2025-6-24 18.97.9.169
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SH/T 3904-2014
SH/T 3904-2014   Regulation for acceptance of completed construction projects in petrochemical industry (English Version)
Standard No.: SH/T 3904-2014 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 26000 words Price(USD):1399.0 remind me the price change

Email:

Implemented on:2015-6-1 Delivery: via email in 1 business day
,,
Standard No.: SH/T 3904-2014
English Name: Regulation for acceptance of completed construction projects in petrochemical industry
Chinese Name: 石油化工建设工程项目竣工验收规定
Chinese Classification: P72    Petrochemical and chemical industry engineering
Professional Classification: SH    Professional Standard - Petrochemical
Issued by: MIIT
Issued on: 2014-12-24
Implemented on: 2015-6-1
Status: valid
Superseding:SH/T 3904-2005 Regulation for acceptance of completed construction projects in petrochemical industry
Language: English
File Format: PDF
Word Count: 26000 words
Price(USD): 1399.0
Delivery: via email in 1 business day
1 Scope This regulation stipulates the procedures of completion acceptance in petrochemical industry (hereinafter referred to as construction projects), the implementation of completion acceptance and the requirements of acceptance documents. This regulation is applicable to the acceptance of completed construction projects such as construction, renovation, expansion and technical transformation. 2 Normative references The following documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 50328 Code for construction project document filing and arrangement GB/T 18894 Standards of electronic records filing and management CJJ/T 117 Code for management of electronic construction records and archives DA/T 28 Requirements for filing of records and archival arrangement of national construction of key project SH/T 3503 Regulation of technical document for construction completion of petrochemical industry project SH/T 3903 Project supervision specification on petrochemical construction work Provisions for fire protection supervision and inspection (Decree No.106 of the Ministry of Public Security of the People's Republic of China) Provisions for design review and completion acceptance of lightning protection devices (Decree No. 21 of the China Meteorological Administration, 2011) Measures for safety supervision and administration of hazardous chemical construction projects (Decree No. 45 of the State Administration of work Safety) Measures for the administration of environmental protection acceptance of completed construction projects (Decree No.13 of the Ministry of Ecology and Environment of the People's Republic of China) Interim measures for the supervision and administration of “three simultaneities” for occupational health in construction projects (Decree No.51 of the State Administration of Work Safety)   Provisions for supervision and administration of occupational health in the workplace (Decree No. 47 of the State Administration of Work Safety) Interim measures for the supervision and administration of “three simultaneities” for safety facilities in construction projects (Decree No. 36 of the State Administration of Work Safety) Accounting standard for business enterprises (CAIKUAI [2006] No.3) Measures for archives acceptance of construction project (GUODANGFA [1992] No.8) Measures for archives acceptance of major construction project archives (DANGFA [2006] No.2) 3 Terms and definitions For the purpose of this regulation, the following terms and definitions as well as those given in GB/T 50328 apply. 3.1 unit of project project that has independent design documents, can be organized to construct independently, and can exert its production capacity or project benefits after completion in the construction project 3.2 subunit of project project that has independent design documents and can be organized to construct independently, but cannot independently exert its production capacity or project benefits after completion 3.3 commissioning production process with the production equipment of the construction project is based on the medium specified in the design documents, aiming at producing the products specified in the design documents 3.4 test run production process from commissioning to completion acceptance or obtaining production licensing   3.5 inspection and acceptance of project to be handed over acceptance of delivered project by the supervisor, project contractor and relevant units organized by the development organization according to the provisions of the project contract after the construction project has produced qualified products through commissioning, or has the conditions for use 3.6 specific inspection and acceptance acceptance of fire protection, lightning protection, occupational health, safety, environmental protection and other facilities and their implementation effects of the construction project by the competent administrative department of the government. 3.7 performance guarantee test activities of measuring and collecting data such as the designed production capacity, process indicators, product quality, equipment performance, automatic control level, consumption indicators and environmental protection indicators, and comparing, analyzing and evaluating them with the design value through the continuous operation within the specified period in the test run of petrochemical production devices 3.8 completion settlement final project fund settlement between the contractor and construction organization after the contractor completes the contracted project in accordance with the contract and has passed the acceptance, . 3.9 final accounting on project completion process by which the development organization compiles documents that comprehensively reflect all the construction costs, construction results and financial conditions of the completed project from the start of preparation to the delivery of the project and finally form the final accounts report, taking the quantity of physical objects and monetary indicators as the unit of measurement, in accordance with the relevant provisions of the state, and after the handover acceptance 3.10 final accounting audit on project completion audit and supervision of the authenticity, legality and efficiency of the final accounting on project completion and the project construction by the audit department during the acceptance of completed construction projects   3.11 inspection for acceptance of completed project process of completing the handover acceptance, specific inspection and acceptance, performance guarantee test, final accounting audit on project completion, archives acceptance of construction project, project acceptance conducted by relevant organizations and departments of the project organized by the project approval department or its authorized organization, passing the acceptance and signing the "Certificate for completion acceptance"
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 General 5 Procedures and requirements of completion acceptance 5.1 Procedures of completion acceptance 5.2 Handover acceptance 5.3 Specific inspection and acceptance 5.4 Performance guarantee test 5.5 Final accounting audit on project completion 5.6 Archives acceptance 6 Completion acceptance 6.1 Conditions for completion acceptance 6.2 Organization for completion acceptance 7 Documents of completion acceptance 7.1 Report for completion acceptance 7.2 Certificate for completion acceptance Annex A (Normative) Performance guarantee test for petrochemical plant Annex B (Informative) Written content and format of the report for completion acceptance Annex C (Informative) Content and format of certificate for the completion acceptance Explanation of wording in this regulation
Referred in SH/T 3904-2014:
*GB/T 50328-2014 Code for putting construction project documents into records
*GB/T 18894-2016 Standards of electronic records filing and management
*CJJ/T 117-2017
*DA/T 28-2018 Specification for archival management of construction projects
*SH/T 3503-2017 Specification on handover technical docuentation for petrochemical construction projects
*SH/T 3903-2017 The supervision specification in petrochemical! construction project
SH/T 3904-2014 is referred in:
*SH/T 3503-2017 Specification on handover technical docuentation for petrochemical construction projects
Code of China
Standard
SH/T 3904-2014  Regulation for acceptance of completed construction projects in petrochemical industry (English Version)
Standard No.SH/T 3904-2014
Statusvalid
LanguageEnglish
File FormatPDF
Word Count26000 words
Price(USD)1399.0
Implemented on2015-6-1
Deliveryvia email in 1 business day
Detail of SH/T 3904-2014
Standard No.
SH/T 3904-2014
English Name
Regulation for acceptance of completed construction projects in petrochemical industry
Chinese Name
石油化工建设工程项目竣工验收规定
Chinese Classification
P72
Professional Classification
SH
ICS Classification
Issued by
MIIT
Issued on
2014-12-24
Implemented on
2015-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SH/T 3904-2005 Regulation for acceptance of completed construction projects in petrochemical industry
Language
English
File Format
PDF
Word Count
26000 words
Price(USD)
1399.0
Keywords
SH/T 3904-2014, SH 3904-2014, SHT 3904-2014, SH/T3904-2014, SH/T 3904, SH/T3904, SH3904-2014, SH 3904, SH3904, SHT3904-2014, SHT 3904, SHT3904
Introduction of SH/T 3904-2014
1 Scope This regulation stipulates the procedures of completion acceptance in petrochemical industry (hereinafter referred to as construction projects), the implementation of completion acceptance and the requirements of acceptance documents. This regulation is applicable to the acceptance of completed construction projects such as construction, renovation, expansion and technical transformation. 2 Normative references The following documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 50328 Code for construction project document filing and arrangement GB/T 18894 Standards of electronic records filing and management CJJ/T 117 Code for management of electronic construction records and archives DA/T 28 Requirements for filing of records and archival arrangement of national construction of key project SH/T 3503 Regulation of technical document for construction completion of petrochemical industry project SH/T 3903 Project supervision specification on petrochemical construction work Provisions for fire protection supervision and inspection (Decree No.106 of the Ministry of Public Security of the People's Republic of China) Provisions for design review and completion acceptance of lightning protection devices (Decree No. 21 of the China Meteorological Administration, 2011) Measures for safety supervision and administration of hazardous chemical construction projects (Decree No. 45 of the State Administration of work Safety) Measures for the administration of environmental protection acceptance of completed construction projects (Decree No.13 of the Ministry of Ecology and Environment of the People's Republic of China) Interim measures for the supervision and administration of “three simultaneities” for occupational health in construction projects (Decree No.51 of the State Administration of Work Safety)   Provisions for supervision and administration of occupational health in the workplace (Decree No. 47 of the State Administration of Work Safety) Interim measures for the supervision and administration of “three simultaneities” for safety facilities in construction projects (Decree No. 36 of the State Administration of Work Safety) Accounting standard for business enterprises (CAIKUAI [2006] No.3) Measures for archives acceptance of construction project (GUODANGFA [1992] No.8) Measures for archives acceptance of major construction project archives (DANGFA [2006] No.2) 3 Terms and definitions For the purpose of this regulation, the following terms and definitions as well as those given in GB/T 50328 apply. 3.1 unit of project project that has independent design documents, can be organized to construct independently, and can exert its production capacity or project benefits after completion in the construction project 3.2 subunit of project project that has independent design documents and can be organized to construct independently, but cannot independently exert its production capacity or project benefits after completion 3.3 commissioning production process with the production equipment of the construction project is based on the medium specified in the design documents, aiming at producing the products specified in the design documents 3.4 test run production process from commissioning to completion acceptance or obtaining production licensing   3.5 inspection and acceptance of project to be handed over acceptance of delivered project by the supervisor, project contractor and relevant units organized by the development organization according to the provisions of the project contract after the construction project has produced qualified products through commissioning, or has the conditions for use 3.6 specific inspection and acceptance acceptance of fire protection, lightning protection, occupational health, safety, environmental protection and other facilities and their implementation effects of the construction project by the competent administrative department of the government. 3.7 performance guarantee test activities of measuring and collecting data such as the designed production capacity, process indicators, product quality, equipment performance, automatic control level, consumption indicators and environmental protection indicators, and comparing, analyzing and evaluating them with the design value through the continuous operation within the specified period in the test run of petrochemical production devices 3.8 completion settlement final project fund settlement between the contractor and construction organization after the contractor completes the contracted project in accordance with the contract and has passed the acceptance, . 3.9 final accounting on project completion process by which the development organization compiles documents that comprehensively reflect all the construction costs, construction results and financial conditions of the completed project from the start of preparation to the delivery of the project and finally form the final accounts report, taking the quantity of physical objects and monetary indicators as the unit of measurement, in accordance with the relevant provisions of the state, and after the handover acceptance 3.10 final accounting audit on project completion audit and supervision of the authenticity, legality and efficiency of the final accounting on project completion and the project construction by the audit department during the acceptance of completed construction projects   3.11 inspection for acceptance of completed project process of completing the handover acceptance, specific inspection and acceptance, performance guarantee test, final accounting audit on project completion, archives acceptance of construction project, project acceptance conducted by relevant organizations and departments of the project organized by the project approval department or its authorized organization, passing the acceptance and signing the "Certificate for completion acceptance"
Contents of SH/T 3904-2014
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 General 5 Procedures and requirements of completion acceptance 5.1 Procedures of completion acceptance 5.2 Handover acceptance 5.3 Specific inspection and acceptance 5.4 Performance guarantee test 5.5 Final accounting audit on project completion 5.6 Archives acceptance 6 Completion acceptance 6.1 Conditions for completion acceptance 6.2 Organization for completion acceptance 7 Documents of completion acceptance 7.1 Report for completion acceptance 7.2 Certificate for completion acceptance Annex A (Normative) Performance guarantee test for petrochemical plant Annex B (Informative) Written content and format of the report for completion acceptance Annex C (Informative) Content and format of certificate for the completion acceptance Explanation of wording in this regulation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
SH/T 3904-2014, SH 3904-2014, SHT 3904-2014, SH/T3904-2014, SH/T 3904, SH/T3904, SH3904-2014, SH 3904, SH3904, SHT3904-2014, SHT 3904, SHT3904