Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
GB/T 12476.10-2010 |
Electrical apparatus for use in the presence of combustible dust―Part 10:Test methods―Method for determining minimum ignition energy of dust/air mixtures |
$225.00 |
via email in 1~3 business day |
superseded,2020-7-1,2011-8-1 |
|
GB/T 12476.3-2017 |
Electrical apparatus for use in the presence of combustible dust—Part 3: Classification of areas where combustible dusts are or may be present |
$370.00 |
immediately |
superseded,2022-5-1,2018-7-1 |
|
GB/T 12476.8-2010 |
Electrical apparatus for use in the presence of combustible dust―Part 8:Test methods―Methods for determining the minimum ignition temperatures of dust |
$375.00 |
via email in 1~5 business day |
superseded,2020-7-1,2011-8-1 |
|
GB/T 12476.9-2010 |
Electrical apparatus for use in the presence of combustible dust―Part 9:Test methods―Method for determining the electrical resistivity of dust in layers |
$105.00 |
via email in 1~3 business day |
superseded,2020-7-1,2011-8-1 |
|
GB/T 18616-2002 |
Corrugated flexible metallic hose assemblies for the protection of electrical cables in explosive atomspheres |
$120.00 |
via email in 1~3 business day |
valid,,2002-7-1 |
|
GB/T 19518.1-2024 |
Explosive atmospheres—Electrical resistance traces heating—Part 1: General and testing requirements |
$705.00 |
via email in 1~5 business day |
valid,,2024-10-1 |
|
GB/T 19518.2-2004 |
Electrical apparatus for explosive gas atmospheres - Electrical resistance trace heating - Part 2:Application guide for design,installation and maintenance |
$370.00 |
via email in 1~3 business day |
superseded,2018-7-1,2004-12-2 |
|
GB/T 19518.2-2017 |
Explosive atmospheres―Electrical resistance traces heating―Part 2:Application guide for design,installation and maintenance |
$610.00 |
via email in 1~5 business day |
valid,,2018-7-1 |
|
GB/T 19854-2018 |
General rules of explosion-proof techniques of industrial trucks for explosive atmospheres |
$610.00 |
via email in 1~5 business day |
valid,,2019-7-1 |
|
GB/T 20936.1-2017 |
Gas detectors for explosive atmospheres—Part 1: Performance requirements of detectors for flammable gases |
$550.00 |
via email in 1~5 business day |
superseded,2023-7-1,2018-7-1 |
|
GB/T 20936.1-2022 |
Gas detectors for explosive atmospheres—Part 1: Performance requirements of detectors for flammable gases |
$555.00 |
via email in 1~5 business day |
valid,,2023-7-1 |
|
GB/T 20936.2-2017 |
Gas detectors for explosive atmospheres―Part 2:Selection,installation,use and maintenance of detectors for flammable gases and oxygen |
$810.00 |
via email in 1~5 business day |
superseded,2024-10-1,2018-7-1 |
|
GB/T 20936.2-2024 |
Gas detectors for explosive atmospheres—Part 2: Selection,installation,use and maintenance of detectors for flammable gases and oxygen |
$1110.00 |
via email in 1~5 business day |
valid,,2024-10-1 |
|
GB/T 20936.3-2009 |
Electrical apparatus for the detection and measurement of flammable gases - Part 3: Performance requirements for group I apparatus indicating a volume fraction up to 100 % methane in |
$120.00 |
via email in 1~3 business day |
superseded,2018-7-1,2009-11-1 |
|
GB/T 20936.3-2017 |
Gas detectors for explosive atmospheres―Part 3:Guidance on functional safety of fixed gas detection systems |
$550.00 |
via email in 1~5 business day |
valid,,2018-7-1 |
|
GB/T 20936.4-2017 |
Gas detectors for explosive atmospheres―Part 4:Performance requirements of open path detectors for flammable gases |
$430.00 |
via email in 1~5 business day |
valid,,2018-7-1 |
|
GB/T 22380.1-2017 |
Explosion protected safety technique of the petrol filling station―Part 1: Explosion protected safety technique requirementsfor fuel filling dispenser |
$550.00 |
via email in 1~5 business day |
valid,,2018-7-1 |
|
GB/T 22380.2-2019 |
Explosion protected safety technique of the petrol filling station -- Part 2: Safety requirements for construction and performance of safe breaks for use on dispensers |
$300.00 |
via email in 1~3 business day |
valid,,2020-7-1 |
|
GB/T 22380.3-2019 |
Explosion protected safety technique of the petrol filling station -- Part 3: Safety requirements for construction and performance of shear valves |
$230.00 |
via email in 1~3 business day |
valid,,2020-7-1 |
|
GB/T 22769-2008 |
Electric bathroom heater (Yuba) |
$210.00 |
via email in 1~3 business day |
superseded,2023-10-1,2009-9-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
|