1.0.1 This code is formulated with a view to uniform the acceptance of automation instrumentation (hereinafter referred to as "instrumentation") engineering and to strengthen the engineering quality management.
1.0.2 This Code is applicable to the construction quality acceptance of instrumentation engineering, both industrial and civil.
This Code is not applicable to the construction quality acceptance of the instrumentation engineering in the locations which manufacture, store and use explosive materials, as well as vehicles, mine shafts and meteorologic purposes.
1.0.3 This Code shall be used together with the current national standard, Code for Construction and Acceptance of Automation Instrumentation Engineering.
1.0.4 For the acceptance of instrumentation engineering construction quality, not only the requirements stipulated in this Code but also those in the current relevant ones of the nation shall be complied with.
1. General provisions
2. Terminology
3 Fundamental rules
3.1 Quality management
3.2 Engineering division
3.3 Amount of inspection
3.4 Acceptance method and eligible quality evaluation
4 Installation
4.1 General provisions
4.2 Temperature tap
4.3 Pressure tap
4.4 Flow tap
4.5 Material level tap
4.6 Analysis tap
5 Instrumentation installation
5.1 General provisions
5.2 Instrument board, cabinet and box
5.3 Temperature inspection instrumentation
5.4 Pressure detection instrumentation
5.5 Flow inspection instrumentation
5.6 Material level inspection instrumentation
5.7 Mechanical quantity inspection instrumentation
5.8 Composition analysis and physical property inspection instrumentation
5.9 Other inspection instrumentations
5.10 Actuator
5.11 Control instrumentation and comprehensive control system
5.12 Instrumentation power equipment
6 Instrumentation circuit installation
6.1 General provisions
6.2 Fabrication and installation of the bracket
6.3 Installation of cable channel
6.4 Installation of protection pipe
6.5 Laying of cable and wire
6.6 Instrumentation circuit wiring
7 Instrumentation pipeline installation
7.1 General provisions
7.2 Measurement pipeline
7.3 Pneumatic signal pipeline
7.4 Gas source pipeline
7.5 Hydraulic pipeline
7.6 The instrumentation pipeline in the instrument board, cabinet and box
7.7 Pipeline testing
8. Degreasing
8.1 General provisions
8.2 Degreasing method
8.3 Examination of degreasing piece
9 Electric explosion protection/grounding
9.1 Construction of instrumentation equipment in the explosive and fire-dangerous environment
9.2 Grounding
10 Protection
10.1 Insulation and blow wash
10.2 Anticorrosion and thermal insulation
10.3 Heat tracing
11 Instrumentation testing
11.1 General provisions
11.2 Calibration and testing of single-unit instrumentation
11.3 Testing of instrumentation power equipment
11.4 Testing of comprehensive control system
11.5 Loop test and system test
Wording Explanations
Standard
GB 50131-2007 Code for Constructional Quality Acceptance of Automation Instrument (English Version)
Standard No.
GB 50131-2007
Status
superseded
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
370.0
Implemented on
2008-5-1
Delivery
via email in 1 business day
Detail of GB 50131-2007
Standard No.
GB 50131-2007
English Name
Code for Constructional Quality Acceptance of Automation Instrument
1.0.1 This code is formulated with a view to uniform the acceptance of automation instrumentation (hereinafter referred to as "instrumentation") engineering and to strengthen the engineering quality management.
1.0.2 This Code is applicable to the construction quality acceptance of instrumentation engineering, both industrial and civil.
This Code is not applicable to the construction quality acceptance of the instrumentation engineering in the locations which manufacture, store and use explosive materials, as well as vehicles, mine shafts and meteorologic purposes.
1.0.3 This Code shall be used together with the current national standard, Code for Construction and Acceptance of Automation Instrumentation Engineering.
1.0.4 For the acceptance of instrumentation engineering construction quality, not only the requirements stipulated in this Code but also those in the current relevant ones of the nation shall be complied with.
Contents of GB 50131-2007
1. General provisions
2. Terminology
3 Fundamental rules
3.1 Quality management
3.2 Engineering division
3.3 Amount of inspection
3.4 Acceptance method and eligible quality evaluation
4 Installation
4.1 General provisions
4.2 Temperature tap
4.3 Pressure tap
4.4 Flow tap
4.5 Material level tap
4.6 Analysis tap
5 Instrumentation installation
5.1 General provisions
5.2 Instrument board, cabinet and box
5.3 Temperature inspection instrumentation
5.4 Pressure detection instrumentation
5.5 Flow inspection instrumentation
5.6 Material level inspection instrumentation
5.7 Mechanical quantity inspection instrumentation
5.8 Composition analysis and physical property inspection instrumentation
5.9 Other inspection instrumentations
5.10 Actuator
5.11 Control instrumentation and comprehensive control system
5.12 Instrumentation power equipment
6 Instrumentation circuit installation
6.1 General provisions
6.2 Fabrication and installation of the bracket
6.3 Installation of cable channel
6.4 Installation of protection pipe
6.5 Laying of cable and wire
6.6 Instrumentation circuit wiring
7 Instrumentation pipeline installation
7.1 General provisions
7.2 Measurement pipeline
7.3 Pneumatic signal pipeline
7.4 Gas source pipeline
7.5 Hydraulic pipeline
7.6 The instrumentation pipeline in the instrument board, cabinet and box
7.7 Pipeline testing
8. Degreasing
8.1 General provisions
8.2 Degreasing method
8.3 Examination of degreasing piece
9 Electric explosion protection/grounding
9.1 Construction of instrumentation equipment in the explosive and fire-dangerous environment
9.2 Grounding
10 Protection
10.1 Insulation and blow wash
10.2 Anticorrosion and thermal insulation
10.3 Heat tracing
11 Instrumentation testing
11.1 General provisions
11.2 Calibration and testing of single-unit instrumentation
11.3 Testing of instrumentation power equipment
11.4 Testing of comprehensive control system
11.5 Loop test and system test
Wording Explanations