Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
GB/T 43672-2024 |
Disposal procedure for permanent plugging of abandoned well in oil and gas field |
$255.00 |
via email in 1~3 business day |
valid,,2024-7-1 |
|
NB/T 10837.1-2021 |
Recommended practice for shale gas factory construction-Part 1:General principles |
$195.00 |
via email in 1~3 business day |
valid,,2022-2-16 |
|
NB/T 10842-2021 |
Test method for in-situ stress direction of shale reservoir―Viscous residual magnetism test combined with wave velocity anisotropy test method |
$225.00 |
via email in 1~3 business day |
valid,,2022-2-16 |
|
NB/T 10846-2021 |
Coiled tubing completion design and operation specification of shale gas wells |
$240.00 |
via email in 1~3 business day |
valid,,2022-2-16 |
|
NB/T 11045.2-2023 |
Shale gas-Specification for drainage gas recovery techniquePart 2: Plunger Lift |
$315.00 |
via email in 1~5 business day |
valid,,2024-4-11 |
|
NB/T 11280-2023 |
Technical specification for fracturing fluid system, fracturing treatment and post-fracturing effective evaluation of shale oil reservoir |
$240.00 |
via email in 1~3 business day |
valid,,2023-11-26 |
|
NB/T 11289-2023 |
Specification for oil production engineering design of medium and high maturity shale oil |
$300.00 |
via email in 1~5 business day |
valid,,2023-11-26 |
|
NB/T 11337-2023 |
|
|
via email in business day |
valid,,2024-4-11 |
|
NB/T 14002.1-2015 |
Shale Gas Reservoir Stimulation Part1:Specification for Fracturing Design |
$354.00 |
via email in 1~3 business day |
superseded,2023-5-4,2016-3-1 |
|
NB/T 14002.2-2017 |
Shale gas reservoir stimulation. Part 2: Technical specification for factory fracturing operation |
|
via email in business day |
abolished2024-04-11,2024-4-11,2017-8-1 |
|
NB/T 14002.2-2023 |
Shale gas一Reservoir reform一Part 2: Operation specification for factory fracturing operation |
$225.00 |
via email in 1~3 business day |
valid,,2024-4-11 |
|
NB/T 14002.3-2015 |
Shale gas reservoir stimulation Part 3:recycling and disposal methods of fracturing flowback water |
$154.00 |
via email in 1~3 business day |
superseded,2023-5-4,2016-3-1 |
|
NB/T 14002.4-2015 |
Shale gas reservoir stimulation Part 4:Recommended practice for the technology of combined pumping fracturing plug and perforation in horizontal well |
$344.00 |
via email in 1~3 business day |
superseded,2023-5-4,2016-3-1 |
|
NB/T 14002.5-2023 |
Shale gas一Reservoir stimulation一Part 5: Operation specifications for milling plug in horizontal well |
$270.00 |
via email in 1~3 business day |
valid,,2024-4-11 |
|
NB/T 14014-2023 |
Shale gas一Operational specification for gas testing of gas well |
$225.00 |
via email in 1~3 business day |
valid,,2024-4-11 |
|
Q/CNPC 25-1999 |
Design Specifications for Compression Fracture of Oil-Water Well |
$120.00 |
via email in 1~3 business day |
valid,,2000-5-1 |
|
SY 5107-1986 |
|
|
via email in business day |
superseded,1996-6-30,1992-7-1 |
|
SY 5108-1986 |
|
|
via email in business day |
superseded,1998-7-1,1992-7-1 |
|
SY 5184-1987 |
|
$220.00 |
via email in 1~3 business day |
superseded,1998-7-1,1988-4-1 |
|
SY 5329-1988 |
|
$420.00 |
via email in 1~5 business day |
abolished1995-07-01,1995-7-1,1988-12-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8]
Next
End
|