1.0.1 This standard is formulated with a view to unifying the technical requirements for in -situ pore water pressure measurement, advancing the measuring techniques and ensuring measuring quality.
1.0.2 This standard is applicable to in-situ measurement of pore pressure in saturated soil layer.
1.0.3 The selection and burying of in-situ pore pressure measuring instruments, as well as the measuring methods shall have reliable quality, easy operation, and shall be economic and effective.
1.0.4 In addition to provisions in this standard, the in-situ pore water pressure measuring shall also comply with relevant regulations in current national standards.
1 General Provision 2 Instruments and Equipments 3 Laying and Measuring 3.1 Preparation work 3.2 The laying of the measuring pores and the measuring points 3.3 The burying of the pore pressure gauge 3.4 The measuring work 4 Pore water pressure measurements in different projects 4.1 Controlling the loading speed in the preloading projects 4.2 Controlling the velocity in pile-sinking projects 4.3 Controlling the intermittence time in heavy tamping and strengthening 4.5 Analyzing the slope stability 5 Arranging the measuring results and preparing the reports Additional Explanation
Standard
CECS 55-1993 Specifications for pore pressure measurement (English Version)
1.0.1 This standard is formulated with a view to unifying the technical requirements for in -situ pore water pressure measurement, advancing the measuring techniques and ensuring measuring quality.
1.0.2 This standard is applicable to in-situ measurement of pore pressure in saturated soil layer.
1.0.3 The selection and burying of in-situ pore pressure measuring instruments, as well as the measuring methods shall have reliable quality, easy operation, and shall be economic and effective.
1.0.4 In addition to provisions in this standard, the in-situ pore water pressure measuring shall also comply with relevant regulations in current national standards.
Contents of CECS 55-1993
1 General Provision
2 Instruments and Equipments
3 Laying and Measuring
3.1 Preparation work
3.2 The laying of the measuring pores and the measuring points
3.3 The burying of the pore pressure gauge
3.4 The measuring work
4 Pore water pressure measurements in different projects
4.1 Controlling the loading speed in the preloading projects
4.2 Controlling the velocity in pile-sinking projects
4.3 Controlling the intermittence time in heavy tamping and strengthening
4.5 Analyzing the slope stability
5 Arranging the measuring results and preparing the reports
Additional Explanation