2025-7-14 18.97.9.168
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50177-2005
GB 50177-2005   Design code for hydrogen station (English Version)
Standard No.: GB 50177-2005 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 11000 words Price(USD):120.0 remind me the price change

Email:

Implemented on:2005-10-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50177-2005
English Name: Design code for hydrogen station
Chinese Name: 氢气站设计规范
Chinese Classification: P34    Industrial construction engineering
Professional Classification: GB    National Standard
ICS Classification: 91.040.20 91.040.20    Buildings for commerce and industry 91.040.20
Issued by: Ministry of Construction
Issued on: 2005-04-15
Implemented on: 2005-10-1
Status: valid
Superseding:GB 50177-1993 Design code for hydrogen and oxygen station
Language: English
File Format: PDF
Word Count: 11000 words
Price(USD): 120.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to correctly implementing the principles and policies of the national capital construction in the design of hydrogen station and hydrogen supply station, ensuring safety production, energy conservation, environmental protection, meeting production requirements, and achieving advanced technology and economy and rationality. 1.0.2 This code is applicable to the design of newly-built, renovated or extended hydrogen station and hydrogen supply station and of hydrogen pipeline in plant area and shop. 1.0.3 The production fire hazard category of hydrogen station and hydrogen supply station shall be Category "A". The explosion hazard grade of room or area with explosion hazard in hydrogen station and hydrogen supply station shall be divided into Zone 1 or Zone 2, and shall meet the requirements of Appendix A of this code. 1.0.4 The design of hydrogen station, hydrogen supply station and hydrogen pipeline shall not only comply with this code, but also those in the current relevant ones of the nation. 2 Terms 2.0.1 Hydrogen station General term of process facilities, filling facilities, compression and storage facilities, auxiliary facilities and buildings and structures or locations required by hydrogen production through relevant process (for example, pressure swing adsorption by using water electrolysis, natural reformed gas, methanol reformed gas, coke oven gas, water gas, etc. as virgin gas). 2.0.2 Hydrogen supply station General term of buildings and structures, hydrogen gas receivers or locations, supplying hydrogen through bottles or/and pipelines, excluding hydrogen generation equipment. 2.0.3 Hydrogen gas receiver General term of containers with constant pressure and variable volume (wet storage holders) and with variable pressure and constant volume, for storing hydrogen. 2.0.4 Open flame site Fixed site with exposed flame or red heat surface indoors and outdoors. 2.0.5 Sparking site Chimney with spotting fire or such fixed site as outdoor grinding wheel, electric welding and gas welding (cutting). 2.0.6 Filling hydrogen gas station General term of buildings and structures or locations of hydrogen gas compression, filling facilities and necessary auxiliary facilities for hydrogen gas filling. 2.0.7 The installation of hydrogen gas produced by electro1ysising water General term of the combination of such equipment as water electrolyzer, hydrogen (oxygen) gas-liquid separator, hydrogen (oxygen) cooler and hydrogen (oxygen) washer which take water as the raw material. 2.0.8 The system of hydrogen gas produced by electrolysising water General term of process system composed of the installation of hydrogen gas produced by electro1ysising water and such operating units as hydrogen gas pressurizing, storage, purification and filling, by producing hydrogen gas through water electrolysis process. 2.0.9 The installation of hydrogen purification by pressure swing adsorption
1 General Provisions 2 Terms 3 General Layout 4 Process System 5 Equipment Selection 6 Process Layout 7 Building Structure 8 Electrical and Instrument Control 9 Lightning Protection and Earthing 10 Water Supply and Drainage and Fire Fighting 11 Heating and Ventilation 12 Hydrogen Gas Pipeline Appendix A Division of Rating for Explosion Hazard Zone in Hydrogen Station Appendix B Minimum Clear Distance between Overhead Hydrogen Gas Pipeline and Other Overhead Pipeline in Plant Area, Hydrogen Station and Shop Appendix C Minimum Clear Distance between Overhead Hydrogen Gas Pipeline in Plant Area and Buildings and Structures Appendix D Minimum Clear Distance between Hydrogen Gas Pipeline Buried Directly in Plant Area and Other Buried Pipelines Appendix E Minimum Clear Distance between Hydrogen Gas Pipeline Buried Directly in Plant Area and Buildings and Structures Explanation of Wording in This Code
GB 50177-2005 is referred in:
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* DL/T 5094-2012 Code for designing building of fossil fuel power plant
* DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB 16912-2008 Safety Technical Regulation for Oxygen and Relative Gases Produced with Cryogenic Method
* DL/T 5094-2012 Code for designing building of fossil fuel power plant
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation
* GB 16912-2008 Safety Technical Regulation for Oxygen and Relative Gases Produced with Cryogenic Method
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB 4962-2008 Technical safety regulation for gaseous hydrogen use
* DL/T 5068-2006 Technical Code for Designing Chemistry of Thermal Power Plants
* DL/T 5068-2006 Technical Code for Designing Chemistry of Thermal Power Plants
* DL/T 5068-2006 Technical Code for Designing Chemistry of Thermal Power Plants
* DL/T 5068-2006 Technical Code for Designing Chemistry of Thermal Power Plants
* DL/T 5068-2006 Technical Code for Designing Chemistry of Thermal Power Plants
* GB 50030-2013 Oxygen Station Design Specifications
*GB/T 34584-2017 Safety technical regulations for hydrogen refueling station
*GB/T 19774-2005 Specification of water electrolyte system for producing hydrogen
*GB/T 37562-2019 Technical conditions of pressurized water electrolysis system for hydrogen production
*GB/T 29729-2013 Essential requirements for the safety of hydrogen systems
*GB/T 34542.1-2017 Storage and transportation systems for gaseous hydrogen - Part 1: General requirements
*SH/T 3035-2018 Guideline for pipeline sizing in petrochemical industry
*GB/T 40061-2021 Technical specification for liquid hydrogen production system
*GB/T 40060-2021 Technical requirements for storage and transportation of liquid hydrogen
*GB 50229-2019 Standard for design of fire protection for fossil fuel power plants and substations
*GB/T 37563-2019 Safety requirements for pressurized water electrolysis system for hydrogen production
*GB/T 42288-2022 Safety code of electrochemical energy storage station
*GB/T 34539-2017 Safety requirements on hydrogen-oxygen generator
*GB/T 29729-2022 Essential requirements for the safety of hydrogen systems
*T/CGMA 0405-2022 Cryogenic valves for hydrogen — General test method
*GB/T 36558-2023 General technical requirements for electrochemical energy storage system of power system
Code of China
Standard
GB 50177-2005  Design code for hydrogen station (English Version)
Standard No.GB 50177-2005
Statusvalid
LanguageEnglish
File FormatPDF
Word Count11000 words
Price(USD)120.0
Implemented on2005-10-1
Deliveryvia email in 1 business day
Detail of GB 50177-2005
Standard No.
GB 50177-2005
English Name
Design code for hydrogen station
Chinese Name
氢气站设计规范
Chinese Classification
P34
Professional Classification
GB
ICS Classification
Issued by
Ministry of Construction
Issued on
2005-04-15
Implemented on
2005-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB 50177-1993 Design code for hydrogen and oxygen station
Language
English
File Format
PDF
Word Count
11000 words
Price(USD)
120.0
Keywords
GB 50177-2005, GB/T 50177-2005, GBT 50177-2005, GB50177-2005, GB 50177, GB50177, GB/T50177-2005, GB/T 50177, GB/T50177, GBT50177-2005, GBT 50177, GBT50177
Introduction of GB 50177-2005
1 General Provisions 1.0.1 This code is formulated with a view to correctly implementing the principles and policies of the national capital construction in the design of hydrogen station and hydrogen supply station, ensuring safety production, energy conservation, environmental protection, meeting production requirements, and achieving advanced technology and economy and rationality. 1.0.2 This code is applicable to the design of newly-built, renovated or extended hydrogen station and hydrogen supply station and of hydrogen pipeline in plant area and shop. 1.0.3 The production fire hazard category of hydrogen station and hydrogen supply station shall be Category "A". The explosion hazard grade of room or area with explosion hazard in hydrogen station and hydrogen supply station shall be divided into Zone 1 or Zone 2, and shall meet the requirements of Appendix A of this code. 1.0.4 The design of hydrogen station, hydrogen supply station and hydrogen pipeline shall not only comply with this code, but also those in the current relevant ones of the nation. 2 Terms 2.0.1 Hydrogen station General term of process facilities, filling facilities, compression and storage facilities, auxiliary facilities and buildings and structures or locations required by hydrogen production through relevant process (for example, pressure swing adsorption by using water electrolysis, natural reformed gas, methanol reformed gas, coke oven gas, water gas, etc. as virgin gas). 2.0.2 Hydrogen supply station General term of buildings and structures, hydrogen gas receivers or locations, supplying hydrogen through bottles or/and pipelines, excluding hydrogen generation equipment. 2.0.3 Hydrogen gas receiver General term of containers with constant pressure and variable volume (wet storage holders) and with variable pressure and constant volume, for storing hydrogen. 2.0.4 Open flame site Fixed site with exposed flame or red heat surface indoors and outdoors. 2.0.5 Sparking site Chimney with spotting fire or such fixed site as outdoor grinding wheel, electric welding and gas welding (cutting). 2.0.6 Filling hydrogen gas station General term of buildings and structures or locations of hydrogen gas compression, filling facilities and necessary auxiliary facilities for hydrogen gas filling. 2.0.7 The installation of hydrogen gas produced by electro1ysising water General term of the combination of such equipment as water electrolyzer, hydrogen (oxygen) gas-liquid separator, hydrogen (oxygen) cooler and hydrogen (oxygen) washer which take water as the raw material. 2.0.8 The system of hydrogen gas produced by electrolysising water General term of process system composed of the installation of hydrogen gas produced by electro1ysising water and such operating units as hydrogen gas pressurizing, storage, purification and filling, by producing hydrogen gas through water electrolysis process. 2.0.9 The installation of hydrogen purification by pressure swing adsorption
Contents of GB 50177-2005
1 General Provisions 2 Terms 3 General Layout 4 Process System 5 Equipment Selection 6 Process Layout 7 Building Structure 8 Electrical and Instrument Control 9 Lightning Protection and Earthing 10 Water Supply and Drainage and Fire Fighting 11 Heating and Ventilation 12 Hydrogen Gas Pipeline Appendix A Division of Rating for Explosion Hazard Zone in Hydrogen Station Appendix B Minimum Clear Distance between Overhead Hydrogen Gas Pipeline and Other Overhead Pipeline in Plant Area, Hydrogen Station and Shop Appendix C Minimum Clear Distance between Overhead Hydrogen Gas Pipeline in Plant Area and Buildings and Structures Appendix D Minimum Clear Distance between Hydrogen Gas Pipeline Buried Directly in Plant Area and Other Buried Pipelines Appendix E Minimum Clear Distance between Hydrogen Gas Pipeline Buried Directly in Plant Area and Buildings and Structures Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB 50177-2005, GB/T 50177-2005, GBT 50177-2005, GB50177-2005, GB 50177, GB50177, GB/T50177-2005, GB/T 50177, GB/T50177, GBT50177-2005, GBT 50177, GBT50177