2025-12-23 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering 300.0 via email in 1 business day valid,,2006-6-1
DL/T 809-2002 Water quality -- Determination of turbidity 274.0 via email in 1~3 business day superseded,2017-5-1,2002-9-1
DL/T 466-2004 Guide for type selection for pulverizers and pulverizing systems of power station 320.0 via email in 1 business day superseded,2018-3-1,2004-6-1
GB/T 26863-2011 Terminology of monitoring and control system of thermal power station 1500.0 via email in 1~5 business day superseded2023-07-01,2023-7-1,2011-12-1
DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction 480.0 via email in 1~3 business day valid,,2004-6-1
DL/T 467-1992 Test Codes for Pulverizers 480.0 via email in 1~5 business day superseded,2004-6-1,2004-6-1
DL/T 875-2004 Basic requirements for design and test of construction machines and tools of overhead transmission line 300.0 via email in 1~3 business day superseded,2016-6-1,2004-6-1
GB/T 8564-2003 Specification for Installation of Hydraulic Turbine Generator Uni 340.0 via email in 1 business day superseded,2023-11-27,1905-6-25
GB/T 31461-2015 Guide for run back and fast cut back control in fossil fuel power plant 220.0 via email in 1~3 business day superseded,2024-7-24,2015-12-1
DL/T 367-2010 Specification of instrumentation and control for large scale fan in fossil fuel power plant 120.0 via email in 1~3 business day superseded,2022-11-13,2010-10-1
DL/T 5358-2006 Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering 550.0 via email in 1~3 business day superseded,2025-3-24,2007-3-1
DL/T 468-2004 Guide on type selection and application for power boiler fans 680.0 via email in 1~3 business day superseded,2019-10-1,2004-6-1
DL/T 466-1992 Guide for Type Selection for Pulverizers and Pulverizing Systems of Power Station 270.0 via email in 1~3 business day superseded,2004-6-1,1989-10-1
DL/T 469-2004 Fans Performance Testing in Situ for Power Boiler 590.0 via email in 1 business day superseded,2022-11-13,2004-6-1
DL/T 5403-2007 Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant 1410.0 via email in 1~3 business day valid,,2008-6-1
DL/T 654-2009 The technical guide for the life assessment of units in fossil-fuel power plant 660.0 via email in 1~3 business day superseded,2023-5-4,2009-12-1
DL/T 851-2004 Acceptance tests for combined-cycle power plants 330.0 via email in 1~3 business day valid,,2004-6-1
DL/T 782-2001 Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above 330.0 via email in 1~3 business day valid,,2002-2-1
DL/T 5018-2004 Specification for Manufacture Erection and Acceptance of Steel Ga 240.0 via email in 1 business day superseded,2015-3-1,2005-4-1
DL/T 5399-2007 Design guide for vertical shiplift in hydropower and water resources projects 390.0 via email in 1~3 business day superseded2021-07-01 ,2021-7-1,2007-12-1
Previous Page     Next Page



Code of China
Search

DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering 
  Issued on: 2005-11-28   Price(USD): 300.0
DL/T 809-2002 Water quality -- Determination of turbidity 
  Issued on: 2002-4-27   Price(USD): 274.0
DL/T 466-2004 Guide for type selection for pulverizers and pulverizing systems of power station 
  Issued on: 2004-3-9   Price(USD): 320.0
GB/T 26863-2011 Terminology of monitoring and control system of thermal power station  
  Issued on: 2011-7-29   Price(USD): 1500.0
DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction 
  Issued on: 2004-3-9   Price(USD): 480.0
DL/T 467-1992 Test Codes for Pulverizers 
  Issued on:   Price(USD): 480.0
DL/T 875-2004 Basic requirements for design and test of construction machines and tools of overhead transmission line 
  Issued on: 2004-3-9   Price(USD): 300.0
GB/T 8564-2003 Specification for Installation of Hydraulic Turbine Generator Uni 
  Issued on: 2003-09-15   Price(USD): 340.0
GB/T 31461-2015 Guide for run back and fast cut back control in fossil fuel power plant 
  Issued on: 2015-05-15   Price(USD): 220.0
DL/T 367-2010 Specification of instrumentation and control for large scale fan in fossil fuel power plant 
  Issued on: 2010-5-1   Price(USD): 120.0
DL/T 5358-2006 Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering 
  Issued on: 2006-12-17   Price(USD): 550.0
DL/T 468-2004 Guide on type selection and application for power boiler fans 
  Issued on: 2004-3-9   Price(USD): 680.0
DL/T 466-1992 Guide for Type Selection for Pulverizers and Pulverizing Systems of Power Station 
  Issued on:   Price(USD): 270.0
DL/T 469-2004 Fans Performance Testing in Situ for Power Boiler 
  Issued on: 2004-03-09   Price(USD): 590.0
DL/T 5403-2007 Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant 
  Issued on: 2007-12-3   Price(USD): 1410.0
DL/T 654-2009 The technical guide for the life assessment of units in fossil-fuel power plant 
  Issued on: 2009-7-22   Price(USD): 660.0
DL/T 851-2004 Acceptance tests for combined-cycle power plants 
  Issued on: 2004-3-9   Price(USD): 330.0
DL/T 782-2001 Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above 
  Issued on: 2001-10-08   Price(USD): 330.0
DL/T 5018-2004 Specification for Manufacture Erection and Acceptance of Steel Ga 
  Issued on: 2004-10-20   Price(USD): 240.0
DL/T 5399-2007 Design guide for vertical shiplift in hydropower and water resources projects 
  Issued on: 2007-7-20   Price(USD): 390.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040