2025-12-16 216.73.216.89
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5142-2002
DL/T 5142-2002   Code for Designing Ash Handling System of Power Plant (English Version)
Standard No.: DL/T 5142-2002 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 19000 words Translation Price(USD):470.0 remind me the price change

Email:

Implemented on:2002-9-1 Delivery: via email in 1 business day

→ → →

,2012-12-1,2002-9-1,14113738528036FF7DF36D07A1599
Standard No.: DL/T 5142-2002
English Name: Code for Designing Ash Handling System of Power Plant
Chinese Name: 火力发电厂除灰设计规程
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: SETC
Implemented on: 2002-9-1
Status: superseded
Superseded by:DL/T 5142-2012 Code for designing ash handling system of power plant
Superseded on:2012-12-1
Superseding:SDGJ 11-1990 火力发电厂除灰设计技术规定
Target Language: English
File Format: PDF
Word Count: 19000 words
Translation Price(USD): 470.0
Delivery: via email in 1 business day
1. Scope This Code specifies that the design of ash handling system of large-scale thermal power plant shall abide by the principle and construction standard. This Code is applicable to the ash handling design of condensing power plant in output of 125MW or above of the turbo generator unit, and also applicable to the ash handling design of 50MW or above heating unit thermal plant and power station with clean coal power generation technology. This Code is applicable to the ash handling design of newly-built or extended power plant, while the ash handling design of the reconstructed project may refer to this code. 2. Normative References The following standards contain provisions which, through reference in this text, constitute provisions of this Standard. For dated reference, subsequent amendments (excluding content of corrigenda) to, or revisions of, any of these publications do not apply. However, Parties to agreements based on this Code are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest edition of the normative document referred to applies.
Referred in DL/T 5142-2002:
*GBJ29-
*GB 16297-1996 Comprehensive emission standard of air pollutants
*DL 5000-2000 Technical code for designing fossil fuel power plants
*DL/T 5032-2018 Code for design of general layout and transportation for power plant
*DL 5053-2012 Code for the design of occupational safety in fossil-fired power plant
*DL/T 5054-2016 Code for design of steam water piping in thermal power plant
Code of China
Standard
DL/T 5142-2002  Code for Designing Ash Handling System of Power Plant (English Version)
Standard No.DL/T 5142-2002
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count19000 words
Price(USD)470.0
Implemented on2002-9-1
Deliveryvia email in 1 business day
Detail of DL/T 5142-2002
Standard No.
DL/T 5142-2002
English Name
Code for Designing Ash Handling System of Power Plant
Chinese Name
火力发电厂除灰设计规程
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
SETC
Issued on
Implemented on
2002-9-1
Status
superseded
Superseded by
DL/T 5142-2012 Code for designing ash handling system of power plant
Superseded on
2012-12-1
Abolished on
Superseding
SDGJ 11-1990 火力发电厂除灰设计技术规定
Language
English
File Format
PDF
Word Count
19000 words
Price(USD)
470.0
Keywords
DL/T 5142-2002, DL 5142-2002, DLT 5142-2002, DL/T5142-2002, DL/T 5142, DL/T5142, DL5142-2002, DL 5142, DL5142, DLT5142-2002, DLT 5142, DLT5142
Introduction of DL/T 5142-2002
1. Scope This Code specifies that the design of ash handling system of large-scale thermal power plant shall abide by the principle and construction standard. This Code is applicable to the ash handling design of condensing power plant in output of 125MW or above of the turbo generator unit, and also applicable to the ash handling design of 50MW or above heating unit thermal plant and power station with clean coal power generation technology. This Code is applicable to the ash handling design of newly-built or extended power plant, while the ash handling design of the reconstructed project may refer to this code. 2. Normative References The following standards contain provisions which, through reference in this text, constitute provisions of this Standard. For dated reference, subsequent amendments (excluding content of corrigenda) to, or revisions of, any of these publications do not apply. However, Parties to agreements based on this Code are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest edition of the normative document referred to applies.
Contents of DL/T 5142-2002
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5142-2002, DL 5142-2002, DLT 5142-2002, DL/T5142-2002, DL/T 5142, DL/T5142, DL5142-2002, DL 5142, DL5142, DLT5142-2002, DLT 5142, DLT5142