2025-12-21 216.73.216.41
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TSG G7002-2011
TSG G7002-2011   Boiler Periodical Inspection Regulation (Draft for Comments) (English Version)
Standard No.: TSG G7002-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 15000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on: Delivery: via email in 1 business day

→ → →

,,,1411377720426252C4FE851242D6A
Standard No.: TSG G7002-2011
English Name: Boiler Periodical Inspection Regulation (Draft for Comments)
Chinese Name: 锅炉定期检验规则 (征求意见稿)
Professional Classification: TSG    Special Equipment Safety Specification
Source Content Issued by: AQSIQ
Status: valid
Target Language: English
File Format: PDF
Word Count: 15000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
1 General Provisions 1.1 Purpose This Regulation was formulated according to "Regulations on Safety Supervision of Special Equipment" and "Supervision Regulation on Safety Technology for Boiler" in order to standardize the boiler periodical inspection and ensure the inspection quality. 1.2 Application scope This Regulation is applicable to the periodical inspection for the stationary pressure steam boiler, pressurized hot water boiler, organic heat carrier boiler and flue/flue-shell exhaust (waste) heat boiler for using exhaust (waste) heat within the scope of "Supervision Regulation on Safety Technology for Boiler". 1.3 Boiler periodical inspection scope 1.3.1 Boiler (excluding power boiler) The boiler with the steam (water-oil) separator cylinder includes the boiler proper and the pressure pipe [including steam (water-oil) separator cylinder] within the first weld of boiler feed water (oil) valve outlet and steam (water-oil) separator cylinder outlet; the boiler without the steam (water-oil) separator cylinder includes the boiler proper and the pressure pipe within the range of boiler feed water (oil) valve outlet and main steam (water-oil) outlet valve. 1.3.2 Power boiler (1) Boiler proper; (2) Main steam pipe refers to the main steam pipe between main steam outlet of boiler and the first weld (excluding weld) before electrical main steam valve of steam turbine, the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, and the high-pressure bypass pipe within the first weld (excluding weld) before pressure and temperature reducing valve, etc.; (3) Reheat steam pipe includes hot reheat steam pipe and cold reheat steam pipe; the hot reheat steam pipe refers to the reheat steam pipe between reheat steam outlet of boiler and the first weld (excluding weld) before electrical main steam valve of steam turbine, the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, and the low-pressure bypass pipe within the first weld (excluding weld) before pressure and temperature reducing valve, etc.; cold reheat steam pipe refers to the cold reheat steam pipe outside the first weld (excluding weld) behind check valve to the boiler proper, and the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, etc.; (4) Main water supply pipe refers to the main water supply pipe outside the first weld (excluding weld) behind boiler feed pump outlet valve to the boiler proper, and the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, etc.; (5) Blow-down pipe refers to the pipe outside the first weld (excluding weld) of blow-down pipe outlet and within the first weld (excluding weld) before primary valve; (6) Boiler start-up system refers to the steam-water (start-up) separator, storage tank (vessel) and the pressure pipe within the first weld (excluding weld) before altitude valve. 1.3.3 Safety accessories and instruments They refer to such safety accessories as safety valve, pressure measuring device, water (liquid) level measuring, indicating and control device, temperature measuring device, blowdown and discharge device, safety protection devices and relevant instruments, etc. 1.3.4 Combustion equipment and system 1.3.5 Special circumstances Periodical inspection for Class D steam-water multifunctional boiler shall be in accordance with Class B and Class C boilers; periodical inspection for other Class D boilers shall be carried out by the boiler user. 1.4 Basic requirements of periodical inspection 1.4.1 Periodical inspection definition Periodical inspection is the conformity verification for the current state of in-use boiler according to the safety technical regulation. Periodical inspection of boiler includes the external inspection of boiler under operating condition as well as internal inspection and hydraulic (pressure) test of boiler under shutdown condition.
1 General Provisions 2 Internal Inspection 3 External Inspection 4 Hydraulic (Pressure) Test 5 Supplementary Provisions Attachment A Report on Conclusion of Periodical Inspection for Class A Boilers Attachment B Report on Conclusion of Periodical Inspection for Classes B and C Boilers
Code of China
Standard
TSG G7002-2011  Boiler Periodical Inspection Regulation (Draft for Comments) (English Version)
Standard No.TSG G7002-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)300.0
Implemented on
Deliveryvia email in 1 business day
Detail of TSG G7002-2011
Standard No.
TSG G7002-2011
English Name
Boiler Periodical Inspection Regulation (Draft for Comments)
Chinese Name
锅炉定期检验规则 (征求意见稿)
Chinese Classification
Professional Classification
TSG
ICS Classification
Issued by
AQSIQ
Issued on
Implemented on
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
300.0
Keywords
TSG G7002-2011, TSG/T G7002-2011, TSGT G7002-2011, TSGG7002-2011, TSG G7002, TSGG7002, TSG/TG7002-2011, TSG/T G7002, TSG/TG7002, TSGTG7002-2011, TSGT G7002, TSGTG7002
Introduction of TSG G7002-2011
1 General Provisions 1.1 Purpose This Regulation was formulated according to "Regulations on Safety Supervision of Special Equipment" and "Supervision Regulation on Safety Technology for Boiler" in order to standardize the boiler periodical inspection and ensure the inspection quality. 1.2 Application scope This Regulation is applicable to the periodical inspection for the stationary pressure steam boiler, pressurized hot water boiler, organic heat carrier boiler and flue/flue-shell exhaust (waste) heat boiler for using exhaust (waste) heat within the scope of "Supervision Regulation on Safety Technology for Boiler". 1.3 Boiler periodical inspection scope 1.3.1 Boiler (excluding power boiler) The boiler with the steam (water-oil) separator cylinder includes the boiler proper and the pressure pipe [including steam (water-oil) separator cylinder] within the first weld of boiler feed water (oil) valve outlet and steam (water-oil) separator cylinder outlet; the boiler without the steam (water-oil) separator cylinder includes the boiler proper and the pressure pipe within the range of boiler feed water (oil) valve outlet and main steam (water-oil) outlet valve. 1.3.2 Power boiler (1) Boiler proper; (2) Main steam pipe refers to the main steam pipe between main steam outlet of boiler and the first weld (excluding weld) before electrical main steam valve of steam turbine, the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, and the high-pressure bypass pipe within the first weld (excluding weld) before pressure and temperature reducing valve, etc.; (3) Reheat steam pipe includes hot reheat steam pipe and cold reheat steam pipe; the hot reheat steam pipe refers to the reheat steam pipe between reheat steam outlet of boiler and the first weld (excluding weld) before electrical main steam valve of steam turbine, the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, and the low-pressure bypass pipe within the first weld (excluding weld) before pressure and temperature reducing valve, etc.; cold reheat steam pipe refers to the cold reheat steam pipe outside the first weld (excluding weld) behind check valve to the boiler proper, and the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, etc.; (4) Main water supply pipe refers to the main water supply pipe outside the first weld (excluding weld) behind boiler feed pump outlet valve to the boiler proper, and the drain pipe and vent pipe within the first weld (excluding weld) before primary valve, etc.; (5) Blow-down pipe refers to the pipe outside the first weld (excluding weld) of blow-down pipe outlet and within the first weld (excluding weld) before primary valve; (6) Boiler start-up system refers to the steam-water (start-up) separator, storage tank (vessel) and the pressure pipe within the first weld (excluding weld) before altitude valve. 1.3.3 Safety accessories and instruments They refer to such safety accessories as safety valve, pressure measuring device, water (liquid) level measuring, indicating and control device, temperature measuring device, blowdown and discharge device, safety protection devices and relevant instruments, etc. 1.3.4 Combustion equipment and system 1.3.5 Special circumstances Periodical inspection for Class D steam-water multifunctional boiler shall be in accordance with Class B and Class C boilers; periodical inspection for other Class D boilers shall be carried out by the boiler user. 1.4 Basic requirements of periodical inspection 1.4.1 Periodical inspection definition Periodical inspection is the conformity verification for the current state of in-use boiler according to the safety technical regulation. Periodical inspection of boiler includes the external inspection of boiler under operating condition as well as internal inspection and hydraulic (pressure) test of boiler under shutdown condition.
Contents of TSG G7002-2011
1 General Provisions 2 Internal Inspection 3 External Inspection 4 Hydraulic (Pressure) Test 5 Supplementary Provisions Attachment A Report on Conclusion of Periodical Inspection for Class A Boilers Attachment B Report on Conclusion of Periodical Inspection for Classes B and C Boilers
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TSG G7002-2011, TSG/T G7002-2011, TSGT G7002-2011, TSGG7002-2011, TSG G7002, TSGG7002, TSG/TG7002-2011, TSG/T G7002, TSG/TG7002, TSGTG7002-2011, TSGT G7002, TSGTG7002