![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
SY/T 6708-2008 Daily drilling fluid report for oil and natural gas industry
Issued on: 2008-6-16 Price(USD): 135.0 |
|
SY/T 6707-2008 Specification for marine well site survey
Issued on: 2008-6-16 Price(USD): 450.0 |
|
SY/T 5814-2008 Determination for the content of humic acid in drilling agent containing the same
Issued on: 2008-6-16 Price(USD): 90.0 |
|
SY/T 5504.4-2008 Evaluation method for well cement additives—Part 4:Accelerator
Issued on: 2008-06-16 Price(USD): 105.0 |
|
SY/T 5724-2008 Design method of casing string strength
Issued on: 2008-6-16 Price(USD): 390.0 |
|
SY/T 6543.1-2008 Technology specification for underbalanced drilling - Part 1:Liquid phase
Issued on: 2008-6-16 Price(USD): 270.0 |
|
SY/T 6240-2008 Chemical analysis method of barite
Issued on: 2008-06-16 Price(USD): 540.0 |
|
SY/T 6704-2007 The calibration method of inclinometer calibration facility
Issued on: 2007-10-8 Price(USD): 135.0 |
|
SY/T 5416.2-2007 Measurement and inspection regulation of directional surveying instruments Part 2: Electronic single-shots and mult-shots
Issued on: 2007-10-8 Price(USD): 195.0 |
|
SY/T 5467-2007 Specification for casing string pressure test
Issued on: 2007-10-08 Price(USD): 90.0 |
|
SY/T 5416.4-2007 Measurement and inspection regulation of directional surveying instruments Part 4:Measurement while drilling with wireline
Issued on: 2007-10-8 Price(USD): 180.0 |
|
SY/T 5172-2007 Specifications for trajectory control in straight holes
Issued on: 2007-10-08 Price(USD): 135.0 |
|
SY/T 5480-2007 Specification for cementing design
Issued on: 2007-10-08 Price(USD): 405.0 |
|
SY/T 5089.1-2007 Well history format for drilling Part 1:Onshore drilling
Issued on: 2007-10-08 Price(USD): 825.0 |
|
SY/T 6676-2007 The calibration method of drilling fluid density meter
Issued on: 2007-10-08 Price(USD): 180.0 |
|
SY/T 6677-2007 Calibration method of mnd retort assembly
Issued on: 2007-10-08 Price(USD): 180.0 |
|
SY/T 5416.3-2007 Measurement and inspection regulation of directional surveying instruments Part 3: GYRO
Issued on: 2007-10-08 Price(USD): 270.0 |
|
SY/T 5840-2007 Recommended practice for laboratory testing of bridging materials for drilling fluids
Issued on: 2007-10-08 Price(USD): 120.0 |
|
GB/T 16783.1-2006 Petroleum and natural gas industries - Field testing of drilling fluids - Part 1: Water-based fluids
Issued on: 2006-12-15 Price(USD): 670.0 |
|
SY/T 5313-2006 Vocabulary of well drilling engineering
Issued on: 2006-11-3 Price(USD): 3030.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||