GB 50462-2008   Code for Construction and Acceptance of Electronic Information System Room (English Version)
Standard No.: GB 50462-2008 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 15000 words Price(USD):370.0 remind me the price change

Email:

Implemented on:2008-6-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50462-2008
English Name: Code for Construction and Acceptance of Electronic Information System Room
Chinese Name: 电子信息系统机房施工及验收规范
Chinese Classification: P33    Residential and public building engineering
Professional Classification: GB    National Standard
Issued by: MOHURD; AQSIQ
Issued on: 2008-11-12
Implemented on: 2008-6-1
Status: superseded
Superseded by:GB 50462-2015 Code for construction and acceptance of data center infrastructure
Superseded on:2016-8-1
Language: English
File Format: PDF
Word Count: 15000 words
Price(USD): 370.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to strengthening the project supervision of all kinds of electronic information system room, unifying the construction and assuring the engineering quality. 1.0.2 This code is applicable to the construction and acceptance inspections of newly-built, reconstructed and extended electronic information system room projects that are under construction. 1.0.3 The construction and acceptance inspection of the electronic information system room not only shall perform the requirements stipulated in this code, but also shall comply with those specified in the current relevant standards and codes of the nation.
1 General provisions 1 2 Terms 2 3 Fundamental provisions 3 3.1 Basic requirements of construction 3 3.2 Basic requirements of materials and equipments 3 3.3 Basic requirements on acceptance inspection of partitioned and subdivisional work constructions 4 4 Power supply and distribution system 5 4.1 General provisions 5 4.2 Electrical devices 5 4.3 Wiring and laying 6 4.4 Illumination devices 7 4.5 Construction acceptance 7 5 Lightning protection and grounding system 9 5.1 General provisions 9 5.2 Lightning protection and grounding device 9 5.3 Grounding conductor 9 5.4 Construction acceptance 10 6 Air-conditioning system 11 6.1 General provisions 11 6.2 Installation of air-conditioning equipments 11 6.3 Installation of other air conditioning equipments 11 6.4 Manufacturing and installation of air pipe and components 12 6.5 Debugging of air-conditioning system 13 6.6 Construction acceptance 13 7 Water supply and drainage system 14 7.1 General provisions 14 7.2 Pipe installation 14 7.3 Construction acceptance 15 8 Integrated wiring 16 8.1 General provisions 16 8.2 Wire cable laying 16 8.3 Construction acceptance 18 9 Monitoring and safety protection 20 9.1 General provisions 20 9.2 Installation of equipments and facilities 20 9.3 Wiring and laying 21 9.4 System debugging 21 9.5 Construction acceptance 23 10 Fire-fighting system 24 11 Indoor fitment and decoration 25 11.1 General provisions 25 11.2 Suspended ceiling 25 11.3 Partition wall 26 11.4 Ground processing 27 11.5 Free access floor 27 11.6 Treatment on inner wall, ceiling and column surface 28 11.7 Door and window and others 29 11.8 Construction acceptance 29 12 Electromagnetic shielding 31 12.1 General provisions 31 12.2 Installation of cases 31 12.3 Installation of shielding door 32 12.4 Installation of filter, cut-off waveguide ventilating window and shielding glass 32 12.5 Self-checking of shield effectiveness 33 12.6 Other construction requirements 33 12.7 Construction acceptance 34 13 Integration testing 35 13.1 General provisions 35 13.2 Temperature and humidity 35 13.3 Air-laden dust concentration 36 13.4 Illumination intensity 36 13.5 Noises 36 13.6 Electromagnetic shielding 36 13.7 Ground resistance 36 13.8 Voltage, frequency and waveform deviation factor of electric power supply 37 13.9 Air volume 37 13.10 Positive pressure 37 14 Acceptance and handover of completion of projects 38 14.1 General provisions 38 14.2 Procedure and content of final acceptance 38 Annex A Data Sheet of the Acceptance Inspection on Power Supply and Distribution System 40 Annex B Data Sheet of Acceptance Inspection on Lightning Protection and Grounding Devices 41 Annex C Data Sheet of Testing on Air-conditioning System 42 Annex D Data Sheet of the Performance Testing on the Engineering Electricity of Cable and Optical Cable Generic Cabling System 44 Annex E Data Sheet of Function Test of Monitoring and Safety Protection System 45 Annex F Data Sheet for Testing of the Shield Effectiveness of Electromagnetic Shielding Enclosure 46 Annex G Engineering Acceptance Table of Electromagnetic Shielding Enclosure 47 Annex H Data Sheet of Integration Testing of Electronic Information System Room 48 Annex J Table of Final Completion Acceptance of Engineering Quality 49 Explanation of Wording in this code 50
GB 50462-2008 is referred in:
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50339-2013 Code for acceptance of quality of Intelligent building systems
* GB 50209-2010 Code for Acceptance of Construction Quality of Building Ground
Code of China
Standard
GB 50462-2008  Code for Construction and Acceptance of Electronic Information System Room (English Version)
Standard No.GB 50462-2008
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)370.0
Implemented on2008-6-1
Deliveryvia email in 1 business day
Detail of GB 50462-2008
Standard No.
GB 50462-2008
English Name
Code for Construction and Acceptance of Electronic Information System Room
Chinese Name
电子信息系统机房施工及验收规范
Chinese Classification
P33
Professional Classification
GB
ICS Classification
Issued by
MOHURD; AQSIQ
Issued on
2008-11-12
Implemented on
2008-6-1
Status
superseded
Superseded by
GB 50462-2015 Code for construction and acceptance of data center infrastructure
Superseded on
2016-8-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
370.0
Keywords
GB 50462-2008, GB/T 50462-2008, GBT 50462-2008, GB50462-2008, GB 50462, GB50462, GB/T50462-2008, GB/T 50462, GB/T50462, GBT50462-2008, GBT 50462, GBT50462
Introduction of GB 50462-2008
1.0.1 This code is formulated with a view to strengthening the project supervision of all kinds of electronic information system room, unifying the construction and assuring the engineering quality. 1.0.2 This code is applicable to the construction and acceptance inspections of newly-built, reconstructed and extended electronic information system room projects that are under construction. 1.0.3 The construction and acceptance inspection of the electronic information system room not only shall perform the requirements stipulated in this code, but also shall comply with those specified in the current relevant standards and codes of the nation.
Contents of GB 50462-2008
1 General provisions 1 2 Terms 2 3 Fundamental provisions 3 3.1 Basic requirements of construction 3 3.2 Basic requirements of materials and equipments 3 3.3 Basic requirements on acceptance inspection of partitioned and subdivisional work constructions 4 4 Power supply and distribution system 5 4.1 General provisions 5 4.2 Electrical devices 5 4.3 Wiring and laying 6 4.4 Illumination devices 7 4.5 Construction acceptance 7 5 Lightning protection and grounding system 9 5.1 General provisions 9 5.2 Lightning protection and grounding device 9 5.3 Grounding conductor 9 5.4 Construction acceptance 10 6 Air-conditioning system 11 6.1 General provisions 11 6.2 Installation of air-conditioning equipments 11 6.3 Installation of other air conditioning equipments 11 6.4 Manufacturing and installation of air pipe and components 12 6.5 Debugging of air-conditioning system 13 6.6 Construction acceptance 13 7 Water supply and drainage system 14 7.1 General provisions 14 7.2 Pipe installation 14 7.3 Construction acceptance 15 8 Integrated wiring 16 8.1 General provisions 16 8.2 Wire cable laying 16 8.3 Construction acceptance 18 9 Monitoring and safety protection 20 9.1 General provisions 20 9.2 Installation of equipments and facilities 20 9.3 Wiring and laying 21 9.4 System debugging 21 9.5 Construction acceptance 23 10 Fire-fighting system 24 11 Indoor fitment and decoration 25 11.1 General provisions 25 11.2 Suspended ceiling 25 11.3 Partition wall 26 11.4 Ground processing 27 11.5 Free access floor 27 11.6 Treatment on inner wall, ceiling and column surface 28 11.7 Door and window and others 29 11.8 Construction acceptance 29 12 Electromagnetic shielding 31 12.1 General provisions 31 12.2 Installation of cases 31 12.3 Installation of shielding door 32 12.4 Installation of filter, cut-off waveguide ventilating window and shielding glass 32 12.5 Self-checking of shield effectiveness 33 12.6 Other construction requirements 33 12.7 Construction acceptance 34 13 Integration testing 35 13.1 General provisions 35 13.2 Temperature and humidity 35 13.3 Air-laden dust concentration 36 13.4 Illumination intensity 36 13.5 Noises 36 13.6 Electromagnetic shielding 36 13.7 Ground resistance 36 13.8 Voltage, frequency and waveform deviation factor of electric power supply 37 13.9 Air volume 37 13.10 Positive pressure 37 14 Acceptance and handover of completion of projects 38 14.1 General provisions 38 14.2 Procedure and content of final acceptance 38 Annex A Data Sheet of the Acceptance Inspection on Power Supply and Distribution System 40 Annex B Data Sheet of Acceptance Inspection on Lightning Protection and Grounding Devices 41 Annex C Data Sheet of Testing on Air-conditioning System 42 Annex D Data Sheet of the Performance Testing on the Engineering Electricity of Cable and Optical Cable Generic Cabling System 44 Annex E Data Sheet of Function Test of Monitoring and Safety Protection System 45 Annex F Data Sheet for Testing of the Shield Effectiveness of Electromagnetic Shielding Enclosure 46 Annex G Engineering Acceptance Table of Electromagnetic Shielding Enclosure 47 Annex H Data Sheet of Integration Testing of Electronic Information System Room 48 Annex J Table of Final Completion Acceptance of Engineering Quality 49 Explanation of Wording in this code 50
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB 50462-2008, GB/T 50462-2008, GBT 50462-2008, GB50462-2008, GB 50462, GB50462, GB/T50462-2008, GB/T 50462, GB/T50462, GBT50462-2008, GBT 50462, GBT50462