![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
DL/Z 790.14-2002 Distribution automation using distribution line carrier systems- Part 1-4: General considerations- Identification of data transmission parameters concerning medium and low-voltage di
Issued on: 2002-9-16 Price(USD): 180.0 |
|
DL/T 544-1994 Rules of management of communication in electric power system
Issued on: 1994-07-14 Price(USD): 220.0 |
|
GB/T 14430-1993 of single - Sideband power line carrier systems
Issued on: 1993-6-5 Price(USD): 370.0 |
|
DL/T 1057-2007 Specification of arc suppressing coil apparatus with automatic follow compensation
Issued on: 2007-7-20 Price(USD): 390.0 |
|
DL/T 860.74-2006 Communication networks and systems in substations Part 7-4:Basic communication structure for substation and feeder equipment-Compatible logical node classes and data classes
Issued on: 2006-9-14 Price(USD): 1620.0 |
|
DL 451-1991 Circular telecontrol protocol
Issued on: 1991-11-4 Price(USD): 180.0 |
|
DL/Z 790.11-2001 Distribution automation using distribution line carrier systems - Part 1: General considerations - Section 1: Distribution automation system architecture
Issued on: 2001-12-26 Price(USD): 270.0 |
|
DL/Z 860.2-2006 Communication networks and systems in substations Part 2: Glossary
Issued on: 2006-5-6 Price(USD): 450.0 |
|
GB/T 31960.7-2015 Technical specification of power energy efficiency monitoring system―Part 7:Technical specification for power energy efficiency monitoring terminal
Issued on: 2015-09-11 Price(USD): 370.0 |
|
DL/Z 790.12-2001 Distribution automation using distribution line carrier systems Part 1: General considerations Section 2: Guide for specification
Issued on: 2001-12-26 Price(USD): 310.0 |
|
GB/T 18657.3-2002 Telecontrol equipment and systems--Part 5:Transmission protocols--Section 3:General structure of application data
Issued on: 2002-02-22 Price(USD): 190.0 |
|
DL/T 634.5101-2002 Telecontrol equipment and systems Part 5-101: Transmission protocols Section 101: Companion standard for basic telecontrol tasks (IEC 60870-5-101: 2002 IDT)
Issued on: 2002-9-16 Price(USD): 1800.0 |
|
DL/Z 634.56-2004 Telecontrol equipment and systems Part 5-6: Test procedures for IEC 60870-5 protocols series
Issued on: 2004-03-09 Price(USD): 2280.0 |
|
GB/T 14429-1993 Telecontrol equipment and systems. Glossary
Issued on: 1993-06-05 Price(USD): 360.0 |
|
GB/T 31994-2015 The technical specifications for smart remote communication and control gateway
Issued on: 2015-09-11 Price(USD): 168.0 |
|
GB/Z 25320.4-2010 Power systems management and associated information exchange—Data and communications security—Part 4:Profiles including MMS
Issued on: 2010-11-10 Price(USD): 190.0 |
|
DL/T 831-2002 Guide on Selection of Furnace Characteristic Parameters for Large Pulverized Coal Fired Power Boilers
Issued on: 2002-09-16 Price(USD): 660.0 |
|
DL/T 1080.1-2008 Application integration at electric utilities-System interfaces for distribution management-Part1:Interface architecture and general requirements
Issued on: 2008-6-4 Price(USD): 690.0 |
|
GB/Z 25841-2010 Guide of protection relaying for 1000kV power system
Issued on: 2010-12-23 Price(USD): 210.0 |
|
DL/T 546-1994 Operation Management Code for Power Line Carrier Communcation
Issued on: 1994-07-14 Price(USD): 130.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||