2023-3-23 3.239.117.1
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SH/T 3039-2003
SH/T 3039-2003   General seismic design rule of non-buried pipe for petrochemical industry (English Version)
Standard No.: SH/T 3039-2003 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 6500 words Price(USD):160.0 remind me the price change

Email:

Implemented on:2004-7-1 Delivery: via email in 1 business day
,,
Standard No.: SH/T 3039-2003
English Name: General seismic design rule of non-buried pipe for petrochemical industry
Chinese Name: 石油化工非埋地管道设计通则
Chinese Classification: P72    Petrochemical and chemical industry engineering
Professional Classification: SH    Professional Standard - Petrochemical
Issued by: SinoPec Engineering Construction Management Department
Issued on: 2004-03-10
Implemented on: 2004-7-1
Status: superseded
Superseded by:SH/T 3039-2018
Superseded on:2019-1-1
Superseding:SH 3039-1991
Language: English
File Format: PDF
Word Count: 6500 words
Price(USD): 160.0
Delivery: via email in 1 business day
1 Scope 1.1 This Rule is applicable to seismic design of non-buried pipe for petrochemical industry, with seismic fortification intensity of Degree 6 ~ Degree 9 and nominal pressure less than or equal to 42MPa. Note: for the purpose of this code, words "seismic fortification intensity" are generally omitted, e.g. "seismic fortification intensity of Degree 6, Degree 7, Degree 8 or Degree 9" is referred to as "Intensity 6, Intensity 7, Intensity 8 or Intensity 9". 1.2 This Rule is not applicable to seismic design of long-distance pipe. 2 Normative References The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections), or revisions, of any of these publications do not apply to this standard. However parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies. GB 18306-2001 Seismic Ground Motion Parameter Zonation Map of China GB 50011-2001 Code for Seismic Design of Buildings GB 50316-2000 Design Code for Industrial Metallic Piping SH 3041-2003 The Specification of Piping Flexibility Design for Petrochemical Industry SH 3048-1999 Seismic Design Specification for Petrochemical Steel Facilities 3 Main Symbols
Foreword i 1 Scope 2 Normative References 3 Main Symbols 4 General Rules 5 General Requirements 6 Seismic Action and Seismic Checking Explanation of Wording Explanation of Provisions
Referred in SH/T 3039-2003:
*GB 18306-2001 Seismic ground motion parameter zonation map of China
*GB 50011-2001(2008) Code for Seismic Design of Buildings
*GB 50316-2000(2008) Design code for industrial metallic piping
*SH3041-2003
*SH 3048-1999 Seismic design specification for petrochemical steel facilities
SH/T 3039-2003 is referred in:
* SH 3012-2011 Specification for design of metallic piping layout in petrochemical engineering
* SH 3012-2011 Specification for design of metallic piping layout in petrochemical engineering
* SH/T 3059-2012 Specification for piping material design selection in petrochemical industry
Code of China
Standard
SH/T 3039-2003  General seismic design rule of non-buried pipe for petrochemical industry (English Version)
Standard No.SH/T 3039-2003
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count6500 words
Price(USD)160.0
Implemented on2004-7-1
Deliveryvia email in 1 business day
Detail of SH/T 3039-2003
Standard No.
SH/T 3039-2003
English Name
General seismic design rule of non-buried pipe for petrochemical industry
Chinese Name
石油化工非埋地管道设计通则
Chinese Classification
P72
Professional Classification
SH
ICS Classification
Issued by
SinoPec Engineering Construction Management Department
Issued on
2004-03-10
Implemented on
2004-7-1
Status
superseded
Superseded by
SH/T 3039-2018
Superseded on
2019-1-1
Abolished on
Superseding
SH 3039-1991
Language
English
File Format
PDF
Word Count
6500 words
Price(USD)
160.0
Keywords
SH/T 3039-2003, SH 3039-2003, SHT 3039-2003, SH/T3039-2003, SH/T 3039, SH/T3039, SH3039-2003, SH 3039, SH3039, SHT3039-2003, SHT 3039, SHT3039
Introduction of SH/T 3039-2003
1 Scope 1.1 This Rule is applicable to seismic design of non-buried pipe for petrochemical industry, with seismic fortification intensity of Degree 6 ~ Degree 9 and nominal pressure less than or equal to 42MPa. Note: for the purpose of this code, words "seismic fortification intensity" are generally omitted, e.g. "seismic fortification intensity of Degree 6, Degree 7, Degree 8 or Degree 9" is referred to as "Intensity 6, Intensity 7, Intensity 8 or Intensity 9". 1.2 This Rule is not applicable to seismic design of long-distance pipe. 2 Normative References The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections), or revisions, of any of these publications do not apply to this standard. However parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies. GB 18306-2001 Seismic Ground Motion Parameter Zonation Map of China GB 50011-2001 Code for Seismic Design of Buildings GB 50316-2000 Design Code for Industrial Metallic Piping SH 3041-2003 The Specification of Piping Flexibility Design for Petrochemical Industry SH 3048-1999 Seismic Design Specification for Petrochemical Steel Facilities 3 Main Symbols
Contents of SH/T 3039-2003
Foreword i 1 Scope 2 Normative References 3 Main Symbols 4 General Rules 5 General Requirements 6 Seismic Action and Seismic Checking Explanation of Wording Explanation of Provisions
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Foryou Tech Co., Ltd. 2008-2040
 
 
Keywords:
SH/T 3039-2003, SH 3039-2003, SHT 3039-2003, SH/T3039-2003, SH/T 3039, SH/T3039, SH3039-2003, SH 3039, SH3039, SHT3039-2003, SHT 3039, SHT3039