2025-12-20 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
SY 5347-1989 224.0 via email in 1~3 business day superseded,1998-7-1,1989-10-1
NB/T 14004.1-2015 Shale Gas Cementing Engineering Part 1:Technical Specification 444.0 via email in 1~5 business day valid,,2016-3-1
SY/T 6395-1999 Procedure for testing heavy brines 345.0 via email in 1~3 business day valid,,1999-12-1
SY/T 6704-2007 The calibration method of inclinometer calibration facility 135.0 via email in 1~3 business day superseded,2020-5-1,2008-3-1
SY/T 5243-1991 Evaluation Procedure for Viscosity Reducer Used in Aqueous Drilling Fluid 180.0 via email in 1~3 business day valid,,1991-11-1
Q/CNPC 103-2004 195.0 via email in 1~3 business day valid,,2004-6-1
SY/T 10022.2-2000 Specification for Cementing Design of Offshore Oil well Unit 2: Design of Cementing Techique 240.0 via email in 1~3 business day abolished2011-10-01,,2000-10-1
SY/T 5089-2004 Daily drilling report of oil and natural gas 195.0 via email in 1~3 business day superseded,2012-12-1,2004-11-1
SY/T 6199-1996 75.0 via email in 1~3 business day superseded,2004-11-1,1997-6-1
SY/T 5964-2003 Combination, installation, adjustment and maintenance of well - control equipments 780.0 via email in 1~5 business day valid,,2003-8-1
SY/T 5679-1993 Lignitic Resin (SPNH) Used in Drilling Fluids 120.0 via email in 1~3 business day superseded2017-08-01,2017-8-1,1994-3-1
Q/CNPC 63.2-2002 180.0 via email in 1~3 business day valid,,2002-6-1
SY/T 5731-2012 Calculation method for wellhead hanging load of casing string 330.0 via email in 1~3 business day to be superseded,2026-3-28,2012-12-1
SY/T 6592-2004 Procedure for cement evaluation 450.0 via email in 1~3 business day superseded2017-05-01,2017-5-1,2004-11-1
SY/T 6199-2004 Drilling rig foundation specification 180.0 via email in 1 business day valid,,2004-11-1
SY/T 6243-1996 The engineering logging specification of hydrorcarbon exploratory well 150.0 via email in 1~3 business day superseded,2010-5-1,1997-9-1
SY/T 5678-2003 The rules for checking and accepting completed well 270.0 via email in 1~3 business day superseded,2017-8-1,2003-8-1
SY/T 6709-2008 Drilling technology rules for gypsolith and sale formation 105.0 via email in 1~3 business day valid,,2008-12-1
SY/T 6864-2012 Calibration method of drilling fluid funnel 180.0 via email in 1~3 business day valid,,2012-3-1
SY/T 5416.2-2007 Measurement and inspection regulation of directional surveying instruments Part 2: Electronic single-shots and mult-shots 195.0 via email in 1~3 business day superseded,2017-5-1,2008-3-1
Previous Page     Next Page



Code of China
Search

SY 5347-1989  
  Issued on:   Price(USD): 224.0
NB/T 14004.1-2015 Shale Gas Cementing Engineering Part 1:Technical Specification 
  Issued on: 2015-10-27   Price(USD): 444.0
SY/T 6395-1999 Procedure for testing heavy brines 
  Issued on: 1999-05-17   Price(USD): 345.0
SY/T 6704-2007 The calibration method of inclinometer calibration facility 
  Issued on: 2007-10-8   Price(USD): 135.0
SY/T 5243-1991 Evaluation Procedure for Viscosity Reducer Used in Aqueous Drilling Fluid  
  Issued on: 1991-7-19   Price(USD): 180.0
Q/CNPC 103-2004  
  Issued on: 2004-03-31   Price(USD): 195.0
SY/T 10022.2-2000 Specification for Cementing Design of Offshore Oil well Unit 2: Design of Cementing Techique 
  Issued on: 2000-04-10   Price(USD): 240.0
SY/T 5089-2004 Daily drilling report of oil and natural gas 
  Issued on: 2004-07-03   Price(USD): 195.0
SY/T 6199-1996  
  Issued on: 1996-11-15   Price(USD): 75.0
SY/T 5964-2003 Combination, installation, adjustment and maintenance of well - control equipments 
  Issued on: 2003-03-18   Price(USD): 780.0
SY/T 5679-1993 Lignitic Resin (SPNH) Used in Drilling Fluids 
  Issued on: 1993-9-9   Price(USD): 120.0
Q/CNPC 63.2-2002  
  Issued on:   Price(USD): 180.0
SY/T 5731-2012 Calculation method for wellhead hanging load of casing string 
  Issued on: 2012-8-23   Price(USD): 330.0
SY/T 6592-2004 Procedure for cement evaluation 
  Issued on: 2004-07-03   Price(USD): 450.0
SY/T 6199-2004 Drilling rig foundation specification 
  Issued on: 2004-7-3   Price(USD): 180.0
SY/T 6243-1996 The engineering logging specification of hydrorcarbon exploratory well 
  Issued on: 1996-12-31   Price(USD): 150.0
SY/T 5678-2003 The rules for checking and accepting completed well 
  Issued on: 2003-3-18   Price(USD): 270.0
SY/T 6709-2008 Drilling technology rules for gypsolith and sale formation 
  Issued on: 2008-6-16   Price(USD): 105.0
SY/T 6864-2012 Calibration method of drilling fluid funnel 
  Issued on: 2012-01-04   Price(USD): 180.0
SY/T 5416.2-2007 Measurement and inspection regulation of directional surveying instruments Part 2: Electronic single-shots and mult-shots 
  Issued on: 2007-10-8   Price(USD): 195.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040