Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
GB 14784-2013 |
Safety regulations of belt conveyor |
$80.00 |
immediately |
valid,,2014-7-1 |
|
GB 22340-2008 |
Belt conveyor for coal mine - Safety code |
$150.00 |
via email in 1~3 business day |
valid,,2009-9-1 |
|
GB 40159-2021 |
En-masse conveyors—Safety rules |
$80.00 |
via email in 1~3 business day |
valid,,2022-5-1 |
|
GB/T 14521-2015 |
Terms of continuous handling equipment |
$1050.00 |
via email in 1~5 business day |
valid,,2016-7-1 |
|
GB/T 35017-2018 |
Continuous handling equipments—Classification,symbols,performance and test methods for bulk materials |
$1050.00 |
via email in 1~5 business day |
valid,,2018-12-1 |
|
GB/T 44521-2024 |
Scraper conveyors—Safety specifications |
$210.00 |
via email in 1~3 business day |
valid,,2025-4-1 |
|
GB/T 44523-2024 |
Continuous mechanical handling equipment—General principles for safety signs and hazard pictorials |
$525.00 |
via email in 1~5 business day |
valid,,2025-4-1 |
|
JB/T 8849-2005 |
Mobile equipment for continuous handling of bulk materials Rules for the design of steel structures |
$690.00 |
via email in 1~3 business day |
valid,,2005-9-1 |
|
JB/T 9014.1-1999 |
Continuous handling equipment - Loose bulk material - Terms and classificatiom for performance |
$294.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.2-1999 |
Continuous handling equipment - Loose bulk material - The general rules for test methods for physical performance |
$130.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.3-1999 |
Continuous handling equipment - Loose bulk material - Determination of composition of size and pellet |
$130.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.4-1999 |
Continuous handling equipment - Loose bulk material - Determination of density |
$130.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.5-1999 |
Continuous handling equipment - Loose bulk material - Determination of humidity(moisture content) |
$104.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.6-1999 |
Continuous handling equipment - Loose bulk material - Determination of temperature |
$104.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.7-1999 |
Continuous handling equipment - Loose bulk material - Determination of accumulated angle |
$60.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.8-1999 |
Continuous handling equipment - Loose bulk material - Determination of shearing strength |
$224.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JB/T 9014.9-1999 |
Continuous handling equipment - Loose bulk material - Determination of friction coefficient of material sliding on trough |
$130.00 |
via email in 1~3 business day |
abolished2023-11-03 ,,2000-1-1 |
|
JT/T 1299-2019 |
Technical regulations for combined commissioning of dry bulk terminal handling equipment |
$233.00 |
via email in 1~3 business day |
valid,,2020-3-1 |
|
JT/T 90-2008 |
Calculation of wind load and resistance wind safety requirements for port handling machines |
$120.00 |
via email in 1~3 business day |
superseded,2020-7-1,2008-6-1 |
|
JT/T 93-2008 |
Installation and detection specification of electric device for load-unload machines in port |
$330.00 |
via email in 1~3 business day |
valid,,2008-6-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2]
Next
End
|