![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
SY/T 5602-2008 The criteria on data acquisition about evaluation well in clastic reservoir
Issued on: 2008-06-16 Price(USD): 90.0 |
|
SY/T 6411.1-2008 General requirements for detonating cord in oil and gas well
Issued on: 2008-6-16 Price(USD): 150.0 |
|
SY/T 5579.1-2008 Reservoir description method—Part 1:General provisions
Issued on: 2008-6-16 Price(USD): 450.0 |
|
SY/T 6744-2008 egulation of numerical reservoir simulation
Issued on: 2008-06-16 Price(USD): 225.0 |
|
SY 6350-2008 The safe technique procedures for muti-stage self-controlling safe system of oil-gas well perforation
Issued on: 2008-06-16 Price(USD): 160.0 |
|
SY/T 5579.2-2008 Reservoir description method—Part 2:Fragmental reservoir
Issued on: 2008-6-16 Price(USD): 300.0 |
|
SY/T 6712-2008 Laboratiory measurement method of complex resistivity of core sample
Issued on: 2008-06-16 Price(USD): 210.0 |
|
SY/T 5815-2008 Test method of rock pore volume compressibility
Issued on: 2008-6-16 Price(USD): 150.0 |
|
SY/T 6273-2008 Testing method of electric detonators for oil and gas well
Issued on: 2008-06-16 Price(USD): 150.0 |
|
SY/T 6171-2008 The geological technical specification of production testing for gas reservoir
Issued on: 2008-06-16 Price(USD): 165.0 |
|
SY/T 5692-2008 Specification for testing operation of wireline formation tester
Issued on: 2008-06-16 Price(USD): 165.0 |
|
SY/T 5327-2008 Radioactive species carrier tracer logging
Issued on: 2008-06-16 Price(USD): 135.0 |
|
SY/T 6106-2008 Technical requirement of preparing gas field development plan
Issued on: 2008-6-16 Price(USD): 360.0 |
|
SY/T 5579.4-2008 Reservoir description method—Part 4:Special lithology reservoir
Issued on: 2008-06-16 Price(USD): 345.0 |
|
SY/T 6182-2008 Calibration for logging tool on production well profile
Issued on: 2008-6-16 Price(USD): 420.0 |
|
SY/T 6411.2-2008 Testing method of detonating cord for oil and gas well
Issued on: 2008-06-16 Price(USD): 135.0 |
|
SY/T 5579.3-2008 Reservoir description method—Part 3:Carbonate buried hill reservoir
Issued on: 2008-6-16 Price(USD): 180.0 |
|
SY/T 6110-2008 The method for gas reservoir description
Issued on: 2008-06-16 Price(USD): 360.0 |
|
SY/T 5361-2007 Procedures for the cut-and-thread fishing operation
Issued on: 2007-10-8 Price(USD): 150.0 |
|
SY/T 5345-2007 Test method for relative permeability
Issued on: 2007-10-08 Price(USD): 330.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||