1 General Provisions
1.0.1 This code is formulated to guarantee the construction quality of electrical lighting installation , promote scientific construction management and technological progress as well as to unify the requirements for handover and acceptance of electrical lighting installation construction.
1.0.2 This code is applicable to the construction, handover and acceptance installation project for electrical lighting installations in industrial and civil buildings as well as in structure.
1.0.3 The construction of electrical lighting installation shall be carried out according to the approved design document and any design alteration under construction or deepened design according to the engineering contract shall be confirmed by the original design organization.
1.0.4 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for the construction, inspection and acceptance of electrical lighting installations.
Contents
1 General Provisions
2 Terms
3 Basic Requirement
4 Luminaires
4.1 General Requirement
4.2 Luminaires for Common Use
4.3 Luminaires for Special Use
5 Socket, Switch and Fan
5.1 Socket
5.2 Switch
5.3 Fan
6 Lighting Distribution Box (Panel)
7 Pre-operational Test and Measurement of Electrifying
7.1 Pre-operational Test of Electrifying
7.2 Measurement of Illumination and Lighting Power Density
8 Handover and Acceptance of Project
Explanation of Wording in this Code
List of Quoted Standards
Standard
GB 50617-2010 Code for construction and acceprance of electrical lighting installation in building (English Version)
Standard No.
GB 50617-2010
Status
superseded
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
180.0
Implemented on
2011-6-1
Delivery
via email in 1 business day
Detail of GB 50617-2010
Standard No.
GB 50617-2010
English Name
Code for construction and acceprance of electrical lighting installation in building
1 General Provisions
1.0.1 This code is formulated to guarantee the construction quality of electrical lighting installation , promote scientific construction management and technological progress as well as to unify the requirements for handover and acceptance of electrical lighting installation construction.
1.0.2 This code is applicable to the construction, handover and acceptance installation project for electrical lighting installations in industrial and civil buildings as well as in structure.
1.0.3 The construction of electrical lighting installation shall be carried out according to the approved design document and any design alteration under construction or deepened design according to the engineering contract shall be confirmed by the original design organization.
1.0.4 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for the construction, inspection and acceptance of electrical lighting installations.
Contents of GB 50617-2010
Contents
1 General Provisions
2 Terms
3 Basic Requirement
4 Luminaires
4.1 General Requirement
4.2 Luminaires for Common Use
4.3 Luminaires for Special Use
5 Socket, Switch and Fan
5.1 Socket
5.2 Switch
5.3 Fan
6 Lighting Distribution Box (Panel)
7 Pre-operational Test and Measurement of Electrifying
7.1 Pre-operational Test of Electrifying
7.2 Measurement of Illumination and Lighting Power Density
8 Handover and Acceptance of Project
Explanation of Wording in this Code
List of Quoted Standards