2023-9-21 3.236.237.61
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50166-2007
GB 50166-2007   Code for Installation and Acceptance of Fire Alarm System (English Version)
Standard No.: GB 50166-2007 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 17000 words Price(USD):340.0 remind me the price change

Email:

Implemented on:2008-3-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50166-2007
English Name: Code for Installation and Acceptance of Fire Alarm System
Chinese Name: 火灾自动报警系统施工及验收规范
Chinese Classification: P16    Engineering fire protection
Professional Classification: GB    National Standard
Issued by: MOC, AQSIQ
Issued on: 2007-10-23
Implemented on: 2008-3-1
Status: superseded
Superseded by:GB 50166-2019 Code for installation and acceptance of fire alarm system
Superseded on:2020-3-1
Superseding:GB 50166-1992 Code for installation and commissioning of automatic fire alarm system
Language: English
File Format: PDF
Word Count: 17000 words
Price(USD): 340.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to secure the installation quality and function of automatic fire alarm system, to prevent and reduce fire hazard and protect safety of life and property. 1.0. 2 This code is applicable to the automatic fire alarm systems provided in the industrial and civil buildings, but is not applicable to the automatic fire alarm systems provided in locale for production and storage of gunpowder, dynamite, ammunition and initiating explosive devices. 1.0.3 Before the delivery of the automatic fire alarm system, it shall pass the acceptance procedure. 1.0.4 The installation and acceptance of automatic fire alarm systems shall comply with not only the requirements stipulated in this code but also those in the current relevant ones of the nation. 2 Basic Requirements 2. 1 Quality Management 2. 1. 1 The classification of part, subpart and sub-divisional projects shall be done according to the requirements in Appendix A. 2. 1. 2 The installation of automatic fire alarm system must be carried out by the related installation organizations with certain qualification. 2. 1. 3 The installation procedures of automatic fire alarm system shall be done according to the design requirements. The installation site shall be provided with necessary installation standards and sound quality management and inspection system. Related records shall be done according to the requirements given in the Appendix B of this code. 2. 1. 4 The following conditions shall be provided before the installation of automatic fire alarm system. 1 The design organization shall explain clearly the technical requirements to the construction, installation and supervision organizations. 2 The system equipment, materials and fitting parts shall be ready for normal installation. 3 The water, electricity and gas needed for system installation shall meet the need of normal installation. 2. 1. 5 The installation of automatic fire alarm system shall be carried out according to the approved design documents and installation standards without any changes. If it is necessary to change the design, it shall be done by the original design institute. 2. 1. 6 The quality control of the installation of automatic fire alarm system shall meet the following requirements: 1 The quality of different working procedures shall he controlled according to the Installation standard. Inspection shall be done after the completion of each working procedure. The next procedure shall not be started until the previous procedure meets the requirements of related standards. 2 When hand over is done among different types of work, inspection shall be required and the next procedure shall not be started until the project supervisor signs for approval. 3 After the completion of the system Installation, it shall be commissioned by the installation organization according to the related commissioning requirements. 4 After the completion of the commissioning, installation unit shall submit the quality control documents and quality inspection records of all kinds of working procedures to the construction unit. 5 The quality inspection during different working procedures shall be done by personnel from construction unit led by project supervisor. 6 The quality inspection record shall be filled according to the requirements in Appendix C of this code. 2. 1. 7 Quality control doacuments of automatic fire alarm system shall be filled according to the requirements in Appendix D of this code. 2. 1. 8 On-site inspection shall be done for the equipments, materials and fitting parts of the automatic fire alarm system before installation. Unqualified ones shall not be used. 2. 1. 9 Acceptance of the quality of part project shall be done jointly by project leader from installation unit, project supervisor and project leader from design institute led by project leader from construction unit. Acceptance record of the automatic fire alarm system shall be filled according to the requirements in Appendix E of this code. 2. 2 Receiving Acceptance of Equipments and Materials 2. 2. 1 When the equipments, materials and fitting parts enter into the construction site, product list, specifications, quality certificates, testing reports from nationally certified quality supervision and testing organizations shall be provided. Products of automatic fire alarm system that must pass China Compulsory Certification or Approval shall have quality certificate (approval) and certification (approval) mark.
Contents 1 General Provisions 2 Basic Requirements 2. 1 Quality Management 2. 2 Receiving Acceptance of Equipments and Materials 3 System Installation 3. 1 General Requirements 3. 2 Wiring 3. 3 Installation of Controller 3. 4 Installation of Fire Detectors 3. 5 Installation of Manual Fire Alarm Button 3. 6 Installation of Fire Protection Control Equipment 3. 7 Installation of Modules 3. 8 Installation of Emergency Loudspeaker and Fire Alarm Equipment 3.9 Installation of Fire Telephone 3.10 Installation of Emergency Power for Fire Equipment 3.11 System Grounding 4 System Commissioning 4.1 General Requirements 4. 2 Preparation for Commissioning 4. 3 Commissioning of Fire Alarm Controller 4. 4 Commissioning of Point-type Smoke and Heat Fire Detectors 4.5 Commissioning of Line-type Heat Fire Detectors 4. 6 Commissioning of Infra-red Beam Smoke Fire Detectors 4. 7 Commissioning of Aspirating Fire Detectors Sampling through Pipes 4.8 Commissioning of Point-type Flame Detectors and Graphic Fire Detectors 4. 9 Commissioning of Manual Fire Alarm Button 4. 10 Commissioning of Fire Linkage Controller 4. 11 Commissioning of Area Displayer (Fire Display Panel) 4. 12 Commissioning of Flammable Gas Alarm Controller 4. 13 Commissioning of Flammable Gas Detector 4. 14 Commissioning of Fire Telephone 4. 15 Commissioning of Fire Accident Broadcast Equipment 4. 16 Commissioning of System Stand by Power 4. 17 Commissioning of Emergency Power Supply" for Fire Equipment 4.18 Commissioning of Graphic Display Unit in Fire Control Center 4. 19 Commissioning of Gas Fire Extinguishing Controller 4. 20 Commissioning of Fire Roller Shutter Controller 4. 21 Commissioning of Other Control Units 4. 22 Commissioning of Automatic Fire Alarm System 5 System Acceptance 5.1 General Requirements 5.2 Preparation for Acceptance 5. 3 Acceptance 6 System Use and Maintenance 6.1 Preparation before Use 6. 2 Use and Maintenance Appendix A Classification of Part, Subpart and Sub-divisional Projects Appendix B Inspection Record for Quality Management of Installation Site Appendix C Inspection Record for Automatic Fire Appendix D Record for Reviewing Quality Control Documents of Automatic Fire Alarm System Appendix E Record of Project Acceptance of Automatic Fire Alarm System Appendix F Record of Routine Maintenance and Inspection of Automatic Fire Alarm System Explanation of Wording in This Code
GB 50166-2007 is referred in:
* SY 4205-2007 Code for quality acceptance of oil and gas construction engineering automation instrumentation engineering
* GB 50606-2010 Code for installation of Intelligented building system
* GB/T 2887-2011 General specification for computer field
* GB/T 2887-2011 General specification for computer field
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50339-2013 Code for acceptance of quality of Intelligent building systems
* GB 50219-2014 Technical Code for water spray fire protection systems
*CECS 263-2009 Technical specification for large-space intelligent active control sprinkler systems
*GB 50457-2019 Code for design of pharmaceutical industry clean room
Code of China
Standard
GB 50166-2007  Code for Installation and Acceptance of Fire Alarm System (English Version)
Standard No.GB 50166-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count17000 words
Price(USD)340.0
Implemented on2008-3-1
Deliveryvia email in 1 business day
Detail of GB 50166-2007
Standard No.
GB 50166-2007
English Name
Code for Installation and Acceptance of Fire Alarm System
Chinese Name
火灾自动报警系统施工及验收规范
Chinese Classification
P16
Professional Classification
GB
ICS Classification
Issued by
MOC, AQSIQ
Issued on
2007-10-23
Implemented on
2008-3-1
Status
superseded
Superseded by
GB 50166-2019 Code for installation and acceptance of fire alarm system
Superseded on
2020-3-1
Abolished on
Superseding
GB 50166-1992 Code for installation and commissioning of automatic fire alarm system
Language
English
File Format
PDF
Word Count
17000 words
Price(USD)
340.0
Keywords
GB 50166-2007, GB/T 50166-2007, GBT 50166-2007, GB50166-2007, GB 50166, GB50166, GB/T50166-2007, GB/T 50166, GB/T50166, GBT50166-2007, GBT 50166, GBT50166
Introduction of GB 50166-2007
1 General Provisions 1.0.1 This code is formulated with a view to secure the installation quality and function of automatic fire alarm system, to prevent and reduce fire hazard and protect safety of life and property. 1.0. 2 This code is applicable to the automatic fire alarm systems provided in the industrial and civil buildings, but is not applicable to the automatic fire alarm systems provided in locale for production and storage of gunpowder, dynamite, ammunition and initiating explosive devices. 1.0.3 Before the delivery of the automatic fire alarm system, it shall pass the acceptance procedure. 1.0.4 The installation and acceptance of automatic fire alarm systems shall comply with not only the requirements stipulated in this code but also those in the current relevant ones of the nation. 2 Basic Requirements 2. 1 Quality Management 2. 1. 1 The classification of part, subpart and sub-divisional projects shall be done according to the requirements in Appendix A. 2. 1. 2 The installation of automatic fire alarm system must be carried out by the related installation organizations with certain qualification. 2. 1. 3 The installation procedures of automatic fire alarm system shall be done according to the design requirements. The installation site shall be provided with necessary installation standards and sound quality management and inspection system. Related records shall be done according to the requirements given in the Appendix B of this code. 2. 1. 4 The following conditions shall be provided before the installation of automatic fire alarm system. 1 The design organization shall explain clearly the technical requirements to the construction, installation and supervision organizations. 2 The system equipment, materials and fitting parts shall be ready for normal installation. 3 The water, electricity and gas needed for system installation shall meet the need of normal installation. 2. 1. 5 The installation of automatic fire alarm system shall be carried out according to the approved design documents and installation standards without any changes. If it is necessary to change the design, it shall be done by the original design institute. 2. 1. 6 The quality control of the installation of automatic fire alarm system shall meet the following requirements: 1 The quality of different working procedures shall he controlled according to the Installation standard. Inspection shall be done after the completion of each working procedure. The next procedure shall not be started until the previous procedure meets the requirements of related standards. 2 When hand over is done among different types of work, inspection shall be required and the next procedure shall not be started until the project supervisor signs for approval. 3 After the completion of the system Installation, it shall be commissioned by the installation organization according to the related commissioning requirements. 4 After the completion of the commissioning, installation unit shall submit the quality control documents and quality inspection records of all kinds of working procedures to the construction unit. 5 The quality inspection during different working procedures shall be done by personnel from construction unit led by project supervisor. 6 The quality inspection record shall be filled according to the requirements in Appendix C of this code. 2. 1. 7 Quality control doacuments of automatic fire alarm system shall be filled according to the requirements in Appendix D of this code. 2. 1. 8 On-site inspection shall be done for the equipments, materials and fitting parts of the automatic fire alarm system before installation. Unqualified ones shall not be used. 2. 1. 9 Acceptance of the quality of part project shall be done jointly by project leader from installation unit, project supervisor and project leader from design institute led by project leader from construction unit. Acceptance record of the automatic fire alarm system shall be filled according to the requirements in Appendix E of this code. 2. 2 Receiving Acceptance of Equipments and Materials 2. 2. 1 When the equipments, materials and fitting parts enter into the construction site, product list, specifications, quality certificates, testing reports from nationally certified quality supervision and testing organizations shall be provided. Products of automatic fire alarm system that must pass China Compulsory Certification or Approval shall have quality certificate (approval) and certification (approval) mark.
Contents of GB 50166-2007
Contents 1 General Provisions 2 Basic Requirements 2. 1 Quality Management 2. 2 Receiving Acceptance of Equipments and Materials 3 System Installation 3. 1 General Requirements 3. 2 Wiring 3. 3 Installation of Controller 3. 4 Installation of Fire Detectors 3. 5 Installation of Manual Fire Alarm Button 3. 6 Installation of Fire Protection Control Equipment 3. 7 Installation of Modules 3. 8 Installation of Emergency Loudspeaker and Fire Alarm Equipment 3.9 Installation of Fire Telephone 3.10 Installation of Emergency Power for Fire Equipment 3.11 System Grounding 4 System Commissioning 4.1 General Requirements 4. 2 Preparation for Commissioning 4. 3 Commissioning of Fire Alarm Controller 4. 4 Commissioning of Point-type Smoke and Heat Fire Detectors 4.5 Commissioning of Line-type Heat Fire Detectors 4. 6 Commissioning of Infra-red Beam Smoke Fire Detectors 4. 7 Commissioning of Aspirating Fire Detectors Sampling through Pipes 4.8 Commissioning of Point-type Flame Detectors and Graphic Fire Detectors 4. 9 Commissioning of Manual Fire Alarm Button 4. 10 Commissioning of Fire Linkage Controller 4. 11 Commissioning of Area Displayer (Fire Display Panel) 4. 12 Commissioning of Flammable Gas Alarm Controller 4. 13 Commissioning of Flammable Gas Detector 4. 14 Commissioning of Fire Telephone 4. 15 Commissioning of Fire Accident Broadcast Equipment 4. 16 Commissioning of System Stand by Power 4. 17 Commissioning of Emergency Power Supply" for Fire Equipment 4.18 Commissioning of Graphic Display Unit in Fire Control Center 4. 19 Commissioning of Gas Fire Extinguishing Controller 4. 20 Commissioning of Fire Roller Shutter Controller 4. 21 Commissioning of Other Control Units 4. 22 Commissioning of Automatic Fire Alarm System 5 System Acceptance 5.1 General Requirements 5.2 Preparation for Acceptance 5. 3 Acceptance 6 System Use and Maintenance 6.1 Preparation before Use 6. 2 Use and Maintenance Appendix A Classification of Part, Subpart and Sub-divisional Projects Appendix B Inspection Record for Quality Management of Installation Site Appendix C Inspection Record for Automatic Fire Appendix D Record for Reviewing Quality Control Documents of Automatic Fire Alarm System Appendix E Record of Project Acceptance of Automatic Fire Alarm System Appendix F Record of Routine Maintenance and Inspection of Automatic Fire Alarm System Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Foryou Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50166-2007, GB/T 50166-2007, GBT 50166-2007, GB50166-2007, GB 50166, GB50166, GB/T50166-2007, GB/T 50166, GB/T50166, GBT50166-2007, GBT 50166, GBT50166