1.0.1 This Specification is formulated in order to carry out the guideline of "safety first; prevention first" to secure the safety and health of the laborers at their work in petrochemical enterprises and to promote the development of petrochemical industry.
1.0.2 The Specification applies to the designs of new construction, expansion construction, and reconstruction of petrochemical enterprise.
1.0.3 The design of a main construction proper must be accompanied concurrently with the design of facilities of occupational safety and health.
1.0.4 The preliminary design document of the construction project must have a chapter dedicated to the occupational safety and health, whose contents shall meet the requirements Stipulated in the Regulations on the Contents of the Preliminary Design of Petrochemical Plant of China Petrochemical General Corporation.
1.0.5 The plan of the preliminary design on the occupational safety and health approved by the authorities shall be thoroughly implemented in the construction drawings. In case any principled amendment is needed; it shall apply to the original authorities for approval.
1.0.6 The relevant current standards and regulations of the State shall be abided by during the implementation of the Specification.
1. General Principles
2. Common Rules
2.1 Ordinary Regulations
2.2 Prevention of Fire and Explosion
2.3 Prevention of Lightning and Static Electricity
2.4 Prevention of Corrosion
2.5 Prevention of Falling and Skidding
2.6 Safety Color and Mark
2.7 Prevention of Dust and Toxic Substances
2.8 Sanitary Facilities
2.9 Protection of Radiation
2.10 Prevention of High Temperature, Cold and Humidity
2.11 Lighting Naturally and Artificially
2.12 Control of Noise and Vibration
3. Selection of Factory Site and Overall Layout
3.1 Selection of Factory Site
3. 2 Overall Layout
4. Petroleum Refining installation
4.1 Catalytic Creaking-g and Fragmentation
4.2 Delayed Coking
4.3 Catalytic Reforming, Hydrogen ation, and Hydrogen Production
4.4 Hydrofluoric Acid Alkylation’s
4.5 Sulfuric Acid Alkylation
4.6 Oxidized Asphalt
4.7 Sulfur Production and Its Tail Gas Treatment
4.8 Solvent Dew axing
4.9 Furfural and Phenol Refining
5. Chemical Engineering Installation
5.1 Olefins (Olefin Cracking)
5.2 Butadiene
5.3 Ethylene Oxide and Ethylene Glycol (Ethylene Oxidation Method)
5.4 Propylene Oxide and Propylene Glycol (Chlorohydrination)
5.5 Acetaldehyde (One Step Oxidation)
5.7 Phenol and Acetone (Iso-Propylbenzene Process)
5.8 Vinyl Chloride
5.9 Styrene
5.10 Detergent Alkyl benzenes (Hydrogen Fluoride Alkylation}
5.11 Epichlorohydrin and Glycerol
5.12 Phthalic Anhydride (o-Xylene Oxidation Process)
5.14 Dioleffin Polymerization (c/s-Butadiene Rubber, Butadiene-Styrene Rubber, Butadiene-Acrylonitrile Rubber, and Ethylene-Propylene Rubber)
5.15 Acrylonitrile and Acetone Cyanohydrin
5.16. Polyvinyl Alcohol (Ethylene Process)
5.17 Pure Terephthalic Acid (High Temperature Oxidation Process of p-Xylene)
5.18 Dimethyl Terephthalate (Combined Oxidation, Combined Esterification)
5.19 Polyester
5.20 Nylon 66 Salt
5.21 Butyl and Octyl Alcohols (Propylene Carbonyl Synthesis)
6. Chemical Fiber Installations
6.1 Acrylontrile Fiber
6.2 PVA Fibers
7. Fertilizer Installations
7.1 Synthetic Ammonia
7.2 Urea
8. Utilities
8.1 Transportation and storage
8.2 Boiler Room
8.3 Power Supply
8.4 Telecommunication
8.5 Polluted Water
8.6 Maintenance and Repair of Mechanical Equipment, Instrument, and Electrical Equipment
8.7 Fire Control
9. Organizations of Occupational Safety and Hygiene
10. Capital Investment for Occupational Safety and Hygiene
Appendix A List of Common Relevant Standards and Specifications
Appendix B: Wording Explanations
SH 3047-1993, SH/T 3047-1993, SHT 3047-1993, SH3047-1993, SH 3047, SH3047, SH/T3047-1993, SH/T 3047, SH/T3047, SHT3047-1993, SHT 3047, SHT3047
Introduction of SH 3047-1993
1.0.1 This Specification is formulated in order to carry out the guideline of "safety first; prevention first" to secure the safety and health of the laborers at their work in petrochemical enterprises and to promote the development of petrochemical industry.
1.0.2 The Specification applies to the designs of new construction, expansion construction, and reconstruction of petrochemical enterprise.
1.0.3 The design of a main construction proper must be accompanied concurrently with the design of facilities of occupational safety and health.
1.0.4 The preliminary design document of the construction project must have a chapter dedicated to the occupational safety and health, whose contents shall meet the requirements Stipulated in the Regulations on the Contents of the Preliminary Design of Petrochemical Plant of China Petrochemical General Corporation.
1.0.5 The plan of the preliminary design on the occupational safety and health approved by the authorities shall be thoroughly implemented in the construction drawings. In case any principled amendment is needed; it shall apply to the original authorities for approval.
1.0.6 The relevant current standards and regulations of the State shall be abided by during the implementation of the Specification.
Contents of SH 3047-1993
1. General Principles
2. Common Rules
2.1 Ordinary Regulations
2.2 Prevention of Fire and Explosion
2.3 Prevention of Lightning and Static Electricity
2.4 Prevention of Corrosion
2.5 Prevention of Falling and Skidding
2.6 Safety Color and Mark
2.7 Prevention of Dust and Toxic Substances
2.8 Sanitary Facilities
2.9 Protection of Radiation
2.10 Prevention of High Temperature, Cold and Humidity
2.11 Lighting Naturally and Artificially
2.12 Control of Noise and Vibration
3. Selection of Factory Site and Overall Layout
3.1 Selection of Factory Site
3. 2 Overall Layout
4. Petroleum Refining installation
4.1 Catalytic Creaking-g and Fragmentation
4.2 Delayed Coking
4.3 Catalytic Reforming, Hydrogen ation, and Hydrogen Production
4.4 Hydrofluoric Acid Alkylation’s
4.5 Sulfuric Acid Alkylation
4.6 Oxidized Asphalt
4.7 Sulfur Production and Its Tail Gas Treatment
4.8 Solvent Dew axing
4.9 Furfural and Phenol Refining
5. Chemical Engineering Installation
5.1 Olefins (Olefin Cracking)
5.2 Butadiene
5.3 Ethylene Oxide and Ethylene Glycol (Ethylene Oxidation Method)
5.4 Propylene Oxide and Propylene Glycol (Chlorohydrination)
5.5 Acetaldehyde (One Step Oxidation)
5.7 Phenol and Acetone (Iso-Propylbenzene Process)
5.8 Vinyl Chloride
5.9 Styrene
5.10 Detergent Alkyl benzenes (Hydrogen Fluoride Alkylation}
5.11 Epichlorohydrin and Glycerol
5.12 Phthalic Anhydride (o-Xylene Oxidation Process)
5.14 Dioleffin Polymerization (c/s-Butadiene Rubber, Butadiene-Styrene Rubber, Butadiene-Acrylonitrile Rubber, and Ethylene-Propylene Rubber)
5.15 Acrylonitrile and Acetone Cyanohydrin
5.16. Polyvinyl Alcohol (Ethylene Process)
5.17 Pure Terephthalic Acid (High Temperature Oxidation Process of p-Xylene)
5.18 Dimethyl Terephthalate (Combined Oxidation, Combined Esterification)
5.19 Polyester
5.20 Nylon 66 Salt
5.21 Butyl and Octyl Alcohols (Propylene Carbonyl Synthesis)
6. Chemical Fiber Installations
6.1 Acrylontrile Fiber
6.2 PVA Fibers
7. Fertilizer Installations
7.1 Synthetic Ammonia
7.2 Urea
8. Utilities
8.1 Transportation and storage
8.2 Boiler Room
8.3 Power Supply
8.4 Telecommunication
8.5 Polluted Water
8.6 Maintenance and Repair of Mechanical Equipment, Instrument, and Electrical Equipment
8.7 Fire Control
9. Organizations of Occupational Safety and Hygiene
10. Capital Investment for Occupational Safety and Hygiene
Appendix A List of Common Relevant Standards and Specifications
Appendix B: Wording Explanations