2025-5-20 18.97.9.174
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50312-2007
GB 50312-2007   Code for Engineering Acceptance of Generic Cabling System (English Version)
Standard No.: GB 50312-2007 Status:abolished remind me the status change

Email:

Language:English File Format:PDF
Word Count: 30500 words Price(USD):100.0 remind me the price change

Email:

Implemented on:2007-10-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50312-2007
English Name: Code for Engineering Acceptance of Generic Cabling System
Chinese Name: 综合布线系统工程验收规范
Chinese Classification: P33    Residential and public building engineering
Professional Classification: GB    National Standard
Issued by: Ministry of Construction
Issued on: 2007-04-06
Implemented on: 2007-10-1
Status: abolished
Superseded by:GB/T 50312-2016 Code for engineering acceptance of generic cabling system
Superseded on:2017-4-1
Abolished on:2017-04-01
Superseding:GB/T 50312-2000 Code for engineering acceptance of generic cabling system for building and campus
Language: English
File Format: PDF
Word Count: 30500 words
Price(USD): 100.0
Delivery: via email in 1 business day
1. General Provisions 1.0.1 This Code is formulated with a view to uniform the technical requirements on installation quality inspection, routine inspection and final acceptance of the generic cabling system for buildings and building complexes. 1.0.2 This Code is applicable to the acceptance inspections of the generic cabling systems in the construction, extension and renovation of buildings and building complexes. 1.0.3 In the implementation of the generic cabling system, the requirements on the engineering acceptance stated in the engineering documents and contract documents shall not be lower than the provisions of this code. 1.0.4 In the construction procedure, the construction organization must comply with the relevant provisions of this code on engineering acceptance. The development organization shall, through on-site representative or supervisors, strengthen the construction quality inspection and timely organize inspection and acceptance for the concealed works. 1.0.5 The generic cabling system shall comply with the design requirements. Self-check testing and final acceptance testing shall be carried out prior to the engineering acceptance. 1.0.6 For the engineering acceptance of generic cabling system, not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with. 2. Environment inspection 2.0.1 The inspection of the working area, telecommunication room and equipment room shall include the following contents: 1 The civil works of the working area, telecommunication room and equipment room have been completed fully. The flooring shall be leveling and smooth, and the height and width of the doors shall comply with the design requirements. 2 For the concealed wire chase, closed conduit, pore space and vertical shaft, the position, quantity and size shall comply with the design requirements. 3 In the locations paved with free access floors, the antistatic measures and grounding of the free access floor shall comply with the design requirements. 4 In telecommunication room and equipment room, 220V single-phase electric outlet (with protective ground), shall be provided. 5 In telecommunication room and equipment room, reliable grounding connection shall be provided. The ground resistance value and grounding connection setting shall comply with the design requirements. 6 The position, floor area, height, ventilation, fire prevention, environmental temperature and humidity of the telecommunication room and equipment room shall comply with the design requirements. 2.0.2 The inspection of the building incoming feeder room and inlet facilities shall include the following items: 1 The distance between the incoming pipe and other facilities like power supply, water supply, coal gas and sewerage shall comply with the design requirements. 2 The cable/wire laying method shall comply with the design requirements. 3 The treatment in the pipe inlet position shall comply with the design requirements, and shall be equipped with proper drainage and other measures to prevent the entrance of gas, water and insects. 4 The position, floor area, height, lighting, power supply, ground, fire prevention and waterproof measures of the incoming feeder room shall comply with the design requirements. 2.0.3 The installation mode of the relevant facilities shall comply with the antiseismic requirements stated in the design documents. 3. Inspection of equipment and testing instruments/tools 3.0.1 The equipment inspection shall comply with the following requirements: 1 Brand, model, specification, quantity and quality of the cables and equipments used in the project shall be inspected prior to construction. They shall comply with the design requirements and provide the corresponding quality documents or certificates. Should the cables or equipments are not supplied with proper factory inspection certificates, quality documents, or are not in accordance with the design requirements, they shall not be applied in the project.
1. General Provisions 2. Environment inspection 3. Inspection of equipment and testing instruments/tools 4 Inspection of equipment installation 5. Inspection of the cable laying and protection mode 6. Cable Terminal 7. Engineering electric testing 8. Acceptance of management system 9. Engineering acceptance Appendix A: Inspection item and content of engineering acceptance for generic cabling system Appendix B: electric testing method and testing contents of generic cabling system Appendix C: testing method of optical fiber chain circuit Appendix D: Acceptance content of generic cabling engineering management system Appendix E: Significations of the test items and technical indicators Wording Explanation
GB 50312-2007 is referred in:
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50339-2013 Code for acceptance of quality of Intelligent building systems
* GB 50462-2015 Code for construction and acceptance of data center infrastructure
*GB 50348-2018 Technisal code for engineering of security and protection system
Code of China
Standard
GB 50312-2007  Code for Engineering Acceptance of Generic Cabling System (English Version)
Standard No.GB 50312-2007
Statusabolished
LanguageEnglish
File FormatPDF
Word Count30500 words
Price(USD)100.0
Implemented on2007-10-1
Deliveryvia email in 1 business day
Detail of GB 50312-2007
Standard No.
GB 50312-2007
English Name
Code for Engineering Acceptance of Generic Cabling System
Chinese Name
综合布线系统工程验收规范
Chinese Classification
P33
Professional Classification
GB
ICS Classification
Issued by
Ministry of Construction
Issued on
2007-04-06
Implemented on
2007-10-1
Status
abolished
Superseded by
GB/T 50312-2016 Code for engineering acceptance of generic cabling system
Superseded on
2017-4-1
Abolished on
2017-04-01
Superseding
GB/T 50312-2000 Code for engineering acceptance of generic cabling system for building and campus
Language
English
File Format
PDF
Word Count
30500 words
Price(USD)
100.0
Keywords
GB 50312-2007, GB/T 50312-2007, GBT 50312-2007, GB50312-2007, GB 50312, GB50312, GB/T50312-2007, GB/T 50312, GB/T50312, GBT50312-2007, GBT 50312, GBT50312
Introduction of GB 50312-2007
1. General Provisions 1.0.1 This Code is formulated with a view to uniform the technical requirements on installation quality inspection, routine inspection and final acceptance of the generic cabling system for buildings and building complexes. 1.0.2 This Code is applicable to the acceptance inspections of the generic cabling systems in the construction, extension and renovation of buildings and building complexes. 1.0.3 In the implementation of the generic cabling system, the requirements on the engineering acceptance stated in the engineering documents and contract documents shall not be lower than the provisions of this code. 1.0.4 In the construction procedure, the construction organization must comply with the relevant provisions of this code on engineering acceptance. The development organization shall, through on-site representative or supervisors, strengthen the construction quality inspection and timely organize inspection and acceptance for the concealed works. 1.0.5 The generic cabling system shall comply with the design requirements. Self-check testing and final acceptance testing shall be carried out prior to the engineering acceptance. 1.0.6 For the engineering acceptance of generic cabling system, not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with. 2. Environment inspection 2.0.1 The inspection of the working area, telecommunication room and equipment room shall include the following contents: 1 The civil works of the working area, telecommunication room and equipment room have been completed fully. The flooring shall be leveling and smooth, and the height and width of the doors shall comply with the design requirements. 2 For the concealed wire chase, closed conduit, pore space and vertical shaft, the position, quantity and size shall comply with the design requirements. 3 In the locations paved with free access floors, the antistatic measures and grounding of the free access floor shall comply with the design requirements. 4 In telecommunication room and equipment room, 220V single-phase electric outlet (with protective ground), shall be provided. 5 In telecommunication room and equipment room, reliable grounding connection shall be provided. The ground resistance value and grounding connection setting shall comply with the design requirements. 6 The position, floor area, height, ventilation, fire prevention, environmental temperature and humidity of the telecommunication room and equipment room shall comply with the design requirements. 2.0.2 The inspection of the building incoming feeder room and inlet facilities shall include the following items: 1 The distance between the incoming pipe and other facilities like power supply, water supply, coal gas and sewerage shall comply with the design requirements. 2 The cable/wire laying method shall comply with the design requirements. 3 The treatment in the pipe inlet position shall comply with the design requirements, and shall be equipped with proper drainage and other measures to prevent the entrance of gas, water and insects. 4 The position, floor area, height, lighting, power supply, ground, fire prevention and waterproof measures of the incoming feeder room shall comply with the design requirements. 2.0.3 The installation mode of the relevant facilities shall comply with the antiseismic requirements stated in the design documents. 3. Inspection of equipment and testing instruments/tools 3.0.1 The equipment inspection shall comply with the following requirements: 1 Brand, model, specification, quantity and quality of the cables and equipments used in the project shall be inspected prior to construction. They shall comply with the design requirements and provide the corresponding quality documents or certificates. Should the cables or equipments are not supplied with proper factory inspection certificates, quality documents, or are not in accordance with the design requirements, they shall not be applied in the project.
Contents of GB 50312-2007
1. General Provisions 2. Environment inspection 3. Inspection of equipment and testing instruments/tools 4 Inspection of equipment installation 5. Inspection of the cable laying and protection mode 6. Cable Terminal 7. Engineering electric testing 8. Acceptance of management system 9. Engineering acceptance Appendix A: Inspection item and content of engineering acceptance for generic cabling system Appendix B: electric testing method and testing contents of generic cabling system Appendix C: testing method of optical fiber chain circuit Appendix D: Acceptance content of generic cabling engineering management system Appendix E: Significations of the test items and technical indicators Wording Explanation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB 50312-2007, GB/T 50312-2007, GBT 50312-2007, GB50312-2007, GB 50312, GB50312, GB/T50312-2007, GB/T 50312, GB/T50312, GBT50312-2007, GBT 50312, GBT50312