| Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
| SY/T 0600-2009 |
Prediction of scaling tendency in oil-field water |
130.0 |
via email in 1~3 business day |
superseded,2017-5-1,2010-5-1 |
|
| SY/T 0601-2009 |
Determination of emulsified oil and soluble oil in water |
130.0 |
via email in 1~3 business day |
superseded,2017-5-1,2010-5-1 |
|
| SY/T 6300-2009 |
Specifications of paraffin removres and paraffin inhibitors applied in oil production |
240.0 |
via email in 1~3 business day |
abolished2025-03-24,2025-3-24,2010-5-1 |
|
| SY/T 6377-2008 |
The regulation of fish impression |
75.0 |
via email in 1~3 business day |
superseded,2019-3-1,2008-12-1 |
|
| SY/T 5628-2008 |
Hydraulic anchor |
150.0 |
via email in 1~3 business day |
abolished2018-08-24,,2008-12-1 |
|
| SY/T 5862-2008 |
Technical criterions of polymer for oil displacement |
240.0 |
via email in 1~3 business day |
superseded,2021-2-1,2008-12-1 |
|
| SY/T 5182-2008 |
Wire-wrapped stainless steel screen pipe |
180.0 |
via email in 1~3 business day |
abolished2018-08-24,,2008-12-1 |
|
| SY/T 5337-2008 |
Gravel packing tool |
120.0 |
via email in 1~3 business day |
superseded,2016-6-1,2008-12-1 |
|
| SY/T 5627-2008 |
Steel ball deliver |
120.0 |
via email in 1~3 business day |
superseded2017-05-01,2017-5-1,2008-12-1 |
|
| SY/T 6740-2008 |
The calibration method of caliper |
150.0 |
via email in 1~3 business day |
valid,,2008-12-1 |
|
| SY/T 6376-2008 |
General technical specifications of fracturing fluids |
150.0 |
via email in 1~3 business day |
abolished2018-08-24,,2008-12-1 |
|
| SY/T 6743-2008 |
The caliration method of gamma-ray tool |
210.0 |
via email in 1~3 business day |
superseded,2020-5-1,2008-12-1 |
|
| SY/T 6380-2008 |
Test methods of breaker properties for fracturing |
165.0 |
via email in 1~3 business day |
superseded2025-03-24,2025-3-24,2008-12-1 |
|
| SY/T 5626-2008 |
Sliding sleeve sand jet |
120.0 |
via email in 1~3 business day |
superseded,2017-5-1,2008-12-1 |
|
| SY/T 5289-2008 |
Fracturing design,treatment and post-fracturing effect evaluation methods of oil,gas and injection wells |
750.0 |
via email in 1~3 business day |
superseded2016-06-01,2016-6-1,2008-12-1 |
|
| SY/T 5185-2008 |
Evaluation methods of water-based carrying fluid for gravel packing sand control |
105.0 |
via email in 1~3 business day |
superseded,2016-6-1,2008-12-1 |
|
| SY/T 6690-2008 |
Specification for well control technology of downhole operation |
420.0 |
via email in 1~5 business day |
superseded,2016-6-1,2008-12-1 |
|
| SY/T 5745-2008 |
Major terms of oil & gas production engineering |
1500.0 |
via email in 1~3 business day |
superseded,2025-6-25,2008-12-1 |
|
| SY/T 5625-2008 |
Hydrostatic packer |
210.0 |
via email in 1~3 business day |
superseded,2020-5-1,2008-12-1 |
|
| SY/T 5834-2007 |
Performance specifications and measuring methods of low-solid killing fluid |
165.0 |
via email in 1~3 business day |
superseded,2015-3-1,2008-3-1 |
|
|
|