2025-12-19 216.73.216.41
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
DL/T 592-2010 Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant 100.0 via email in 1 business day superseded,2022-11-13,2010-10-1
JB/T 6806.3-1993 DDZ-S series instruments General technical conditions 220.0 via email in 1~3 business day abolished2017-05-12,,1994-1-1
GB/T 9469.4-1988 Process data highway,type C(PROWAY C), for distributed process control systems-The PROWAY link control (PLC) sublayer 250.0 via email in 1~3 business day abolished2005-10-14,,1989-1-1
GB/T 17165.4-1997 Fuzzy control devices and systems Part 4:Evaluation requirements of basic properties of fuzzy control for washing machine 300.0 via email in 1~5 business day superseded2007-09-29,2006-10-11,1998-1-2
JB/T 6793-1993 Microcomputer Optimum Controller of Melting Process in Cupola via email in business day valid,,1994-1-1
GB/T 9469.3-1988 Process data highway,type C(PROWAY C),for distributed process control systems-The interface to PROWAY 370.0 via email in 1~5 business day abolished2005-10-14,,1989-1-1
GB/T 9469.7-1988 Process data highway,type C (PROWAY C),for distributed process control systems-MAC-physical layer interface specification 130.0 via email in 1~3 business day abolished2005-10-14,,1989-1-1
GB/T 9469.6-1988 Process data highway,type C (PROWAY C),for distributed process control systems-The medium access control (MAC) sublayer 540.0 via email in 1~5 business day abolished2005-10-14,,1989-1-1
JB/T 10566-2006 Fuzzy control devices and systems Part 4: Evaluation requirements of basic properties of fuzzy control for washing machine 330.0 via email in 1~3 business day valid,,2006-10-11
GB/T 9469.2-1988 Process data highway,type C(PROWAY C),for distributed process control systems-Functional requirements 180.0 via email in 1~3 business day abolished2005-10-14 ,,1989-1-1
DL/T 589-2010 Specification of instrumentation and control for coal fired boiler in fossilfuel power plant 120.0 via email in 1 business day superseded,2022-11-13,2010-10-1
GB/T 17165.2-1997 Fuzzy control devices and systems Part 2:General requirements for evaluating performance of fuzzy control unit 130.0 via email in 1~3 business day superseded2009-01-01,2009-1-1,1998-1-2
DL/T 996-2006 Specification of steam turbine electro-hydraulic control system in fossil fuel power plant 390.0 via email in 1~3 business day superseded,2019-10-1,2006-10-1
JB/T 6806.2-1993 DDZ-S Series Instruments Working Signal 60.0 via email in 1~3 business day abolished2017-05-12 ,,1994-1-1
GB/T 9092-1988 Automatic switches for metering and load control 330.0 via email in 1~5 business day superseded1998-10-01,1998-10-1,1989-1-1
Previous Page     Next Page



Code of China
Search

DL/T 592-2010 Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant 
  Issued on: 2010-5-1   Price(USD): 100.0
JB/T 6806.3-1993 DDZ-S series instruments General technical conditions 
  Issued on: 1993-07-09   Price(USD): 220.0
GB/T 9469.4-1988 Process data highway,type C(PROWAY C), for distributed process control systems-The PROWAY link control (PLC) sublayer 
  Issued on: 1988-06-27   Price(USD): 250.0
GB/T 17165.4-1997 Fuzzy control devices and systems Part 4:Evaluation requirements of basic properties of fuzzy control for washing machine 
  Issued on: 1997-01-02   Price(USD): 300.0
JB/T 6793-1993 Microcomputer Optimum Controller of Melting Process in Cupola 
  Issued on: 1993-7-9   Price(USD):
GB/T 9469.3-1988 Process data highway,type C(PROWAY C),for distributed process control systems-The interface to PROWAY 
  Issued on: 1988-06-27   Price(USD): 370.0
GB/T 9469.7-1988 Process data highway,type C (PROWAY C),for distributed process control systems-MAC-physical layer interface specification 
  Issued on: 1988-06-27   Price(USD): 130.0
GB/T 9469.6-1988 Process data highway,type C (PROWAY C),for distributed process control systems-The medium access control (MAC) sublayer 
  Issued on: 1988-06-27   Price(USD): 540.0
JB/T 10566-2006 Fuzzy control devices and systems Part 4: Evaluation requirements of basic properties of fuzzy control for washing machine 
  Issued on: 2006-7-27   Price(USD): 330.0
GB/T 9469.2-1988 Process data highway,type C(PROWAY C),for distributed process control systems-Functional requirements 
  Issued on: 1988-06-27   Price(USD): 180.0
DL/T 589-2010 Specification of instrumentation and control for coal fired boiler in fossilfuel power plant 
  Issued on: 2010-5-24   Price(USD): 120.0
GB/T 17165.2-1997 Fuzzy control devices and systems Part 2:General requirements for evaluating performance of fuzzy control unit 
  Issued on: 1997-01-02   Price(USD): 130.0
DL/T 996-2006 Specification of steam turbine electro-hydraulic control system in fossil fuel power plant 
  Issued on: 2006-5-6   Price(USD): 390.0
JB/T 6806.2-1993 DDZ-S Series Instruments Working Signal 
  Issued on: 1993-7-9   Price(USD): 60.0
GB/T 9092-1988 Automatic switches for metering and load control 
  Issued on: 1988-04-25   Price(USD): 330.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040