2025-12-21 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
SY/T 6708-2008 Daily drilling fluid report for oil and natural gas industry 135.0 via email in 1~3 business day superseded,2020-5-1,2008-12-1
SY/T 6707-2008 Specification for marine well site survey 450.0 via email in 1~3 business day superseded,2016-6-1,2008-12-1
SY/T 5814-2008 Determination for the content of humic acid in drilling agent containing the same 90.0 via email in 1~3 business day valid,,2008-12-1
SY/T 5504.4-2008 Evaluation method for well cement additives—Part 4:Accelerator 105.0 via email in 1~3 business day superseded,2020-5-1,2008-12-1
SY/T 5724-2008 Design method of casing string strength 390.0 via email in 1~3 business day to be superseded,2026-3-28,2008-12-1
SY/T 6543.1-2008 Technology specification for underbalanced drilling - Part 1:Liquid phase 270.0 via email in 1~3 business day superseded,2020-5-1,2008-12-1
SY/T 6240-2008 Chemical analysis method of barite 540.0 via email in 1~3 business day superseded,2016-6-1,2008-12-1
SY/T 6704-2007 The calibration method of inclinometer calibration facility 135.0 via email in 1~3 business day superseded,2020-5-1,2008-3-1
SY/T 5416.2-2007 Measurement and inspection regulation of directional surveying instruments Part 2: Electronic single-shots and mult-shots 195.0 via email in 1~3 business day superseded,2017-5-1,2008-3-1
SY/T 5467-2007 Specification for casing string pressure test 90.0 via email in 1~3 business day valid,,2008-3-1
SY/T 5416.4-2007 Measurement and inspection regulation of directional surveying instruments Part 4:Measurement while drilling with wireline 180.0 via email in 1~3 business day superseded,1998-7-1,2008-3-1
SY/T 5172-2007 Specifications for trajectory control in straight holes 135.0 via email in 1~3 business day superseded,2017-8-1,2008-3-1
SY/T 5480-2007 Specification for cementing design 405.0 via email in 1~5 business day superseded,2017-5-1,2008-3-1
SY/T 5089.1-2007 Well history format for drilling Part 1:Onshore drilling 825.0 via email in 1~5 business day superseded,2011-11-1,2008-3-1
SY/T 6676-2007 The calibration method of drilling fluid density meter 180.0 via email in 1~3 business day superseded,2023-5-4,2008-3-1
SY/T 6677-2007 Calibration method of mnd retort assembly 180.0 via email in 1~3 business day superseded,2023-5-4,2008-3-1
SY/T 5416.3-2007 Measurement and inspection regulation of directional surveying instruments Part 3: GYRO 270.0 via email in 1~3 business day superseded,2016-6-1,2008-3-1
SY/T 5840-2007 Recommended practice for laboratory testing of bridging materials for drilling fluids 120.0 via email in 1~3 business day superseded2025-03-24,2025-3-24,2008-3-1
GB/T 16783.1-2006 Petroleum and natural gas industries - Field testing of drilling fluids - Part 1: Water-based fluids 670.0 via email in 1~3 business day superseded,2015-6-1,2007-5-1
SY/T 5313-2006 Vocabulary of well drilling engineering 3030.0 via email in 1~3 business day abolished2015-01-14 ,,2007-4-1
Previous Page     Next Page



Code of China
Search

SY/T 6708-2008 Daily drilling fluid report for oil and natural gas industry 
  Issued on: 2008-6-16   Price(USD): 135.0
SY/T 6707-2008 Specification for marine well site survey 
  Issued on: 2008-6-16   Price(USD): 450.0
SY/T 5814-2008 Determination for the content of humic acid in drilling agent containing the same 
  Issued on: 2008-6-16   Price(USD): 90.0
SY/T 5504.4-2008 Evaluation method for well cement additives—Part 4:Accelerator 
  Issued on: 2008-06-16   Price(USD): 105.0
SY/T 5724-2008 Design method of casing string strength  
  Issued on: 2008-6-16   Price(USD): 390.0
SY/T 6543.1-2008 Technology specification for underbalanced drilling - Part 1:Liquid phase 
  Issued on: 2008-6-16   Price(USD): 270.0
SY/T 6240-2008 Chemical analysis method of barite 
  Issued on: 2008-06-16   Price(USD): 540.0
SY/T 6704-2007 The calibration method of inclinometer calibration facility 
  Issued on: 2007-10-8   Price(USD): 135.0
SY/T 5416.2-2007 Measurement and inspection regulation of directional surveying instruments Part 2: Electronic single-shots and mult-shots 
  Issued on: 2007-10-8   Price(USD): 195.0
SY/T 5467-2007 Specification for casing string pressure test 
  Issued on: 2007-10-08   Price(USD): 90.0
SY/T 5416.4-2007 Measurement and inspection regulation of directional surveying instruments Part 4:Measurement while drilling with wireline 
  Issued on: 2007-10-8   Price(USD): 180.0
SY/T 5172-2007 Specifications for trajectory control in straight holes 
  Issued on: 2007-10-08   Price(USD): 135.0
SY/T 5480-2007 Specification for cementing design 
  Issued on: 2007-10-08   Price(USD): 405.0
SY/T 5089.1-2007 Well history format for drilling Part 1:Onshore drilling 
  Issued on: 2007-10-08   Price(USD): 825.0
SY/T 6676-2007 The calibration method of drilling fluid density meter 
  Issued on: 2007-10-08   Price(USD): 180.0
SY/T 6677-2007 Calibration method of mnd retort assembly 
  Issued on: 2007-10-08   Price(USD): 180.0
SY/T 5416.3-2007 Measurement and inspection regulation of directional surveying instruments Part 3: GYRO 
  Issued on: 2007-10-08   Price(USD): 270.0
SY/T 5840-2007 Recommended practice for laboratory testing of bridging materials for drilling fluids 
  Issued on: 2007-10-08   Price(USD): 120.0
GB/T 16783.1-2006 Petroleum and natural gas industries - Field testing of drilling fluids - Part 1: Water-based fluids 
  Issued on: 2006-12-15   Price(USD): 670.0
SY/T 5313-2006 Vocabulary of well drilling engineering 
  Issued on: 2006-11-3   Price(USD): 3030.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040