2025-12-19 216.73.216.41
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JGJ/T 251-2011
JGJ/T 251-2011   Technical specification for anticorrosion of building steel structure (English Version)
Standard No.: JGJ/T 251-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 8000 words Translation Price(USD):200.0 remind me the price change

Email:

Implemented on:2012-3-1 Delivery: via email in 1 business day

→ → →

,,2012-3-1,14113775384190A10D01D6555CA03
Standard No.: JGJ/T 251-2011
English Name: Technical specification for anticorrosion of building steel structure
Chinese Name: 建筑钢结构防腐蚀技术规程
Professional Classification: JG    Professional Standard - Building
Source Content Issued by: MOHURD
Issued on: 2011-7-13
Implemented on: 2012-3-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 8000 words
Translation Price(USD): 200.0
Delivery: via email in 1 business day
1 General 1.0.1 This Specification was formulated with a view to normalizing the technical requirements of anti-corrosion design, construction, acceptance and maintenance of the building steel structure, guaranteeing the engineering quality, making them technology-advanced, safe and reliable and economically reasonable. 1.0.2 This Specification is applicable to the anti-corrosion design, construction, acceptance and maintenance of newly-built building steel structure in atmospheric environment. 1.0.3 The anti-corrosion design, construction, acceptance and maintenance of building steel structure shall not only comply with the requirements of this Specification, but also comply with those in the current relevant standards of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Corrosion rate The value of corrosion effect of the structure member occurred in unit time 2.1.2 Atmospheric corrosion Material damage caused due to the chemical and electrochemical action between the material and atmospheric environment medium. 2.1.3 Corrosion allowance In the design of steel structure member, the corresponding thickness increased with the consideration of potential corrosive wear in operating period. 2.1.4 Coating The process of coating paints on matrix surface to form coat with protection, finishing or specific functions. 2.1.5 Surface pretreatment The measure taken for the matrix surface by mechanical method or chemical method before coating in order to improve the binding force and corrosion protection effect between coating and matrix to meet the coating requirements. 2.1.6 Grade of removing rust The clean degree grade of attachment such as the rust layer on steel surface before coating 2.1.7 Service life of protective layer The predicted service life of corrosion protection layer under the conditions of reasonable design, correct construction, normal use and maintenance 2.1.8 Adhesive strength The binding force between dry coating film and its substrate 2.1.9 Metal thermal spraying The technology process of using high-pressure air, inert gases or electric arc etc. to spray molten corrosion resistant metal to the surface of protected structure to form protective coating
Foreword I 1 General 2 Terms and Symbols 3 Design 3.1 General Requirements 3.2 Surface Treatment 3.3 Coating Protection 3.4 Adhesive Strength 4 Construction 4.1 General Requirements 4.2 Surface Treatment 4.3 Coating Construction 4.4 Metal Thermal Spraying 5 Acceptance 5.1 General Requirements 5.2 Surface Treatment 5.3 Coating Construction 5.4 Metal Thermal Spraying 6 Safety, Health and Environmental Protection 6.1 General Requirements 6.2 Safety and Health 6.3 Environmental Protection 7 Maintenance Management Appendix A Types of Gases in Atmopheric Environment Appendix B Common Anticorrosion Protective Layer Systems Appendix C Common Sealing Agent, Sealing Paint, and Coating Layer Paint Appendix E Quality Acceptance Record Table for Inspection Lots of Anticorrosion Coating of Building Steel Structure Explanation of Wording List of Quoted Standards
Code of China
Standard
JGJ/T 251-2011  Technical specification for anticorrosion of building steel structure (English Version)
Standard No.JGJ/T 251-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count8000 words
Price(USD)200.0
Implemented on2012-3-1
Deliveryvia email in 1 business day
Detail of JGJ/T 251-2011
Standard No.
JGJ/T 251-2011
English Name
Technical specification for anticorrosion of building steel structure
Chinese Name
建筑钢结构防腐蚀技术规程
Chinese Classification
Professional Classification
JG
ICS Classification
Issued by
MOHURD
Issued on
2011-7-13
Implemented on
2012-3-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
200.0
Keywords
JGJ/T 251-2011, JGJ 251-2011, JGJT 251-2011, JGJ/T251-2011, JGJ/T 251, JGJ/T251, JGJ251-2011, JGJ 251, JGJ251, JGJT251-2011, JGJT 251, JGJT251
Introduction of JGJ/T 251-2011
1 General 1.0.1 This Specification was formulated with a view to normalizing the technical requirements of anti-corrosion design, construction, acceptance and maintenance of the building steel structure, guaranteeing the engineering quality, making them technology-advanced, safe and reliable and economically reasonable. 1.0.2 This Specification is applicable to the anti-corrosion design, construction, acceptance and maintenance of newly-built building steel structure in atmospheric environment. 1.0.3 The anti-corrosion design, construction, acceptance and maintenance of building steel structure shall not only comply with the requirements of this Specification, but also comply with those in the current relevant standards of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Corrosion rate The value of corrosion effect of the structure member occurred in unit time 2.1.2 Atmospheric corrosion Material damage caused due to the chemical and electrochemical action between the material and atmospheric environment medium. 2.1.3 Corrosion allowance In the design of steel structure member, the corresponding thickness increased with the consideration of potential corrosive wear in operating period. 2.1.4 Coating The process of coating paints on matrix surface to form coat with protection, finishing or specific functions. 2.1.5 Surface pretreatment The measure taken for the matrix surface by mechanical method or chemical method before coating in order to improve the binding force and corrosion protection effect between coating and matrix to meet the coating requirements. 2.1.6 Grade of removing rust The clean degree grade of attachment such as the rust layer on steel surface before coating 2.1.7 Service life of protective layer The predicted service life of corrosion protection layer under the conditions of reasonable design, correct construction, normal use and maintenance 2.1.8 Adhesive strength The binding force between dry coating film and its substrate 2.1.9 Metal thermal spraying The technology process of using high-pressure air, inert gases or electric arc etc. to spray molten corrosion resistant metal to the surface of protected structure to form protective coating
Contents of JGJ/T 251-2011
Foreword I 1 General 2 Terms and Symbols 3 Design 3.1 General Requirements 3.2 Surface Treatment 3.3 Coating Protection 3.4 Adhesive Strength 4 Construction 4.1 General Requirements 4.2 Surface Treatment 4.3 Coating Construction 4.4 Metal Thermal Spraying 5 Acceptance 5.1 General Requirements 5.2 Surface Treatment 5.3 Coating Construction 5.4 Metal Thermal Spraying 6 Safety, Health and Environmental Protection 6.1 General Requirements 6.2 Safety and Health 6.3 Environmental Protection 7 Maintenance Management Appendix A Types of Gases in Atmopheric Environment Appendix B Common Anticorrosion Protective Layer Systems Appendix C Common Sealing Agent, Sealing Paint, and Coating Layer Paint Appendix E Quality Acceptance Record Table for Inspection Lots of Anticorrosion Coating of Building Steel Structure Explanation of Wording List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JGJ/T 251-2011, JGJ 251-2011, JGJT 251-2011, JGJ/T251-2011, JGJ/T 251, JGJ/T251, JGJ251-2011, JGJ 251, JGJ251, JGJT251-2011, JGJT 251, JGJT251