GB/T 43686-2024   Guide for post evaluation of electrochemical energy storage station (English Version)
Standard No.: GB/T 43686-2024 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 7500 words Price(USD):225.0 remind me the price change

Email:

Implemented on:2024-10-1 Delivery: via email in 1~3 business day
,,
Standard No.: GB/T 43686-2024
English Name: Guide for post evaluation of electrochemical energy storage station
Chinese Name: 电化学储能电站后评价导则
Chinese Classification: F19    New energy and others
Professional Classification: GB    National Standard
Issued by: SAMR; SAC
Issued on: 2024-3-15
Implemented on: 2024-10-1
Status: valid
Language: English
File Format: PDF
Word Count: 7500 words
Price(USD): 225.0
Delivery: via email in 1~3 business day
Guide for post evaluation of electrochemical energy storage station 1 Scope This document specifies the content requirements for technical evaluation, safety evaluation, environmental impact evaluation, benefit evaluation, and post evaluation conclusion of post evaluation of electrochemical energy storage stations, as well as the requirements for evaluation data and evaluation methods. This document is applicable to the post evaluation of electrochemical energy storage stations which are connected to the grid through a voltage class of above 10kV and use lithium ion batteries, flow batteries, lead-acid/lead-carbon batteries, sodium ion batteries, and electrolyzed water hydrogen batteries/fuel batteries as energy storage carriers. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 27748.1 Stationary fuel cell power systems - Part 1: Safety GB/T 34120 Technical specification for power conversion system of electrochemical energy storage system GB/T 34131 Battery management system for electrical energy storage GB/T 34866 Vanadium flow battery - Safety requirements GB/T 36276 Lithium ion battery for electrical energy storage GB/T 36280 Lead-carbon battery for electrical energy storage GB/T 36547 Technical rule for electrochemical energy storage system connected to power grid GB/T 36548 Test specification for electrochemical energy storage system connected to power grid GB/T 36558 General technical requirements for electrochemical energy storage system in power system GB/T 40090 Code for operation and maintenance of energy storage station GB/T 40594 Technical guide for power grid and source coordination GB/T 42288 Safety code of electrochemical energy storage station GB/T 42315 Code of maintenance for electrochemical energy storage station GB/T 42317 Code for emergency exercises of electrochemical energy storage station GB/T 42318 Guide for environmental impact assessment of electrochemical energy storage station GB/T 42717 Evaluation method of grid-integration characteristics for electrochemical energy storage station GB 50016 Code for fire protection design of buildings GB 50116 Code for design of automatic fire alarm system GB 51048 Design code for electrochemical energy storage station DL/T 2528 Basic terms of electric energy storage 3 Terms and definitions For the purposes of this document, the terms and definitions given in DL/T 2528 and the following apply. 3.1 post evaluation technical and economic activity to systematically and objectively analyze and summarize the goal realization, implementation result, influence, and benefit of the project which has been completed and operated for a period of time 4 General requirements 4.1 The post evaluation of electrochemical energy storage station shall be carried out from the aspects of goal realization, technology and management level, influence, and benefit based on the functional positioning and design goal of the station, and shall adhere to the principles of independence, fairness, and objectivity. 4.2 The post evaluation of electrochemical energy storage station shall be carried out to evaluate the technology, safety, environmental impact and benefit of the station project in construction and operation stages through data review, field investigation, field test, analysis and calculation. 4.3 The basis for post evaluation of electrochemical energy storage station shall include relevant national policies and regulations, technical standards, project approval documents, engineering construction, operation and maintenance data, etc. If the existing data fail to meet the evaluation requirements, field test shall be carried out. 4.4 The post evaluation of electrochemical energy storage station should be carried out 12 months after the station is officially put into operation. 4.5 After the post evaluation of electrochemical energy storage station is completed, an evaluation report shall be issued, and opinions and suggestions shall be put forward on the problems existing in the station.
Contents 1 Scope 2 Normative references 3 Terms and definitions 4 General requirements 5 Evaluation data 6 Evaluation method 7 Technical evaluation 8 Safety evaluation 9 Environmental impact evaluation 10 Benefit evaluation 11 Post evaluation conclusion Annex A (Informative) Post evaluation data of electrochemical energy storage station Annex B (Informative) Evaluation methods for effect of electrochemical energy storage station Annex C (Informative) Framework structure of post evaluation report of electrochemical energy storage station
Referred in GB/T 43686-2024:
*GB/T 27748.1-2017 Stationary fuel cell power systems―Part 1:Safety
*GB/T 34120-2023 Technical requirements for power conversion system of electrochemical energy storage system
*GB/T 34131-2023 Battery management system for electrical energy storage
*GB/T 34866-2017 Vanadium flow battery-Safety requirements
*GB/T 36276-2023 Lithium ion battery for electrical energy storage
*GB/T 36280-2023 Lead carbon battery for electrical energy storage
*GB/T 36547-2024 Technical requirements for connecting electrochemical energy storage station to power grid
*GB/T 36548-2018 Test specification for electrochemical energy storage system connected to power grid
*GB/T 36558-2023 General technical requirements for electrochemical energy storage system of power system
*GB/T 40090-2021 Code for operation and maintenance of energy storage station
*GB/T 40594-2021 Technical guide for power grid and source coordination
*GB/T 42288-2022 Safety code of electrochemical energy storage station
*GB/T 42315-2023 Code of maintenance for electrochemical energy storage station
*GB/T 42317-2023 Code for emergency exercises of electrochemical energy storage station
*GB/T 42318-2023 Guide for environmental impact assessment of electrochemical energy storage station
*GB/T 42717-2023 Evaluation method of grid-integration characteristics for electrochemical energy storage station
*GB 50016-2014(2018)-Provisions Provisions of Code for Fire Protection Design of Buildings
*GB 50116-2013 Code for design of automatic fire alarm system
*GB 51048-2014 Design code for electrochemical energy storage station
*DL/T 2528-2022 Basic terminology of electrical energy storage
Code of China
Standard
GB/T 43686-2024  Guide for post evaluation of electrochemical energy storage station (English Version)
Standard No.GB/T 43686-2024
Statusvalid
LanguageEnglish
File FormatPDF
Word Count7500 words
Price(USD)225.0
Implemented on2024-10-1
Deliveryvia email in 1~3 business day
Detail of GB/T 43686-2024
Standard No.
GB/T 43686-2024
English Name
Guide for post evaluation of electrochemical energy storage station
Chinese Name
电化学储能电站后评价导则
Chinese Classification
F19
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2024-3-15
Implemented on
2024-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
7500 words
Price(USD)
225.0
Keywords
GB/T 43686-2024, GB 43686-2024, GBT 43686-2024, GB/T43686-2024, GB/T 43686, GB/T43686, GB43686-2024, GB 43686, GB43686, GBT43686-2024, GBT 43686, GBT43686
Introduction of GB/T 43686-2024
Guide for post evaluation of electrochemical energy storage station 1 Scope This document specifies the content requirements for technical evaluation, safety evaluation, environmental impact evaluation, benefit evaluation, and post evaluation conclusion of post evaluation of electrochemical energy storage stations, as well as the requirements for evaluation data and evaluation methods. This document is applicable to the post evaluation of electrochemical energy storage stations which are connected to the grid through a voltage class of above 10kV and use lithium ion batteries, flow batteries, lead-acid/lead-carbon batteries, sodium ion batteries, and electrolyzed water hydrogen batteries/fuel batteries as energy storage carriers. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 27748.1 Stationary fuel cell power systems - Part 1: Safety GB/T 34120 Technical specification for power conversion system of electrochemical energy storage system GB/T 34131 Battery management system for electrical energy storage GB/T 34866 Vanadium flow battery - Safety requirements GB/T 36276 Lithium ion battery for electrical energy storage GB/T 36280 Lead-carbon battery for electrical energy storage GB/T 36547 Technical rule for electrochemical energy storage system connected to power grid GB/T 36548 Test specification for electrochemical energy storage system connected to power grid GB/T 36558 General technical requirements for electrochemical energy storage system in power system GB/T 40090 Code for operation and maintenance of energy storage station GB/T 40594 Technical guide for power grid and source coordination GB/T 42288 Safety code of electrochemical energy storage station GB/T 42315 Code of maintenance for electrochemical energy storage station GB/T 42317 Code for emergency exercises of electrochemical energy storage station GB/T 42318 Guide for environmental impact assessment of electrochemical energy storage station GB/T 42717 Evaluation method of grid-integration characteristics for electrochemical energy storage station GB 50016 Code for fire protection design of buildings GB 50116 Code for design of automatic fire alarm system GB 51048 Design code for electrochemical energy storage station DL/T 2528 Basic terms of electric energy storage 3 Terms and definitions For the purposes of this document, the terms and definitions given in DL/T 2528 and the following apply. 3.1 post evaluation technical and economic activity to systematically and objectively analyze and summarize the goal realization, implementation result, influence, and benefit of the project which has been completed and operated for a period of time 4 General requirements 4.1 The post evaluation of electrochemical energy storage station shall be carried out from the aspects of goal realization, technology and management level, influence, and benefit based on the functional positioning and design goal of the station, and shall adhere to the principles of independence, fairness, and objectivity. 4.2 The post evaluation of electrochemical energy storage station shall be carried out to evaluate the technology, safety, environmental impact and benefit of the station project in construction and operation stages through data review, field investigation, field test, analysis and calculation. 4.3 The basis for post evaluation of electrochemical energy storage station shall include relevant national policies and regulations, technical standards, project approval documents, engineering construction, operation and maintenance data, etc. If the existing data fail to meet the evaluation requirements, field test shall be carried out. 4.4 The post evaluation of electrochemical energy storage station should be carried out 12 months after the station is officially put into operation. 4.5 After the post evaluation of electrochemical energy storage station is completed, an evaluation report shall be issued, and opinions and suggestions shall be put forward on the problems existing in the station.
Contents of GB/T 43686-2024
Contents 1 Scope 2 Normative references 3 Terms and definitions 4 General requirements 5 Evaluation data 6 Evaluation method 7 Technical evaluation 8 Safety evaluation 9 Environmental impact evaluation 10 Benefit evaluation 11 Post evaluation conclusion Annex A (Informative) Post evaluation data of electrochemical energy storage station Annex B (Informative) Evaluation methods for effect of electrochemical energy storage station Annex C (Informative) Framework structure of post evaluation report of electrochemical energy storage station
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 43686-2024, GB 43686-2024, GBT 43686-2024, GB/T43686-2024, GB/T 43686, GB/T43686, GB43686-2024, GB 43686, GB43686, GBT43686-2024, GBT 43686, GBT43686