Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
GB/T 35842-2018 |
Technical requirements for pre-insulated directly buried valve of urban heating |
$310.00 |
immediately |
valid,,2019-1-1 |
|
GB/T 36243-2018 |
Input/output protocols and electronic interfaces for water meters—Requirements |
$630.00 |
via email in 1~5 business day |
valid,,2019-1-1 |
|
GB/T 37621-2019 |
Buried type butterfly valve |
$220.00 |
via email in 1~3 business day |
valid,,2020-5-1 |
|
GB/T 37892-2019 |
Digital integrated full frequency conversion controlled constant pressure water supply equipment |
$370.00 |
via email in 1~5 business day |
valid,,2020-7-1 |
|
GB/T 37894-2019 |
Technical requirements for ozone generator for water and wastewater treatment |
$490.00 |
via email in 1~5 business day |
valid,,2020-7-1 |
|
GB/T 38057-2019 |
Urban water supply pumping station integration adjustment and control system |
$220.00 |
via email in 1~3 business day |
valid,,2020-9-1 |
|
GB/T 38594-2020 |
Water supply devices with superimposing pipe pressure |
$370.00 |
via email in 1~5 business day |
valid,,2021-2-1 |
|
GB/T 44129-2024 |
Standard for urban water supply and water use performance assessment |
$555.00 |
via email in 1~5 business day |
valid,,2025-1-1 |
|
GB/T 50331-2002 |
The standard of water quantity for citys residential use |
$324.00 |
immediately |
valid,,2002-1-1 |
|
GB/T 50349-2005 |
Engineering technical code of water supply polypropylene pipeline for buildings |
$380.00 |
immediately |
abolished2015-05-01,2015-5-1,2005-4-1 |
|
GB/T 778.1-2007 |
Measurement of water flow in fully charged closed conduits—Meters for cold potable water and hot water—Part 1:Specifications |
$420.00 |
via email in 1~5 business day |
superseded,2019-1-1,2008-5-1 |
|
GB/T 778.1-2018 |
Meters for cold potable water and hot water—Part 1:Metrological requirements and technical requirements |
$140.00 |
via email in 1~5 business day |
valid,,2019-1-1 |
|
GB/T 778.2-2007 |
Measurement of water flow in fully charged closed conduits—Meters for cold potable water and hot water—Part 2:Installation requirements |
$130.00 |
via email in 1~3 business day |
superseded,2019-1-1,2008-5-1 |
|
GB/T 778.2-2018 |
Meters for cold potable water and hot water—Part 2:Test methods |
$1230.00 |
via email in 1~10 business day |
valid,,2019-1-1 |
|
GB/T 778.3-2007 |
Measurement of water flow in fully charged closed conduits - Meters for cold potable water and hot water - Part 3: Test methods and equipment |
$810.00 |
via email in 1~3 business day |
superseded,2019-1-1,2008-5-1 |
|
GB/T 778.3-2018 |
Meters for cold potable water and hot water—Part 3:Test report format |
$810.00 |
via email in 1~5 business day |
valid,,2019-1-1 |
|
GB/T 778.4-2018 |
Meters for cold potable water and hot water—Part 4:Non-metrological requirements not covered in GB/T 778.1 |
$400.00 |
via email in 1~5 business day |
valid,,2019-1-1 |
|
GB/T 778.5-2018 |
Meters for cold potable water and hot water—Part 5:Installation requirements |
$220.00 |
via email in 1~3 business day |
valid,,2019-1-1 |
|
HJ/T 411-2007 |
Technical requirement for environmental labeling products Faucets |
$80.00 |
immediately |
valid,,2008-4-1 |
|
JG/T 3009-1993 |
Micro-Computer Controlled VVVF Water-Supplying Equipment |
$160.00 |
via email in 1~3 business day |
superseded,2011-5-1,1994-5-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7]
Next
End
|