2025-7-20 18.97.14.86
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 19314.10-2023
GB/T 19314.10-2023   Small craft—Hull construction and scantlings—Part 10:Rig loads and rig attachment in sailing craft (English Version)
Standard No.: GB/T 19314.10-2023 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 40000 words Price(USD):1200.0 remind me the price change

Email:

Implemented on:2023-12-1 Delivery: via email in 1~3 business day
,,
Standard No.: GB/T 19314.10-2023
English Name: Small craft—Hull construction and scantlings—Part 10:Rig loads and rig attachment in sailing craft
Chinese Name: 小艇 艇体结构和构件尺寸 第10部分:帆艇帆装载荷及帆装附件
Chinese Classification: U18    Small vessels - overall
Professional Classification: GB    National Standard
Issued by: SAMR; SAC
Issued on: 2023-05-23
Implemented on: 2023-12-1
Status: valid
Language: English
File Format: PDF
Word Count: 40000 words
Price(USD): 1200.0
Delivery: via email in 1~3 business day
Small craft - Hull construction and scantlings -Part 10: Rig loads and rig attachment in sailing craft 1 Scope This document specifies methods for the determination of: - the design loads and design stresses on rig elements; and - the loads and scantlings of rig attachments and mast steps/pillars; on monohull and multihulls sailing craft. It also gives, in Annexes, "established practices "for the assessment of mast steps/pillars or chainplates Note 1: Other engineering methods can be used provided the design loads and design stresses are used. This document is applicable to craft with a hull length LH up to 24m but it can also be applied to craft up to 24 m load line length. Note 2: The load line length is defined in the OMI "International Load Lines Convention 1966/2005", it is smaller than LH. This length also sets up, at 24 m, the lower limit of several IMO conventions. Scantlings derived from this document are primarily intended to apply to recreational craft, including charter vessels. This document is not applicable to racing craft designed only for professional racing. This document only considers the loads exerted when sailing. Any loads that may result from other situations are not considered in this document. Throughout this document, and unless otherwise specified, dimensions are in (m), areas in (m2), masses in (kg), forces in (N), moments in (N·m), stresses and elastic modulus in N/mm²(1 N/mm2=1 Mpa). Unless otherwise stated, the craft is assessed in fully loaded ready for use condition. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 12215-5:2019 Smallcraft - Hullconstruction and scantlings - Part 5 : Design pressures for monohulls, design stresses, scantlings determination Note: GB/T 19314.5-2019 Small craft - Hull construction and scantlings - Part 5 : Design pressures for monohulls, design stresses, scantlings determination (ISO 12215-5: 2008, IDT) 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 design categories description of the sea and wind conditions for which a craft is assessed to be suitable Note 1: The design categories are defined in ISO 12217 (all parts). Note 2: The definitions of the design categories are in line with the European Recreational Craft Directive 2013/53/EU [Source: ISO 12215-5:2019, 3.1] 3.2 loaded displacement mLDC mass of water displaced by the craft, including all appendages, when in the fully loaded ready-for-use condition Note: The fully loaded ready-for-use condition is further defined in ISO 8666. [Source: ISO 12215-5:2019, 3.2] 3.3 sailing craft craft for which the primary means of propulsion is wind power Note: It is further defined in ISO 8666. [Source: ISO 12215-5:2019, 3.3, modified - Note 2 deleted] 3.4 monohull craft with only one hull 3.5 multihull craft with two or more hulls with a connecting wet deck/platform or beams above the loaded waterline, as opposed to a tunnel boat or scow 3.6 mast step element fitted at the bottom of the mast that supports the mast compression and transmits it to the rest of the structure 3.7 mast pillar pillar in a deck stepped rig, structural element that transmits the mast compression to the rest of the structure 3.8 chainplate rig attachment component(s) to which the rig elements are attached, transmitting their load to the rest of the structure, including tie rods where relevant Example: Metal chainplate, strapped composite chainplate Note: See Annex D. 3.9 connection all elements or group of elements connecting the rig attachment to the structure of the craft Example: Bolts, lamination. Note: Some of these elements can be part of the chainplate. 3.10 mLDC condition maximum load condition corresponding to the loaded displacement (3.2) 4 Symbols Unless specified otherwise, the symbols, factors and parameters given in Table 1 apply.
Code of China
Standard
GB/T 19314.10-2023  Small craft—Hull construction and scantlings—Part 10:Rig loads and rig attachment in sailing craft (English Version)
Standard No.GB/T 19314.10-2023
Statusvalid
LanguageEnglish
File FormatPDF
Word Count40000 words
Price(USD)1200.0
Implemented on2023-12-1
Deliveryvia email in 1~3 business day
Detail of GB/T 19314.10-2023
Standard No.
GB/T 19314.10-2023
English Name
Small craft—Hull construction and scantlings—Part 10:Rig loads and rig attachment in sailing craft
Chinese Name
小艇 艇体结构和构件尺寸 第10部分:帆艇帆装载荷及帆装附件
Chinese Classification
U18
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2023-05-23
Implemented on
2023-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
40000 words
Price(USD)
1200.0
Keywords
GB/T 19314.10-2023, GB 19314.10-2023, GBT 19314.10-2023, GB/T19314.10-2023, GB/T 19314.10, GB/T19314.10, GB19314.10-2023, GB 19314.10, GB19314.10, GBT19314.10-2023, GBT 19314.10, GBT19314.10
Introduction of GB/T 19314.10-2023
Small craft - Hull construction and scantlings -Part 10: Rig loads and rig attachment in sailing craft 1 Scope This document specifies methods for the determination of: - the design loads and design stresses on rig elements; and - the loads and scantlings of rig attachments and mast steps/pillars; on monohull and multihulls sailing craft. It also gives, in Annexes, "established practices "for the assessment of mast steps/pillars or chainplates Note 1: Other engineering methods can be used provided the design loads and design stresses are used. This document is applicable to craft with a hull length LH up to 24m but it can also be applied to craft up to 24 m load line length. Note 2: The load line length is defined in the OMI "International Load Lines Convention 1966/2005", it is smaller than LH. This length also sets up, at 24 m, the lower limit of several IMO conventions. Scantlings derived from this document are primarily intended to apply to recreational craft, including charter vessels. This document is not applicable to racing craft designed only for professional racing. This document only considers the loads exerted when sailing. Any loads that may result from other situations are not considered in this document. Throughout this document, and unless otherwise specified, dimensions are in (m), areas in (m2), masses in (kg), forces in (N), moments in (N·m), stresses and elastic modulus in N/mm²(1 N/mm2=1 Mpa). Unless otherwise stated, the craft is assessed in fully loaded ready for use condition. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 12215-5:2019 Smallcraft - Hullconstruction and scantlings - Part 5 : Design pressures for monohulls, design stresses, scantlings determination Note: GB/T 19314.5-2019 Small craft - Hull construction and scantlings - Part 5 : Design pressures for monohulls, design stresses, scantlings determination (ISO 12215-5: 2008, IDT) 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 design categories description of the sea and wind conditions for which a craft is assessed to be suitable Note 1: The design categories are defined in ISO 12217 (all parts). Note 2: The definitions of the design categories are in line with the European Recreational Craft Directive 2013/53/EU [Source: ISO 12215-5:2019, 3.1] 3.2 loaded displacement mLDC mass of water displaced by the craft, including all appendages, when in the fully loaded ready-for-use condition Note: The fully loaded ready-for-use condition is further defined in ISO 8666. [Source: ISO 12215-5:2019, 3.2] 3.3 sailing craft craft for which the primary means of propulsion is wind power Note: It is further defined in ISO 8666. [Source: ISO 12215-5:2019, 3.3, modified - Note 2 deleted] 3.4 monohull craft with only one hull 3.5 multihull craft with two or more hulls with a connecting wet deck/platform or beams above the loaded waterline, as opposed to a tunnel boat or scow 3.6 mast step element fitted at the bottom of the mast that supports the mast compression and transmits it to the rest of the structure 3.7 mast pillar pillar in a deck stepped rig, structural element that transmits the mast compression to the rest of the structure 3.8 chainplate rig attachment component(s) to which the rig elements are attached, transmitting their load to the rest of the structure, including tie rods where relevant Example: Metal chainplate, strapped composite chainplate Note: See Annex D. 3.9 connection all elements or group of elements connecting the rig attachment to the structure of the craft Example: Bolts, lamination. Note: Some of these elements can be part of the chainplate. 3.10 mLDC condition maximum load condition corresponding to the loaded displacement (3.2) 4 Symbols Unless specified otherwise, the symbols, factors and parameters given in Table 1 apply.
Contents of GB/T 19314.10-2023
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 19314.10-2023, GB 19314.10-2023, GBT 19314.10-2023, GB/T19314.10-2023, GB/T 19314.10, GB/T19314.10, GB19314.10-2023, GB 19314.10, GB19314.10, GBT19314.10-2023, GBT 19314.10, GBT19314.10