2025-5-21 18.97.9.169
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/NB/T 20010.11-2010
NB/T 20010.11-2010   PWR Nuclear Power Plant Valve - Part 11: Electric Actuator (English Version)
Standard No.: NB/T 20010.11-2010 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 8000 words Price(USD):160.0 remind me the price change

Email:

Implemented on:2010-10-1 Delivery: via email in 1 business day
,,
Standard No.: NB/T 20010.11-2010
English Name: PWR Nuclear Power Plant Valve - Part 11: Electric Actuator
Chinese Name: 压水堆核电厂阀门 第11部分:电动装置
Professional Classification: NB    Professional Standard - Energy
Issued by: National Energy Administration
Issued on: 2010-5-1
Implemented on: 2010-10-1
Status: valid
Superseding:EJ/T 1022.11-1996 PWR nuclear power plant valve-Part 11: Electric actuator
Language: English
File Format: PDF
Word Count: 8000 words
Price(USD): 160.0
Delivery: via email in 1 business day
NB/T 2010 consists of 15 parts under the general title of PWR Nuclear Power Plant Valve: ——Part 1: General Standard for Design and Manufacture; ——Part 2: Specification of Carbon Steel Casting; ——Part 3: Specification of Stainless Steel Casting; ——Part 4: Specification of Carbon Steel Forgings; ——Part 5: Specification of Austenitic Stainless Steel Forging; ——Part 6: Specification for Fastener; ——Part 7: Packaging, Transportation and Storage; ——Part 8: Specification of Installation and Maintenance; ——Part 9: Final Examination and Test in Manufactory; ——Part 10: Stress Analysis and Seismic Analysis; ——Part 11: Electric Actuator; ——Part 12: Pneumatic Actuator; ——Part 13: Specification of Non-classified Valve for Nuclear Device; ——Part 14: Specification of Flexible Graphite Packing; ——Part 15: Specification of Spiral Wound Gasket with Flexible Graphite. This is Part 11 of NB/T 2010.
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirements 5 Performance Requirements 6 Test Methods 7 Inspection Rules 8 Marking, Packaging, Transportation and Storage 9 Quality Guarantee
Referred in NB/T 20010.11-2010:
* WS/T 211-2015
* This part-
* This part-
* Q/GDW 232.32-2008 Sepcification for professional ability training of SGCC skilled personnel in production - Part 32: Power communication
* The following-
* GB/T 3797-2005 Electrical control assemblies
* GB 4208-2008 Degrees of Protection Provided By Enclosure (IP Code)
* GB/T 12222-2005 Multi-turn valve actuator attachments
* GB/T 12223-2005 Part-turn valve actuator attachments
* GB/T 13306-2011 Plate
* EJ/T 531-2001 Qualification of actuators for power--operated valve assemblies with safety--related functions for nuclear power plants
* JB/T 2195-2011 Specification for YDF2 series three-phase induction motor applying to electromotion device of valve
* JB/T 8862-2014
* HAF 003-1991 Nuclear power plant safety requirements for quality assurance
* YS/T 1093-2015
* For the-
* 机械工业出版社JB/T 6383.1-1992
* Nominal torque/thrust-
* Nominal torque/thrust-
* ZB/T J52013.2-1990
* Stall torque-
* Output torque-
NB/T 20010.11-2010 is referred in:
* NB/T 20010.1-2010 PWR Nuclear Power Plant Valve - Part 1: General Standard for Design and Manufacture
Code of China
Standard
NB/T 20010.11-2010  PWR Nuclear Power Plant Valve - Part 11: Electric Actuator (English Version)
Standard No.NB/T 20010.11-2010
Statusvalid
LanguageEnglish
File FormatPDF
Word Count8000 words
Price(USD)160.0
Implemented on2010-10-1
Deliveryvia email in 1 business day
Detail of NB/T 20010.11-2010
Standard No.
NB/T 20010.11-2010
English Name
PWR Nuclear Power Plant Valve - Part 11: Electric Actuator
Chinese Name
压水堆核电厂阀门 第11部分:电动装置
Chinese Classification
Professional Classification
NB
ICS Classification
Issued by
National Energy Administration
Issued on
2010-5-1
Implemented on
2010-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
EJ/T 1022.11-1996 PWR nuclear power plant valve-Part 11: Electric actuator
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
160.0
Keywords
NB/T 20010.11-2010, NB 20010.11-2010, NBT 20010.11-2010, NB/T20010.11-2010, NB/T 20010.11, NB/T20010.11, NB20010.11-2010, NB 20010.11, NB20010.11, NBT20010.11-2010, NBT 20010.11, NBT20010.11
Introduction of NB/T 20010.11-2010
NB/T 2010 consists of 15 parts under the general title of PWR Nuclear Power Plant Valve: ——Part 1: General Standard for Design and Manufacture; ——Part 2: Specification of Carbon Steel Casting; ——Part 3: Specification of Stainless Steel Casting; ——Part 4: Specification of Carbon Steel Forgings; ——Part 5: Specification of Austenitic Stainless Steel Forging; ——Part 6: Specification for Fastener; ——Part 7: Packaging, Transportation and Storage; ——Part 8: Specification of Installation and Maintenance; ——Part 9: Final Examination and Test in Manufactory; ——Part 10: Stress Analysis and Seismic Analysis; ——Part 11: Electric Actuator; ——Part 12: Pneumatic Actuator; ——Part 13: Specification of Non-classified Valve for Nuclear Device; ——Part 14: Specification of Flexible Graphite Packing; ——Part 15: Specification of Spiral Wound Gasket with Flexible Graphite. This is Part 11 of NB/T 2010.
Contents of NB/T 20010.11-2010
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirements 5 Performance Requirements 6 Test Methods 7 Inspection Rules 8 Marking, Packaging, Transportation and Storage 9 Quality Guarantee
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
NB/T 20010.11-2010, NB 20010.11-2010, NBT 20010.11-2010, NB/T20010.11-2010, NB/T 20010.11, NB/T20010.11, NB20010.11-2010, NB 20010.11, NB20010.11, NBT20010.11-2010, NBT 20010.11, NBT20010.11