2025-12-16 216.73.216.89
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5229-2016
DL/T 5229-2016   Provisions on the preparation of the completion drawings of electric power engineering (English Version)
Standard No.: DL/T 5229-2016 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 28500 words Translation Price(USD):850.0 remind me the price change

Email:

Implemented on:2016-6-1 Delivery: via email in 1~5 business day

→ → →

,,2016-6-1,1962923AF972E7A71457795668764
Standard No.: DL/T 5229-2016
English Name: Provisions on the preparation of the completion drawings of electric power engineering
Chinese Name: 电力工程竣工图文件编制规定
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: China Energy Aminidstration
Issued on: 2016-01-07
Implemented on: 2016-6-1
Status: valid
Superseding:DL/T 5229-2005 Stipulations for Drafting As-Built Drawing Documents of Electric Power Projects
Target Language: English
File Format: PDF
Word Count: 28500 words
Translation Price(USD): 850.0
Delivery: via email in 1~5 business day
Contents Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Drafting Requirements for As-Built Drawing 5 Scope and Content Depth of As-Built Drawing 6 Examination and Check for As-Built Drawing 7 Printing, Delivering and Archiving of As-Built Drawing Appendix A (Normative) As-Built Drawing Seal Appendix B (Informative) Contents of As-Built Drawing
Code of China
Standard
DL/T 5229-2016  Provisions on the preparation of the completion drawings of electric power engineering (English Version)
Standard No.DL/T 5229-2016
Statusvalid
LanguageEnglish
File FormatPDF
Word Count28500 words
Price(USD)850.0
Implemented on2016-6-1
Deliveryvia email in 1~5 business day
Detail of DL/T 5229-2016
Standard No.
DL/T 5229-2016
English Name
Provisions on the preparation of the completion drawings of electric power engineering
Chinese Name
电力工程竣工图文件编制规定
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
China Energy Aminidstration
Issued on
2016-01-07
Implemented on
2016-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
DL/T 5229-2005 Stipulations for Drafting As-Built Drawing Documents of Electric Power Projects
Language
English
File Format
PDF
Word Count
28500 words
Price(USD)
850.0
Keywords
DL/T 5229-2016, DL 5229-2016, DLT 5229-2016, DL/T5229-2016, DL/T 5229, DL/T5229, DL5229-2016, DL 5229, DL5229, DLT5229-2016, DLT 5229, DLT5229
Introduction of DL/T 5229-2016
Contents of DL/T 5229-2016
Contents Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Drafting Requirements for As-Built Drawing 5 Scope and Content Depth of As-Built Drawing 6 Examination and Check for As-Built Drawing 7 Printing, Delivering and Archiving of As-Built Drawing Appendix A (Normative) As-Built Drawing Seal Appendix B (Informative) Contents of As-Built Drawing
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5229-2016, DL 5229-2016, DLT 5229-2016, DL/T5229-2016, DL/T 5229, DL/T5229, DL5229-2016, DL 5229, DL5229, DLT5229-2016, DLT 5229, DLT5229