2025-12-25 216.73.216.41
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTG/T F60-2009
JTG/T F60-2009   Technical Guidelines for Construction of Highway Tunnel (English Version)
Standard No.: JTG/T F60-2009 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 35000 words Translation Price(USD):700.0 remind me the price change

Email:

Implemented on:2009-10-1 Delivery: via email in 1 business day

→ → →

,2020-8-1,2009-10-1,14113765336366CD55C37EAC32AF9
Standard No.: JTG/T F60-2009
English Name: Technical Guidelines for Construction of Highway Tunnel
Chinese Name: 公路隧道施工技术细则
Professional Classification: JT    Professional Standard - Transport
Source Content Issued by: MOT
Issued on: 2009-08-25
Implemented on: 2009-10-1
Status: superseded
Superseded by:JTG/T 3660-2020 Technical Specifications for Construction of Highway tunnel
Superseded on:2020-8-1
Target Language: English
File Format: PDF
Word Count: 35000 words
Translation Price(USD): 700.0
Delivery: via email in 1 business day
1.0.1 This Guideline is formulated with a view to cooperate with the implementation of "Technical Specifications for Construction of Highway Tunnel" (JTG F60-2009), refine the technical requirements for the construction of mountain highway tunnel (hereinafter collectively referred to as "highway tunnel") engineering, ensure the engineering quality, so that the tunnel construction is in line with requirements of advanced technology, security and environmental protection and economic feasibility. 1.0.2 This Guideline is applicable to newly build and reconstruct the highway tunnels at all levels based on drilling and blasting excavation; highway tunnels of other forms may refer to this. 1.0.3 Construction of highway tunnel shall be in accordance with the approved design documents. The construction preparation and construction processes shall all strengthen the geological review work and implement dynamic management on the basis of geological prediction, forecasting and monitoring measurement information. 1.0.4 The construction of highway tunnels shall actively and carefully promote the application of new technologies, new processes, new materials and new facilities, improve management level and technical level, save energy, reduce material consumption and improve overall economic efficiency. 1.0.5 During the construction process of highway tunnel, it shall have a comprehensive collection of raw data and information; construction records shall be done well and tunnel construction technology summary shall be prepared. When the tunnels are submitted and completed, submission and completion documents shall be handed over timely.
1. General Provisions 2. Terminologies and Symbols 2.1 Terminologies 2.2 Symbols 3. Preparation of Construction 3.1 General rules 3.2 Construction site and temporary works 3.3 Constructor, materials and equipment 4. Construction Survey 4.1 General rules 4.2 Control survey 4.3 Setting-out survey 4.4 Piercing error survey and adjustment 4.5 Handover (final) survey 5. Tunnel Adit, Open Tunnel and Shallow-buried District Projects 5.1 Tunnel adit projects 5.2 Open tunnel project 5.3 Shallow-buried district project 6. Excavation 6.1 General rules 6.2 Excavation method 6.3 Over-excavation and under-excavation control 6.4 Drilling and blasting design 7. Support and Lining 7.1 General rules 7.2 Shotcrete 7.3 Rock bolt 7.4 Steel frame 7.5 Lining steel bar 7.6 Forming concrete lining 7.7 Inverted arch and soleplate 8. Small-distance Tunnel and Multi-arch Tunnel 8.1 Small-distance tunnel 8.2 Multi-arch tunnel 9. Monitoring Measurement 9.1 General rules 9.2 Measuring operation 9.3 Data processing and application of measurement 10. Geological prediction 10.1 General rules 10.2 Gradation and prediction content of geology prediction 11. Waterproof and drainage 11.1 Generaly rules 11.2 Waterproof and drainage of construction 11.3 Construction of waterproof and drainage structure 11.4 Waterproofing of Grouting 12. Wind, Water and Electricity Supply 12.1 Wind supply 12.2 Water supply 12.3 Power supply and lighting 13. Access Adit 13.1 General rules 13.2 Inclined shaft 13.3 Vertical shaft 13.4 Transverse tunnel and parallel pilot tunnel 14. Ancillary Works Measures 14.1 Strata stabilization measures 14.2 Water inflow treatment measures 15. Construction of Adverse Geological and Special Geotechnical District 15.1 General rules 15.2 Expansive rock and soil 15.3 Loess 15.4 Karst 15.5 Water containing sand bed 15.6 Gas 15.7 Rock blasting 15.8 Weak crushing surrounding rock with abundant water 16. Tunnel Pavement Construction 17. Ancillary Facilities Engineering 17.1 Equipments tunnel, cross aisle and others 17.2 Decoration engineering Appendix A Surrounding Rock Grades of Highway Tunnel Appendix B Influencing Factors of Geological Hazard Grades Appendix C Main Excavation Methods of Tunnel and Sequence Diagram of Excavation, Support Appendix D Prophylaxis and Treatment of Collapse Appendix E Ventilation System of Construction Appendix F Construction Note of Lock Bolt Support with Shotcrete Explanation of Wording in this Guideline
Code of China
Standard
JTG/T F60-2009  Technical Guidelines for Construction of Highway Tunnel (English Version)
Standard No.JTG/T F60-2009
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count35000 words
Price(USD)700.0
Implemented on2009-10-1
Deliveryvia email in 1 business day
Detail of JTG/T F60-2009
Standard No.
JTG/T F60-2009
English Name
Technical Guidelines for Construction of Highway Tunnel
Chinese Name
公路隧道施工技术细则
Chinese Classification
Professional Classification
JT
ICS Classification
Issued by
MOT
Issued on
2009-08-25
Implemented on
2009-10-1
Status
superseded
Superseded by
JTG/T 3660-2020 Technical Specifications for Construction of Highway tunnel
Superseded on
2020-8-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
35000 words
Price(USD)
700.0
Keywords
JTG/T F60-2009, JTG F60-2009, JTGT F60-2009, JTG/TF60-2009, JTG/T F60, JTG/TF60, JTGF60-2009, JTG F60, JTGF60, JTGTF60-2009, JTGT F60, JTGTF60
Introduction of JTG/T F60-2009
1.0.1 This Guideline is formulated with a view to cooperate with the implementation of "Technical Specifications for Construction of Highway Tunnel" (JTG F60-2009), refine the technical requirements for the construction of mountain highway tunnel (hereinafter collectively referred to as "highway tunnel") engineering, ensure the engineering quality, so that the tunnel construction is in line with requirements of advanced technology, security and environmental protection and economic feasibility. 1.0.2 This Guideline is applicable to newly build and reconstruct the highway tunnels at all levels based on drilling and blasting excavation; highway tunnels of other forms may refer to this. 1.0.3 Construction of highway tunnel shall be in accordance with the approved design documents. The construction preparation and construction processes shall all strengthen the geological review work and implement dynamic management on the basis of geological prediction, forecasting and monitoring measurement information. 1.0.4 The construction of highway tunnels shall actively and carefully promote the application of new technologies, new processes, new materials and new facilities, improve management level and technical level, save energy, reduce material consumption and improve overall economic efficiency. 1.0.5 During the construction process of highway tunnel, it shall have a comprehensive collection of raw data and information; construction records shall be done well and tunnel construction technology summary shall be prepared. When the tunnels are submitted and completed, submission and completion documents shall be handed over timely.
Contents of JTG/T F60-2009
1. General Provisions 2. Terminologies and Symbols 2.1 Terminologies 2.2 Symbols 3. Preparation of Construction 3.1 General rules 3.2 Construction site and temporary works 3.3 Constructor, materials and equipment 4. Construction Survey 4.1 General rules 4.2 Control survey 4.3 Setting-out survey 4.4 Piercing error survey and adjustment 4.5 Handover (final) survey 5. Tunnel Adit, Open Tunnel and Shallow-buried District Projects 5.1 Tunnel adit projects 5.2 Open tunnel project 5.3 Shallow-buried district project 6. Excavation 6.1 General rules 6.2 Excavation method 6.3 Over-excavation and under-excavation control 6.4 Drilling and blasting design 7. Support and Lining 7.1 General rules 7.2 Shotcrete 7.3 Rock bolt 7.4 Steel frame 7.5 Lining steel bar 7.6 Forming concrete lining 7.7 Inverted arch and soleplate 8. Small-distance Tunnel and Multi-arch Tunnel 8.1 Small-distance tunnel 8.2 Multi-arch tunnel 9. Monitoring Measurement 9.1 General rules 9.2 Measuring operation 9.3 Data processing and application of measurement 10. Geological prediction 10.1 General rules 10.2 Gradation and prediction content of geology prediction 11. Waterproof and drainage 11.1 Generaly rules 11.2 Waterproof and drainage of construction 11.3 Construction of waterproof and drainage structure 11.4 Waterproofing of Grouting 12. Wind, Water and Electricity Supply 12.1 Wind supply 12.2 Water supply 12.3 Power supply and lighting 13. Access Adit 13.1 General rules 13.2 Inclined shaft 13.3 Vertical shaft 13.4 Transverse tunnel and parallel pilot tunnel 14. Ancillary Works Measures 14.1 Strata stabilization measures 14.2 Water inflow treatment measures 15. Construction of Adverse Geological and Special Geotechnical District 15.1 General rules 15.2 Expansive rock and soil 15.3 Loess 15.4 Karst 15.5 Water containing sand bed 15.6 Gas 15.7 Rock blasting 15.8 Weak crushing surrounding rock with abundant water 16. Tunnel Pavement Construction 17. Ancillary Facilities Engineering 17.1 Equipments tunnel, cross aisle and others 17.2 Decoration engineering Appendix A Surrounding Rock Grades of Highway Tunnel Appendix B Influencing Factors of Geological Hazard Grades Appendix C Main Excavation Methods of Tunnel and Sequence Diagram of Excavation, Support Appendix D Prophylaxis and Treatment of Collapse Appendix E Ventilation System of Construction Appendix F Construction Note of Lock Bolt Support with Shotcrete Explanation of Wording in this Guideline
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTG/T F60-2009, JTG F60-2009, JTGT F60-2009, JTG/TF60-2009, JTG/T F60, JTG/TF60, JTGF60-2009, JTG F60, JTGF60, JTGTF60-2009, JTGT F60, JTGTF60