2025-12-21 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
T/CSPSTC 70-2021 Technical code of practice for monitoring and measuring of segmental precast assembled bridges by short line method 495.0 via email in 1~5 business day valid,,
DB36/T 1008-2018 Technical specification for construction of super wide concrete box girder of hybrid girder cable-stayed bridge 495.0 via email in 1~5 business day valid,,
DB32/T 4002-2021 General technical condition of pre-fabricated parallel wire strand for the long span suspension bridge via email in business day valid,,2021-4-4
T/TMAC 016-2019 via email in business day valid,,
T/TMAC 017-2019 255.0 via email in 1~3 business day valid,,2019-11-25
T/CAPE 11001-2019 315.0 via email in 1~5 business day valid,,
DB36/T 1197-2019 Procedure for evaluating compaction density of prestressed tunnel grouting of bridges via email in business day abolished2025-11-09,,2020-6-1
JT/T 1266-2019 Technical conditions of cold sprayed zinc anticorrosive for bridge steel structure 220.0 via email in 1~3 business day valid,,2019-9-1
DB36/T 1137-2019 Guide for application of BIM technology in bridge engineering via email in business day abolished2025-11-09,,2020-1-1
DB32/T 3644-2019 Code for fatigue crack inspection, evaluation and maintenance of steel box girder in highway bridges via email in business day valid,,2019-10-31
DB37/T 3487-2019 Specification for construction of steel inland pontoon boats in Shandong province via email in business day valid,,2019-3-1
DB37/T 3549-2019 Code for Long Span Prestressed Concrete Composite Girder Bridge with Corrugated Steel Webs via email in business day valid,,2019-6-29
JT/T 1270.3-2019 Expansion and contraction installation with comb plate for highway bridge-Part 3:Integrated anchorage expansion and contraction installation 305.0 via email in 1~3 business day valid,,2019-9-1
JT/T 1269-2019 Plate type rubber expansion device for highway bridge 305.0 via email in 1~3 business day valid,,2019-9-1
JT/T 1268-2019 Retard-bonded prestressing steel strand and special anchorage for bridges 305.0 via email in 1~3 business day valid,,2019-9-1
JT/T 1267-2019 Prestressing carbon fiber plate-gripping anchorage for bridge 344.0 via email in 1~5 business day valid,,2019-9-1
JT/T 1265-2019 Method of tension detection for bridge prestressing fine-rolling screw-thread steel bars 344.0 via email in 1~5 business day valid,,2019-9-1
JT/T 391-2019 Pot bearing for highway bridge 340.0 via email in 1 business day valid,,2019-9-1
JT/T 4-2019 Laminated bearing for highway bridge 650.0 via email in 1~5 business day valid,,2019-9-1
DB13/T 2949-2019 via email in business day abolished2025-10-08,,2019-4-25
Previous Page     Next Page



Code of China
Search

T/CSPSTC 70-2021 Technical code of practice for monitoring and measuring of segmental precast assembled bridges by short line method 
  Issued on: 2021-10-12   Price(USD): 495.0
DB36/T 1008-2018 Technical specification for construction of super wide concrete box girder of hybrid girder cable-stayed bridge 
  Issued on: 2018-03-05   Price(USD): 495.0
DB32/T 4002-2021 General technical condition of pre-fabricated parallel wire strand for the long span suspension bridge 
  Issued on: 2021-03-04   Price(USD):
T/TMAC 016-2019  
  Issued on:   Price(USD):
T/TMAC 017-2019  
  Issued on: 2019-10-29   Price(USD): 255.0
T/CAPE 11001-2019  
  Issued on:   Price(USD): 315.0
DB36/T 1197-2019 Procedure for evaluating compaction density of prestressed tunnel grouting of bridges 
  Issued on: 2019-12-27   Price(USD):
JT/T 1266-2019 Technical conditions of cold sprayed zinc anticorrosive for bridge steel structure 
  Issued on: 2019-5-30   Price(USD): 220.0
DB36/T 1137-2019 Guide for application of BIM technology in bridge engineering 
  Issued on: 2019-07-03   Price(USD):
DB32/T 3644-2019 Code for fatigue crack inspection, evaluation and maintenance of steel box girder in highway bridges 
  Issued on: 2019-09-19   Price(USD):
DB37/T 3487-2019 Specification for construction of steel inland pontoon boats in Shandong province 
  Issued on: 2019-01-29   Price(USD):
DB37/T 3549-2019 Code for Long Span Prestressed Concrete Composite Girder Bridge with Corrugated Steel Webs 
  Issued on: 2019-05-29   Price(USD):
JT/T 1270.3-2019 Expansion and contraction installation with comb plate for highway bridge-Part 3:Integrated anchorage expansion and contraction installation  
  Issued on: 2019-5-30   Price(USD): 305.0
JT/T 1269-2019 Plate type rubber expansion device for highway bridge 
  Issued on: 2019-5-30   Price(USD): 305.0
JT/T 1268-2019 Retard-bonded prestressing steel strand and special anchorage for bridges 
  Issued on: 2019-5-30   Price(USD): 305.0
JT/T 1267-2019 Prestressing carbon fiber plate-gripping anchorage for bridge 
  Issued on: 2019-5-30   Price(USD): 344.0
JT/T 1265-2019 Method of tension detection for bridge prestressing fine-rolling screw-thread steel bars 
  Issued on: 2019-5-30   Price(USD): 344.0
JT/T 391-2019 Pot bearing for highway bridge 
  Issued on: 2019-05-30   Price(USD): 340.0
JT/T 4-2019 Laminated bearing for highway bridge 
  Issued on: 2019-05-30   Price(USD): 650.0
DB13/T 2949-2019  
  Issued on: 2019-03-25   Price(USD):
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040