Code of China Chinese Classification Professional Classification ICS Classification Latest Value-added Services

LoginRegister

Title Standard No. Implemented On
Specified failure load series and coupling dimensionsfor electric power fittingsGB/T 2315-20172018-7-1
Technical specification for intelligent coal system of thermal power plant Part 2: Coal unloading, conveying and blending equipmentT/CEC 156.2-20182018-4-1
Technical specification for intelligent coal system of thermal power plant Part 3: Equipment and facility for coal of weighting and analysisT/CEC 156.3-20182018-4-1
Technical specification for intelligent coal system of thermal power plant Part 5:Intelligent conrrol platformT/CEC 156.5-20182018-4-1
Technical specification for intelligent coal system of thermal power plant Part 1: Structure and function for intelligent coal systemT/CEC 156.1-20182018-4-1
Technical specification for intelligent coal system of thermal power plant Part 4:Equiphment and facility for coal yardT/CEC 156.4-20182018-4-1
Technical specification for intelligent coal system of thermal power plant Part 6: Fuel management information systemT/CEC 156.6-20182018-4-1
Specification of centralized control system for small hydropower stations groupNB/T 42033-20142014-11-1
Technical requirements and tests for damperDL/T 1099-20092009-12-1
~DL/T 1101-20092009-12-1
Requirements and tests for overhead line spacersDL/T 1098-20092009-12-1
Specification of autotest and real-time simulation to for hydraulic turbine governorDL/T 1120-20092009-12-1
Test method for electric power fittings - Part 3: Heat cycle tests for electric power fittingsGB/T 2317.3-20082009-10-1
Test method for electric power fittings - Part 2: Corona and RIV tests for electric power fittingsGB/T 2317.2-20082009-10-1
Test method for electric power fittings - Part 1: Mechanical testsGB/T 2317.1-20082009-10-1
Test method for electric power fittings - Part 4: Acceptance inspection for electric power fittingsGB/T 2317.4-20082009-10-1
Nominal failing load series and coupling dimensions for electric power fittingsGB/T 2315-20082009-8-1
General specification of central control equipment and system for electrical parts in power stations and substationsGB/T 11920-20082009-8-1
General specification for power system out-of-step separation equipmentDL/T 993-20062006-10-1
Design Standard of I&C Laboratory for Thermal Power PlantDL/T 5004-20042004-6-1
Transmission line tower--Technical reguiements for manufacturingGB/T 2694-20032003-12-1
Power system stability control deviceJB/T 6516-20022002-12-1
Electrical rotating speed signal equipmentJB/T 6514-20022002-12-1
Requirements and tests for overhead line spacersGB/T 2338-20022002-12-1
Electric Valve Actuators for Power StationDL/T 641-19972002-12-1
Remote terminal unit of distribution automation systemDL/T 721-20002001-1-1
Technical requirements for damperGB/T 2336-20002000-12-1
Nominal failing load series and coupling coupling dimension for electric power fittingsGB/T 2315-20002000-12-1
Corona and RIV tests for electric power fittingsGB/T 2317.2-20002000-1-2
Acceptance inspection,marking and packing for electric power fittingsGB/T 2317.4-20002000-1-2
Mechanical tests for electric power fittingsGB/T 2317.1-20002000-1-2
Heat cycle tests for electric power fittingsGB/T 2317.3-20002000-1-2
General technical conditions for control panel of AC movable power plantJB/T 8182-19992000-1-1
Power station for automation equipment terminologyJB/T 8185-19992000-1-1
flame-proof electric valve actuatorsDL/T 642-19971998-7-1
Terminology of power station automation equipmentGB 11475-19891990-1-1
SpacerGB/T 2338-19851985-12-1
DamperGB 2336-19851985-12-1
Terminology for electric power fittingGB/T 5075-19851985-12-1
Fittings acceptance inspection test methods marking and packingGB 2317-19851985-12-1
Transmission line towers--Technical requirements for manufacturingGB 2694-19811982-2-1
About Us Contact Us Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 Email: coc@codeofchina.com | Send me a messageQQ: 672269886
Copyright: Codeofchina Inc 2008-2020