |
The measurement of lubricating parameters for thrust bearing of hydro-generator unit |
$180.00 |
via email in 1~3 business day |
superseded,2024-11-24,2007-3-1 |
|
DL/T 1006-2006 |
Patrol system for overhead lines |
$150.00 |
via email in 1~3 business day |
superseded,2024-6-28,2007-3-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
|