![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
SY/T 5337-2008 Gravel packing tool
Issued on: 2008-6-16 Price(USD): 120.0 |
|
SY/T 6487-2000 Recommended practices for liquid CO2 huff and puff
Issued on: 2000-12-12 Price(USD): 320.0 |
|
SY/T 6645-2006 Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir
Issued on: 2005-7-26 Price(USD): 255.0 |
|
SY/T 5827-2013 Process of Releasing and Fishing
Issued on: 2013-11-28 Price(USD): 210.0 |
|
SY/T 5904-2004 Recommended practice for sizing and selection of electric submersible pump installation
Issued on: 2004-7-3 Price(USD): 210.0 |
|
SY/T 6678-2007 The calibration methodology of the electronic dynamometer
Issued on: 2007-10-8 Price(USD): 135.0 |
|
SY/T 6118-2013 The Technical Specifications for Water Processing System Operation of Thermal Recovery Steam Generator
Issued on: 2013-11-28 Price(USD): 120.0 |
|
SY/T 5587.14-2013 Codes for Conventional Workover Job - Part 14:Cementing Pug and Drilling Out
Issued on: 2013-11-28 Price(USD): 210.0 |
|
NB/T 14002.4-2015 Shale gas reservoir stimulation Part 4:Recommended practice for the technology of combined pumping fracturing plug and perforation in horizontal well
Issued on: 2015-10-27 Price(USD): 344.0 |
|
SY/T 5627-2008 Steel ball deliver
Issued on: 2008-06-16 Price(USD): 120.0 |
|
SY/T 6740-2008 The calibration method of caliper
Issued on: 2008-06-16 Price(USD): 150.0 |
|
SY/T 5339-2000 Recommended practice for sand control technology of artificial borehole
Issued on: 2000-03-10 Price(USD): 300.0 |
|
Q/CNPC 25-1999 Design Specifications for Compression Fracture of Oil-Water Well
Issued on: Price(USD): 120.0 |
|
SY/T 6120-2013 Specification for Blowout Prevention during Down-hole Operations in Oil Well
Issued on: 2013-11-28 Price(USD): 120.0 |
|
SY/T 5811-1993 General Technical Specification for Silicate Series Plugging Agent
Issued on: 1993-9-9 Price(USD): 90.0 |
|
SY/T 5587.3-2013 Codes for Conventional Workover Job - Part 3: Killing Well, Displaced Flow and Induced Flow
Issued on: 2013-11-28 Price(USD): 210.0 |
|
SY/T 6376-2008 General technical specifications of fracturing fluids
Issued on: 2008-06-16 Price(USD): 150.0 |
|
SY/T 6847-2012 Technical criterion for igneous reservoir fracturing
Issued on: 2012-01-04 Price(USD): 390.0 |
|
SY/T 5791-2007 The operating procedures for lifting and laying down of hydraulic workover rigs mast
Issued on: 2007-10-08 Price(USD): 120.0 |
|
SY/T 6743-2008 The caliration method of gamma-ray tool
Issued on: 2008-06-16 Price(USD): 210.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||