Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
SY/T 6394-2009 |
Operation procedures for dry-blending and air converying of oil well cement and additives (materials) |
90.0 |
via email in 1~3 business day |
abolished2018-08-24,,2010-5-1 |
|
SY/T 5716.9-1995 |
|
180.0 |
via email in business day |
abolished,, |
|
SY/T 10040-2016 |
|
|
via email in business day |
valid,,2016-6-1 |
|
SY/T 6611-2005 |
Technical specification for oil quantitative fluorescence analysis |
90.0 |
via email in 1~3 business day |
abolished2011-11-01,2011-11-1,2005-10-1 |
|
SY/T 5902-1993 |
Basic Environment Test Method of Instrument for Petroleum Exploration and Development - Test I: Drop and Topple Test |
60.0 |
via email in 1~3 business day |
abolished2017-05-01,2017-5-1,1994-6-1 |
|
SY/T 6684-2017 |
|
|
via email in business day |
valid,,2017-8-1 |
|
SY 5303-1987 |
|
135.0 |
via email in 1~3 business day |
abolished2005-07-26,,1988-6-1 |
|
SYJ 3-1991 |
|
1500.0 |
via email in 1~10 business day |
superseded,2003-8-1,1992-7-1 |
|
SY/T 0460-2000 |
Specification for application and acceptance of equipment and pipeline installation engineering in natural gas purifying plant |
1270.0 |
via email in 1~10 business day |
abolished2010-12-15,2010-12-15,2000-10-31 |
|
SY/T 5553.5-1992 |
|
1180.0 |
via email in business day |
,, |
|
SY/T 5587.18-1993 |
|
150.0 |
via email in 1~3 business day |
abolished2004-11-01,2004-11-1,1994-3-1 |
|
SY/T 6213-2016 |
Fluoroboric acid for acidizing |
180.0 |
via email in 1~3 business day |
valid,,2016-6-1 |
|
SY/T 5245-1991 |
|
340.0 |
via email in business day |
,, |
|
SY/T 4011-1993 |
Code for construction and acceptance of water injection pump |
|
via email in 1~3 business day |
abolished,, |
|
SY/T 6411.1-2008 |
General requirements for detonating cord in oil and gas well |
150.0 |
via email in 1~3 business day |
superseded,2015-3-1,2008-12-1 |
|
SY/T 5274-2000 |
Resin-coated sand |
90.0 |
via email in 1~3 business day |
abolished2017-05-01,2017-5-1,2001-6-1 |
|
SY/T 6588-2012 |
Calibration Methods for Electric Log Tools |
360.0 |
via email in 1~3 business day |
valid,,2012-12-1 |
|
SY/T 7509-2014 |
|
214.0 |
via email in business day |
valid,,2015-3-1 |
|
SY 6350-2008 |
The safe technique procedures for muti-stage self-controlling safe system of oil-gas well perforation |
160.0 |
via email in 1~3 business day |
valid,,2008-12-1 |
|
SY/T 5249-2019 |
Drilling and production equipments for petroleum and natural gas-Land hydraulic driving vibrator |
225.0 |
via email in 1~3 business day |
valid,,2020-5-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
Next
End
|