2025-12-21 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
SY/T 5755-1995 Performance evaluation method for cleanup additive for fracture and acidificaiton 90.0 via email in 1~3 business day superseded,2016-6-1,1996-6-30
SY/T 6888-2012 Technical specifications for microbial displacement 210.0 via email in 1~3 business day valid,,2012-12-1
NB/T 14002.3-2015 Shale gas reservoir stimulation Part 3:recycling and disposal methods of fracturing flowback water 154.0 via email in 1~3 business day superseded,2023-5-4,2016-3-1
SY/T 6124-1995 165.0 via email in 1~3 business day superseded,2010-12-15,1996-6-30
SY/T 6528-2002 Test method of the rock dielectric constant 270.0 via email in 1~3 business day valid,,2002-8-1
SY/T 5694-1995 Acid densifier CT1-6 for acidification 90.0 via email in 1~3 business day superseded,2016-6-1,1995-11-1
SY/T 0601-2009 Determination of emulsified oil and soluble oil in water 130.0 via email in 1~3 business day superseded,2017-5-1,2010-5-1
SY/T 5971-1994 Evaluation method for performance of clay stabilizer for water injection 90.0 via email in 1~3 business day superseded,2016-6-1,1995-7-1
SY/T 6484-2013 Recommended Practices for Operation, Maintenance, Surveillance and Troubleshooting of Gas-lift Installations 960.0 via email in 1~5 business day valid,,2014-4-1
SY/T 6485-2000 Specification for oil production engineering project in polymer flooding 180.0 via email in 1~3 business day superseded,2018-3-1,2001-6-1
SY/T 6484-2000 Recommended practice for operation, maintenance, and trouble-shooting of gas lift installations 820.0 via email in 1~5 business day superseded,2005-11-1,2001-6-1
SY/T 5107-2005 Recommended practices on measuring the properties of water-based fracturing fluid 195.0 via email in 1~3 business day superseded2017-5-1,2017-5-1,2005-10-1
SY/T 6486-2000 Recommended opertional method for preventing of clay - Swelling and fine-migration in acidizing of water injection well 270.0 via email in 1~3 business day superseded,2018-3-1,2001-6-1
SY/T 0532-1993 150.0 via email in 1~3 business day abolished2012-03-01,2012-3-1,1994-6-1
SY/T 5183-2000 Evaluation method for sand control effect of oil well 60.0 via email in 1~3 business day superseded,2017-5-1,2000-10-1
SY/T 6119-1995 380.0 via email in 1~3 business day superseded,2012-3-1,
SY/T 6644-2006 Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves 975.0 via email in 1~3 business day superseded,2019-3-1,2005-10-1
SY/T 5182-2008 Wire-wrapped stainless steel screen pipe 180.0 via email in 1~3 business day abolished2018-08-24,,2008-12-1
SY/T 6300-2009 Specifications of paraffin removres and paraffin inhibitors applied in oil production 240.0 via email in 1~3 business day abolished2025-03-24,2025-3-24,2010-5-1
SY/T 5674-1993 Method for compiling well history of prodution well and water injection well 360.0 via email in 1~3 business day superseded,2017-8-1,1994-3-1
Previous Page     Next Page



Code of China
Search

SY/T 5755-1995 Performance evaluation method for cleanup additive for fracture and acidificaiton 
  Issued on: 1995-12-25   Price(USD): 90.0
SY/T 6888-2012 Technical specifications for microbial displacement 
  Issued on: 2012-8-23   Price(USD): 210.0
NB/T 14002.3-2015 Shale gas reservoir stimulation Part 3:recycling and disposal methods of fracturing flowback water 
  Issued on: 2015-10-27   Price(USD): 154.0
SY/T 6124-1995  
  Issued on: 1995-12-25   Price(USD): 165.0
SY/T 6528-2002 Test method of the rock dielectric constant 
  Issued on: 2002-5-28   Price(USD): 270.0
SY/T 5694-1995 Acid densifier CT1-6 for acidification  
  Issued on: 1995-4-25   Price(USD): 90.0
SY/T 0601-2009 Determination of emulsified oil and soluble oil in water 
  Issued on: 2009-12-31   Price(USD): 130.0
SY/T 5971-1994 Evaluation method for performance of clay stabilizer for water injection 
  Issued on: 1995-1-1   Price(USD): 90.0
SY/T 6484-2013 Recommended Practices for Operation, Maintenance, Surveillance and Troubleshooting of Gas-lift Installations 
  Issued on: 2013-11-28   Price(USD): 960.0
SY/T 6485-2000 Specification for oil production engineering project in polymer flooding 
  Issued on: 2000-12-12   Price(USD): 180.0
SY/T 6484-2000 Recommended practice for operation, maintenance, and trouble-shooting of gas lift installations 
  Issued on: 2000-12-12   Price(USD): 820.0
SY/T 5107-2005 Recommended practices on measuring the properties of water-based fracturing fluid 
  Issued on: 2005-7-26   Price(USD): 195.0
SY/T 6486-2000 Recommended opertional method for preventing of clay - Swelling and fine-migration in acidizing of water injection well 
  Issued on: 2000-12-12   Price(USD): 270.0
SY/T 0532-1993  
  Issued on: 1994-01-06   Price(USD): 150.0
SY/T 5183-2000 Evaluation method for sand control effect of oil well 
  Issued on: 2000-3-10   Price(USD): 60.0
SY/T 6119-1995  
  Issued on: 1995-12-25   Price(USD): 380.0
SY/T 6644-2006 Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves 
  Issued on: 2005-7-26   Price(USD): 975.0
SY/T 5182-2008 Wire-wrapped stainless steel screen pipe 
  Issued on: 2008-6-16   Price(USD): 180.0
SY/T 6300-2009 Specifications of paraffin removres and paraffin inhibitors applied in oil production 
  Issued on: 2009-12-31   Price(USD): 240.0
SY/T 5674-1993 Method for compiling well history of prodution well and water injection well  
  Issued on: 1993-9-9   Price(USD): 360.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040