2023-3-29 3.239.6.58
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50500-2008
GB 50500-2008   Code of Valuation with Bill Quantity of Construction Works (English Version)
Standard No.: GB 50500-2008 Status:abolished remind me the status change

Email:

Language:English File Format:PDF
Word Count: 100000 words Price(USD):2000.0 remind me the price change

Email:

Implemented on:2008-12-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50500-2008
English Name: Code of Valuation with Bill Quantity of Construction Works
Chinese Name: 建设工程工程量清单计价规范
Chinese Classification: P02    Economic management
Professional Classification: GB    National Standard
ICS Classification: 91.010.01 91.010.01    Construction industry in general 91.010.01
Issued by: AQSIQ, MOHURD
Issued on: 2008-07-09
Implemented on: 2008-12-1
Status: abolished
Superseded by:GB 50500-2013 Code of Bills of Quantities and Valuation for Construction Works
Superseded on:2013-7-1
Abolished on:2013-07-01
Superseding:GB 50500-2003 Code of valuation with bill quantity of construction works
Language: English
File Format: PDF
Word Count: 100000 words
Price(USD): 2000.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to specify the engineering cost valuation behavior, unify the compilation and valuation method of bill of quantity of construction works, according to laws and regulations of "Building Law of the People's Republic of China", "Contract Law of the People's Republic of China" and "Law of the People's Republic of China on Bid Invitation and Bidding". 1.0.2 This Code is applicable to valuation activities with bill quantity of construction work. 1.0.3 All user-state includes the capital investment or state-owned capital investment based (hereinafter referred to as "state-owned capital investment" for both) construction project, which must adopt valuation with bill of quantity. 1.0.4 Non-state-owned capital invested construction projects can adopt the valuation with bill of quantity. 1.0.5 Bill of quantity (BOQ), bidding control prices, bids, engineering payment settlement and other engineering cost document preparation or check shall be assumed by qualified engineering cost professionals. 1.0.6 The valuation activities with bill of quantity of the construction works shall follow the objective, just and fair principles. 1.0.7 Annex A, Annex B, Annex C, Annex D, Annex E and Annex F of this Code shall be used as the basis for the preparation of BOQ. 1 Annex A, the BOQ items and computational rules of the construction works, is applicable to industrial and civil buildings and structures engineering. 2 Annex B, the BOQ items and computational rules of the decorating projects, is applicable to industrial and civil building and structures decorating projects. 3 Annex C, the BOQ items and computational rules of the installation works, is applicable to industrial and civil building installation works. 4 Annex D, the BOQ items and computational rules of municipal works, is applicable to urban municipal construction works. 5 Annex E, the BOQ items and computational rules of landscaping works, is applicable to landscaping works. 6 Annex F, the BOQ item and computational rules of mine engineering, is applicable to mine engineering. 1.0.8 The valuation activities with BOQ of construction works shall not only comply with this Code, but also those in the current relevant ones of the nation shall be complied with.
Contents 1. General Provisions 2. Terms 3. BOQ Preparation 3.1 General Provisions 3.2 BOQ of Partial Works 3.3 Measures Project List 3.4 Other Project List 3.5 Stipulated Fees Project List 3.6 Tax Project List 4. BOQ Valuation 4.1 General Rules 4.2 Bidding Control Price 4.3 Competitive Price 4.4 Agreement of Engineering Contracting Payment 4.5 Engineering Measurement and Payment 4.6 Claim and On-site Authentication 4.7 Engineering Payment Adjustment 4.8 Completion settlement 4.9 Treatment of Engineering Valuation Disputes 5. BOQ Valuation Form 5.1 Composition of Valuation Form 5.2 Terms for the Use of Valuation Table Annex A Items and Calculation Rules of BOQ of Construction Works I Entity items A.1 Earth (stone) work A.2 The foundation engineering of pile and foundation A.3 Brick Work A.4 The concrete and reinforced concrete works A.5 The gate, special door and wood structure engineering of the plant storeroom A.6 Metallic structure works A.7 Roof and waterproofing work A.8 Antisepsis, heat insulation and incubation work II Measure project Annex B Bill of Quantity and Computation Rules of Ornament and Decoration Works I Entity items B1 Floor Surface Works B2 Wall and Column Project B3 Ceiling Project B4 Windows and Doors Project B5 Paint, Coating and Paste Project B.6 Other Projects II. Measures Project names Annex C Installation BOQ Items and Computational Rules I. Physical Projects C.1 Mechanical Equipment Installation C.2 Electrical Equipment Installation Project C.3 Heating Equipment Installation Project C.4 Kiln Masonry Works C.5 Fabrication and Installation Works of Standing Equipment and Technological Metal Structure C.6 Industry Pipework C.7 Fire Protection Engineering C.8 Project of Water Supply and Drainage, Heating and Fuel Gas C.9 Air Conditioning and Ventilation Engineering C.10 installation works of Automation Control Instruments C.11 Installation of Communication Equipment and line C.12 Installation of built intellectualized system facility C.13 Long-distance Pipeline Transportation Project II. Measure Project Annex D BOQ project and computation rules for municipal works I. Entity project D.1 Earth and rock project D.2 Road project D.3 Bank protection works of bridges and culverts D.4 Tunnel project D.5 Municipal pipe network project D.6 Subway project D.7 Reinforcing works D.8 Dismantlement project II Measure items Annex E BOQ project and computation rules for landscaping project E.1 Landscape project E.2 Park Road, Part Bridge and Rockery Works E.3 Gardens Landscape Engineering Annex F Bill Quantity and Computational Rules of Mine Engineering I. Physical Projects F.1 Outdoor Projects F.2 Mine Shaft Engineering II. Measure Items Explanation of Wording in this Code
Code of China
Standard
GB 50500-2008  Code of Valuation with Bill Quantity of Construction Works (English Version)
Standard No.GB 50500-2008
Statusabolished
LanguageEnglish
File FormatPDF
Word Count100000 words
Price(USD)2000.0
Implemented on2008-12-1
Deliveryvia email in 1 business day
Detail of GB 50500-2008
Standard No.
GB 50500-2008
English Name
Code of Valuation with Bill Quantity of Construction Works
Chinese Name
建设工程工程量清单计价规范
Chinese Classification
P02
Professional Classification
GB
ICS Classification
Issued by
AQSIQ, MOHURD
Issued on
2008-07-09
Implemented on
2008-12-1
Status
abolished
Superseded by
GB 50500-2013 Code of Bills of Quantities and Valuation for Construction Works
Superseded on
2013-7-1
Abolished on
2013-07-01
Superseding
GB 50500-2003 Code of valuation with bill quantity of construction works
Language
English
File Format
PDF
Word Count
100000 words
Price(USD)
2000.0
Keywords
GB 50500-2008, GB/T 50500-2008, GBT 50500-2008, GB50500-2008, GB 50500, GB50500, GB/T50500-2008, GB/T 50500, GB/T50500, GBT50500-2008, GBT 50500, GBT50500
Introduction of GB 50500-2008
1.0.1 This code is formulated with a view to specify the engineering cost valuation behavior, unify the compilation and valuation method of bill of quantity of construction works, according to laws and regulations of "Building Law of the People's Republic of China", "Contract Law of the People's Republic of China" and "Law of the People's Republic of China on Bid Invitation and Bidding". 1.0.2 This Code is applicable to valuation activities with bill quantity of construction work. 1.0.3 All user-state includes the capital investment or state-owned capital investment based (hereinafter referred to as "state-owned capital investment" for both) construction project, which must adopt valuation with bill of quantity. 1.0.4 Non-state-owned capital invested construction projects can adopt the valuation with bill of quantity. 1.0.5 Bill of quantity (BOQ), bidding control prices, bids, engineering payment settlement and other engineering cost document preparation or check shall be assumed by qualified engineering cost professionals. 1.0.6 The valuation activities with bill of quantity of the construction works shall follow the objective, just and fair principles. 1.0.7 Annex A, Annex B, Annex C, Annex D, Annex E and Annex F of this Code shall be used as the basis for the preparation of BOQ. 1 Annex A, the BOQ items and computational rules of the construction works, is applicable to industrial and civil buildings and structures engineering. 2 Annex B, the BOQ items and computational rules of the decorating projects, is applicable to industrial and civil building and structures decorating projects. 3 Annex C, the BOQ items and computational rules of the installation works, is applicable to industrial and civil building installation works. 4 Annex D, the BOQ items and computational rules of municipal works, is applicable to urban municipal construction works. 5 Annex E, the BOQ items and computational rules of landscaping works, is applicable to landscaping works. 6 Annex F, the BOQ item and computational rules of mine engineering, is applicable to mine engineering. 1.0.8 The valuation activities with BOQ of construction works shall not only comply with this Code, but also those in the current relevant ones of the nation shall be complied with.
Contents of GB 50500-2008
Contents 1. General Provisions 2. Terms 3. BOQ Preparation 3.1 General Provisions 3.2 BOQ of Partial Works 3.3 Measures Project List 3.4 Other Project List 3.5 Stipulated Fees Project List 3.6 Tax Project List 4. BOQ Valuation 4.1 General Rules 4.2 Bidding Control Price 4.3 Competitive Price 4.4 Agreement of Engineering Contracting Payment 4.5 Engineering Measurement and Payment 4.6 Claim and On-site Authentication 4.7 Engineering Payment Adjustment 4.8 Completion settlement 4.9 Treatment of Engineering Valuation Disputes 5. BOQ Valuation Form 5.1 Composition of Valuation Form 5.2 Terms for the Use of Valuation Table Annex A Items and Calculation Rules of BOQ of Construction Works I Entity items A.1 Earth (stone) work A.2 The foundation engineering of pile and foundation A.3 Brick Work A.4 The concrete and reinforced concrete works A.5 The gate, special door and wood structure engineering of the plant storeroom A.6 Metallic structure works A.7 Roof and waterproofing work A.8 Antisepsis, heat insulation and incubation work II Measure project Annex B Bill of Quantity and Computation Rules of Ornament and Decoration Works I Entity items B1 Floor Surface Works B2 Wall and Column Project B3 Ceiling Project B4 Windows and Doors Project B5 Paint, Coating and Paste Project B.6 Other Projects II. Measures Project names Annex C Installation BOQ Items and Computational Rules I. Physical Projects C.1 Mechanical Equipment Installation C.2 Electrical Equipment Installation Project C.3 Heating Equipment Installation Project C.4 Kiln Masonry Works C.5 Fabrication and Installation Works of Standing Equipment and Technological Metal Structure C.6 Industry Pipework C.7 Fire Protection Engineering C.8 Project of Water Supply and Drainage, Heating and Fuel Gas C.9 Air Conditioning and Ventilation Engineering C.10 installation works of Automation Control Instruments C.11 Installation of Communication Equipment and line C.12 Installation of built intellectualized system facility C.13 Long-distance Pipeline Transportation Project II. Measure Project Annex D BOQ project and computation rules for municipal works I. Entity project D.1 Earth and rock project D.2 Road project D.3 Bank protection works of bridges and culverts D.4 Tunnel project D.5 Municipal pipe network project D.6 Subway project D.7 Reinforcing works D.8 Dismantlement project II Measure items Annex E BOQ project and computation rules for landscaping project E.1 Landscape project E.2 Park Road, Part Bridge and Rockery Works E.3 Gardens Landscape Engineering Annex F Bill Quantity and Computational Rules of Mine Engineering I. Physical Projects F.1 Outdoor Projects F.2 Mine Shaft Engineering II. Measure Items Explanation of Wording in this Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Foryou Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50500-2008, GB/T 50500-2008, GBT 50500-2008, GB50500-2008, GB 50500, GB50500, GB/T50500-2008, GB/T 50500, GB/T50500, GBT50500-2008, GBT 50500, GBT50500