![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
Q/GDW 12151-2021 Construction technology guideline of transmission line mobile crane for tower erection by using docking device
Issued on: 2021-7-9 Price(USD): 607.0 |
|
Q/GDW 11181.1-2014 Three-dimensional models of power grid Part 1:Model classification and coding
Issued on: 2014-9-1 Price(USD): 607.0 |
|
Q/GDW 11003-2019 Field application guide for ultraviolet detection technology of High-voltage
Issued on: 2020-11-9 Price(USD): 607.0 |
|
Q/GDW 13181.1-2018 Purchasing standard for 35kV~750kV substation integrated power supplysystemPart 1: General technical specification for 35kV~110k Vsubstation integrated power supplysystem
Issued on: 2019-6-28 Price(USD): 607.0 |
|
Q/GDW 11071.4-2021 General equipment technical requirements and interface specification for 35kV~750kV substation Part 4:High-voltage alternating-current circuit-breaker
Issued on: 2021-5-12 Price(USD): 607.0 |
|
Q/GDW 10374.3-2019 Electric energy data acquire system technical specification Part 3: Communication unit
Issued on: 2020-10-30 Price(USD): 607.0 |
|
Q/GDW 12041.1-2020 Standard specification for on-site protection equipment—Part 1: General specification
Issued on: 2020-12-31 Price(USD): 607.0 |
|
Q/GDW 11977-2019 Technical specification for cybersecurity protection of electric vehicle charging facilities
Issued on: 2020-9-28 Price(USD): 607.0 |
|
Q/GDW 12120-2021 Technical specification of unified edge computing framework
Issued on: 2021-6-25 Price(USD): 607.0 |
|
Q/GDW 1140-2014 AC sampling measurement device running test procedures
Issued on: 2015-9-14 Price(USD): 607.0 |
|
Q/GDW 12214-2022 Technology specifications of power system wide-frequency measurement device
Issued on: 2022-1-29 Price(USD): 607.0 |
|
Q/GDW 10154.2-2021 Construction technology guide for tension stringing of overhead transmission lines Part 2:Tension line
Issued on: 2022-1-24 Price(USD): 607.0 |
|
Q/SY XQ 15-2003 Technical Specification of LSAW Line Pipe for West-East Pipeline Project
Issued on: 2003-4-1 Price(USD): 585.0 |
|
Q/SY JS0028-2003 Radiographic Testing of Pipeline Girth Welds for the Second Shan-Jing Pipeline Project
Issued on: 2003-12-30 Price(USD): 585.0 |
|
Q/SH 0195-2008 Technical specifications for conventional geological logging
Issued on: 2008-2-25 Price(USD): 585.0 |
|
Q/SH 0094-2007 Inspection rule of wet steam generator for oil field
Issued on: 2007-4-20 Price(USD): 585.0 |
|
Q/SH 0167-2008 Registration and filing specifications for geological data of oil and gasexploration and development
Issued on: 2008-2-25 Price(USD): 585.0 |
|
Q/SH 0172-2008 Technical specifications for sour gas well test in the northeast of Sichuan
Issued on: 2008-2-25 Price(USD): 585.0 |
|
Q/SH 0241.2-2009 Technical specifications of geological and drilling engineering designs forcasing side tracking-Part 2: Drilling engineering design
Issued on: 2009-2-10 Price(USD): 585.0 |
|
Q/SH 0170-2008 General requirements of high pressure manifolds for drilling and production operation
Issued on: 2008-2-25 Price(USD): 585.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||